SPE60324R0507-0001 w Att A.pdf
PDF 1 MB Posted
- Attached to
- Contractor-Owned, Contractor Operated (COCO) Fuel Storage Services in the Arabian Gulf area
- Solicitation number
- SPE603-24-R-0507
- Issued by
-
Defense Logistics Agency Energy
About this file
This document is an amendment to a solicitation for Contractor-Owned, Contractor-Operated (COCO) fuel storage services in the Arabian Gulf area on a 24-hour, 7-day per week basis. The solicitation is issued by the Defense Logistics Agency (DLA) Energy.
The key details are:
- The solicitation number is SPE603-24-R-0507.
- The amendment revises the solicitation issue date, extends the closing and offer due date, revises the question due date, and states the revised Request for Proposal (RFP) attached supersedes all previous versions.
- The required services are for OCONUS COCO bulk fuel services, with a total storage capacity of 465,000 barrels of F76 and 250,000 barrels of JP5/F44. Offerors must provide pricing for a base period of November 1, 2024 to October 31, 2028, and an option period of November 1, 2028 to October 31, 2033.
- The solicitation includes a Performance Work Statement (PWS), price proposal form, quality assurance provisions, and other standard solicitation attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPE60324R0507-0002.pdf | ||
| SPE60324R0507 .pdf | ||
| Attachment V - PPQ.pdf | ||
| Attachment II - PPF.pdf | ||
| Attachment III - QAPS .pdf | ||
| Attachment I - PWS.pdf | ||
| Attachment IV - Consent Form.pdf | ||
| Attachment VI - PPRL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60324R0507
X
2024 SEP 05
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
17 SEPT 2024
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2024 SEP 05 / 2024 OCT 09
TIME 9:00 AM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60324R0507 - 0001
This amendment is hereby issued under the above solicitation to:
A. Revise the solicitation issue date from Thursday, September 5, 2024 to Monday, September 9, 2024 to coincide with the date the solicitation was posted in SAM.gov.
B. Extend the closing date and offer due date to Wednesday, October 9, 2024, at 9:00 a.m. local Fort Belvoir, VA time.
C. Revise the day the questions are due in the RFP from “Friday, September 17, 2024” to “Friday, September 20, 2024.”
D. The revised RFP, included in this amendment as Attachment A, supersedes all previous versions. Revisions are highlighted and can be found on page 152.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60324R0507 - 0001
Attachments
List of Attachments
Description File Name
ATTACH_SPE60324R050
7_0001_Attachement_A
SPE60324R0507-0001
Attachment A.pdf
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 7006731507
1. REQUISITION NUMBER
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
SPE603-24-R-0507
5. SOLICITATION NUMBER
2024 SEP 05
6. SOLICITATION ISSUE
DATE
Christopher Kidwell FPL1393
a. NAME
Phone: 571-767-8727
b. TELEPHONE NUMBER (No Collect calls)
2024 OCT 04
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY CODE SPE603
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
USA
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
8 (A)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
493190NAICS:
SIZE STANDARD:
11. DELIVERYFOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/ CODE
OFFEROR
FACILITY
CODE
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See Schedule
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
SEE SCHEDULE
09:00 AM
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE ADDENDUM
EDWOSB
32a. QUANTITY IN COLUMN 21 HAS BEEN
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED
COMPLETE PARTIAL FINAL
STANDARD FORM 1449 (REV. 2/2012) BACK
36. PAYMENT
PARTIAL FINAL
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42b. RECEIVED AT (Location)
Attachment A: RFP
Amendment 0001
SPE603-24-R-0507 RFP/Arabian Gulf
TABLE OF CONTENTS
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991) 8
SECTION C - SPECIFICATIONS/STATEMENT OF WORK
C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988) 12
C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998) 12
C-0003 C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY
JAN 2012)
SECTION E - INSPECTION AND ACCEPTANCE
52.246-4 52.246-4 INSPECTION OF SERVICE – FIXED PRICE (AUG 1996) 13
THE QUALITY ASSURANCE PROVISIONS PERTIAINING TO THE INSPECTION OF SERVICES,
INSPECTION OFFICES, AND NONCONFORMING SUPPLIES AND SERVICES, REFERENCED IN
SECTION J, ARE FOUND IN ATTACHMENT V, OF THIS SOLICITATION AND INCORPORATED
HEREIN
SECTION F- DELIVERIES OR PERFORMANCE
F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017) 14
F-0002 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997) 17
F-0003 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014) 21
F-0004 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997) 22
F-0005 F45.01 OPERATION OF CONDUCTIVITY ADDITIVE SYSTEM (DLA ENERGY JAN 2014) 24
F-0006 F45.03 OPERATION OF FUEL SYSTEM ICING INHIBITOR ADDITIVE SYSTEM CONTRACTOR-
OWNED CONTRACTOR-OPERATED (COCO) (DLA ENERGY JAN 2014)
F-0007 F45.04 OPERATION OF CORROSION INHIBITOR/LUBRICITY IMPROVER ADDITIVE SYSTEM, CONTRACTOR-OWNED CONTRACTOR-OPERATED (COCO) (DLA ENERGY JAN 2014)
F-0008 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY DEC
1991)
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-
ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018) 26
252.232-
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEVIATION) (JAN 2023) 29
G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998) 31
G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY JAN 2017) 31
G-0003 G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE
TRANSFER SYSTEM (DLA ENERGY JAN 2012)
G-0004 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009) 36
G-0005 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997) 36
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982) 36
H-0002 H19.01 REPORTING AND CONTAINING OIL SPILLS (OVERSEAS STORAGE) (DLA ENERGY
JAN 1982)
PROCUREMENT NOTE H14 CONTRACTOR PERSONNEL SECURTY REQUIREMENTS (DEC
2021)
SECTION I - CONTRACT CLAUSES
SPE603-24-R-0507 RFP/Arabian Gulf
52.204-27 PROHIBITION ON BYTEDANCE COVERED APPLICATION (JUN 2023) 40
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2023)
Addendum 1 to 52.212-
ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (NOV 2023) REFERENCES 52.243-1 CHANGES-
FIXED PRICE (AUG 1987) ALTERNATE II (APR 1984)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY
2024)
52.215-8 ORDER OF PRECEDENCE UNIFORM CONTRACT FORMAT (OCT 1997) 58
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) 58
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) 59
52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR
TRANSACTIONS RELATING TO IRAN – REPRESENTATION AND CERTIFICAITONS (JUN 2020)
52.226-7 DRUG-FREE WORKPLACE (MAY 2024) 61
52.229-6 TAXES – FOREIGN FIXED-PRICE CONTRACTS (FEB 2013) 63
52.232-1 PAYMENTS (APR 1984)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR
2023)
52.233-1 DISPUTES (MAY 2014) 66
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)(APR 2012) 68
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE (APR 1984) 72
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) 73
52.253-1 COMPUTER GENERATED FORMS (JAN 1991) 74
252.201-
CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991) 74
252.204-
LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED
CYBER INCIDENT INFORMATION (JAN 2023)
252.204-
SAFEGUARDING COVERED DEFENSE INFRMATION AND CYBER INCIDENT REPORTING
(MAY 2024)(DEVIATION 2024-O0013)
252.204-
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES (JAN 2023)
252.204-
NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) 84
252.204-
CYBERSECURITY MATURITY MODEL CERTIFICATION REQUIREMENTS (JAN 2023) 88
252.204-
REPORTING REQUIREMENTS FOR CONTRACTED SERVICES—BASIC (JUL 2021) 88
252.205-
PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (JUN 2023) 89
252.222-
COMPLIANCE WITH LOCAL LABOR LAWS (OVERSEAS)(JUN 1997) 89
252.225-
CORRESPONDENCE IN ENGLISH (JUN 1997) 90
252.225-
ANTITERRORISM/FORCE PROTECTION FOR DEFENCE CONTRACTORS OUTSIDE THE
UNISTED STATES (JUN 2015)
252.225- PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 91
SPE603-24-R-0507 RFP/Arabian Gulf
7056 2023)
252.225-
PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS (DEVIATION
2024-O0006)(FEB 2024)
252.232-
ASSIGNMENT OF CLAIMS (OVERSEAS)(JUN 1997) 93
252.233-
CHOICE OF LAW (OVERSEAS)(JUN 1997) 94
252.246-
SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS
(OCT 2010)
252.247-
TRANSPORATION OF SUPPLIES BY SEA (JAN 2023) 95
52.233-9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (JUN 2020) 97
I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUN 2009) 98
I-0002 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS
(DLA ENERGY FEB 1996)
I-0003 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY
JAN 2012)
I-0004 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY OCT
2023)
I-0005 I147 DEMURRAGE (DLA ENERGY NOV 1989) 108
I-0006 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012) 108
I-0007 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009) 109
I-0008 I385 NOTIFICATION OF CONTRACTING OFFICER IN THE EVENT OF DISCOVERY OF
EVIDENCE OF FRAUD UNDER THE CONTRACT (DLA ENERGY JUL 2008)
SECTION J – ATTACHMENTS
PERFORMANCE WORK STATEMENT (PWS) Attach I
PRICE PROPOSAL FORM Attach
II
DLA ENERGY QUALITY ASSURANCE PROVISIONS (E-QAPS) Attach
III
PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM Attach
IV
PAST PERFORMANCE QUESTIONNAIRE Attach V
PAST PERFORMANCE REFERENCE LIST Attach
VI
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR
RESPONDENTS
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) 110
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEP 2007)
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS – REPRESENTATION (JAN 2017)
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020) 112
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
SPE603-24-R-0507 RFP/Arabian Gulf
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-REPRESENTATION (OCT
2020)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS –
REPRESENTATION (NOV 2015)
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (AUG 2020) 117
52.209-7
INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 119
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (MAY 2024)(ALTERNATE I (FEB 2024)
52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999) 143
52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984) 143
52.223-22 PUBLIC DISCLOSURE OF GREENHOUSE GAS EMISSIONS AND REDUCTION GOALS –
REPRESENATION (DEC 2016)
52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS – NOTICE AND REPRESENTATION (JUN 2020) 144
252.203-
REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2022) 146
252.204-
COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT
2016)
252.204-
COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES—
REPRESENTATION (DEC 2019)
252.204-
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES—REPRESENTATION (MAY 2021)
252.225-
DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A COUNTRY THAT
IS A STATE SPONSOR OF TERRORISM (DEC 2022)
252.225-
REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME
(MAY 2022)
252.225-
PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS-
REPRESENTATION (DEVIATION 2024-O0006)(MAR 2024)
252.225-
REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME
(DEVIATION 2020-O0005)(FEB 2020)
K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009) 152
K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) 153
K-0003 K150 WIDE AREA WORKFLOW (DLA ENERGY MAY 2014) 153
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020) 153
52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND COMMERICAL SERVICES
(SEP 2023)
Addendum to 52.212-1
ADDENDUM TO 52.212-1 – INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS
AND COMMERICAL SERVICES (SEP 2023)
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) 158
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991) 158
52.216-1 TYPE OF CONTRACT (APR 1984) 158
52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999) 158
52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (OCT 2020) 158
SPE603-24-R-0507 RFP/Arabian Gulf
52.233-2 SERVICE OF PROTEST (SEP 2006) 159
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) 159
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) 160
252.204-
NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) 160
252.215-
NOTIFICATION TO OFFERORS – POST AWARD DEBRIEFINGS (DEC 2022) 162
L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991) 164
L-0002 L2.11-4 EMAIL PROPOSALS (DLA ENERGY OCT 2010) 164
L-0003 L116.01 DATA REQUIREMENTS (STORAGE()DLA ENERGY JAN 2013) 165
PROCUREMENT NOTE L06 PROTEST TO THE AGENCY (DEC 2016) 165
PROCUREMENT NOTE L34 CONTRACTOR TEAM ARRANGEMENTS – SOLICITATION AND
AWARD (JUL 2022)
SECTION M – EVALUATION FACTORS FOR AWARD
52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) 167
52.217-5 EVALUATION OF OPTIONS (JUL 1990) 174
M-0001 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) 174
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
See Section M, FAR 52.212-2, Evaluation of Factors for Award, Price Factor 3 for evaluation methodology concerning all price proposals. Reference Attachment II for price proposal form.
The services to be furnished during the period specified herein and the unit prices are as follows:
BASE PERIOD
CONTRACT LINE ITEM 0001 – OUTSIDE CONTINENTAL UNITED STATES (OCONUS)
CONTRACTOR-OWNED, CONTRACTOR-OPERATED (COCO) STORAGE SERVICES, V20000404:
(FIRM FIXED PRICE)
The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with (IAW) the
Performance Work Statement (PWS) (Section C below, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the base period of November 1, 2024 – October 31, 2028
(four (4) years). All costs associated with performing required services, including any startup costs, shall be included in the total price of CLIN 0001.
AREA(S) OF CONSIDERATION: Within the Arabian Gulf area
LINE ITEM 0001:
TANK
NO.
PRODUCT
TYPE
SHELL
CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
OCONUS COCO
STORAGE
SERVICES
(MONTHLY USE
COCO CHARGE)1
ANNUAL
STORAGE USE
CHARGE
TOTAL
PRICE (4
YEARS)
F76 Subtotal $ $ $
1Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.
SPE603-24-R-0507 RFP/Arabian Gulf
JP5/F44 Subtotal $ $ $
Dedicated Line Fill F76 $ $ $
Dedicated Line Fill
JP5/F44
Subtotal
TOTALS $ $ $
IAW the PWS, a storage (fill) capacity of 465,000 barrels of F76 and 250,000 barrels of JP5/F44. Monthly and Annual Storage Charges shall be based on this quantity. Monthly prices per tank, when added, should equate to the total monthly price. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of above identified tanks at no increase to the offered storage charges.
DLA Energy Quality Assurance Provision (QAP) E18 INSPECTION AND CLEANING OF BULK
PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank #
Monthly OCONUS
COCO Storage Service
Price
Annual Storage Use
Charge
Daily Reduction/Addition Per
Tank When Removed
From/Returned To Revenue
IAW E18
For each full calendar month a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under QAP E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0001
SPE603-24-R-0507 RFP/Arabian Gulf by utilizing the following formula:
Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition
365 Days
If alternate tankage is offered IAW QAP E18, include shell/fill capacities in the offer. QAP E18
INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY
FEB 2017) is not an evaluated price factor.
OPTION 1
LINE ITEM 0002: OCONUS COCO Storage Services, V20000404: (FIRM-FIXED PRICE)
The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with the PWS
(Section C, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the option period of November 1, 2028 – October 31, 2033 (five (5) years).
AREA(S) OF CONSIDERATION: Within the Arabian Gulf area
LINE ITEM 0002:
TANK
NO.
PRODUCT
TYPE
SHELL
CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
OCONUS COCO
STORAGE
SERVICES
(MONTHLY USE
COCO CHARGE)2
ANNUAL
STORAGE USE
CHARGE
TOTAL
PRICE (4
YEARS)
F76 Subtotal $ $ $
JP5/F44 Subtotal $ $ $
2Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.
SPE603-24-R-0507 RFP/Arabian Gulf
Dedicated Line Fill F76 $ $ $
JP5/F44
Subtotal
TOTALS $ $ $
IAW the PWS, a storage (fill) capacity of 465,000 barrels of F76 and 250,000 barrels of JP5/F44. Monthly and Annual Storage Charges shall be based on this quantity. Monthly prices per tank, when added, should equate to the total monthly price. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of above identified tanks at no increase to the offered storage charges.
IAW DLA Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE
TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0002 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank #
Monthly OCONUS
COCO Storage Service
Price
Annual Storage Use
Charge
Daily Reduction/Addition Per
Tank When Removed
From/Returned To Revenue
IAW E18
NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0002 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under QAP E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0002 by utilizing the following formula:
Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition
365 Days
If alternate tankage is offered IAW QAP E18, include shell/fill capacities in the offer. QAP E18
INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY
FEB 2017) is not an evaluated price factor.
SECTION C - SPECIFICATIONS/SOW/SOO/PWS
The Performance Work Statement (PWS) is incorporated by reference as if fully set forth herein. Refer to
Attachment I.
C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and firefighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service; U.S. Marshal's Service; and the Federal Emergency Management Agency.
C-0002- C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
C-0003- C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA
ENERGY JAN 2012)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be
SPE603-24-R-0507 RFP/Arabian Gulf provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by a commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).
(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall heck the appropriate box below):
[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, it’s own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not provide its own personnel, facilities, or equipment. Instead, the Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the Government and arrange for that commercial laboratory to perform all the required tests.
The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The Government will reimburse the Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)
All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) contract text.
(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-4 INSPECTION OF SERVICES-FIXED PRICE (AUG 1996)
(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the
Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the
Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may –
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may –
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the
Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)
The Quality Assurance Provisions pertaining to the inspection of services, inspection offices, and nonconforming supplies and services, referenced in Section J, are found in Attachment III of this solicitation and incorporated herein.
SECTION F – DELIVERIES OR PERFORMANCE
F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC
2017)
(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the
SPE603-24-R-0507 RFP/Arabian Gulf
Contractor.
(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative
(QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions.
Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION
AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.
(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the
Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the
Contractor when the tank car comes to rest on the Contractor's siding.
(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.
(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:
I certify that ______________ gallons of _____________________ have been upgraded/downgraded
(quantity) (product) from ___________________ to ____________________. This action was required because
(product) (product)
(enter reason for the action)
Signature of Contractor Representative
[ ] I concur with the Contractor’s certification.
[ ] I do not concur with the Contractor’s certification for the following reasons:
Signature of Quality Representative
(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)
(k) The following subparagraphs apply only to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.
(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date;
for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the
72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours’ notice for barges and the 72 hours’ notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --
(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Lay time shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
(iii) Lay time shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Lay time, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within lay time determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.
(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo.
When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.
(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.
(2) INCREASES TO BASIC ALLOWED LAY TIME.
(i) If, after lay time commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed lay time shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed lay time shall be increased by the duration of the delay.
(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after lay time has commenced, the lost time shall be added to the basic allowed lay time.
SPE603-24-R-0507 RFP/Arabian Gulf
(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed lay time shall be increased by the duration of the delay.
(v) There will be no increase to basic allowed lay time (nor other reductions to any resulting demurrage time) for saved lay time arising out of other loadings/discharges.
(vi) Delays, after commencement of lay time, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed lay time by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of lay time which elapse in excess of the basic allowed lay time for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the
Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control
Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible
Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the
Contractor will insert the following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from
Government-owned and approved stocks and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE
AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF
CONTRACTOR'S DESIGNATED REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product
Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government. The
Contractor shall inspect all shipping conveyances prior to loading to ensure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck
SPE603-24-R-0507 RFP/Arabian Gulf operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck;
however, the loading operation must be under the surveillance and direction of Contractor personnel.
Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES.
Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3)
TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate
Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.
(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels, jet lubricating oil, and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish, periodically inspect, clean such strainers, and repair same, if necessary, keeping a written record thereof.
(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. The Contractor will furnish such seals. Seal numbers will be indicated on shipping documents.
(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.
(g) FOR TANK CARS ONLY.
(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the
Defense Fuel Regional Office upon request.
(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.
(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the
Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.
(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.
(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The
Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.
SPE603-24-R-0507 RFP/Arabian Gulf
(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.
(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.
(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.
(m) Custody of product delivered to tanker or barge, and risk of loss thereof, shall pass from the
Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.
(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(o) The following subparagraphs only apply to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.
(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours’ notice for barges and 72 hours’ notice for tankers will require verbal approval of the
Contractor, confirmed in writing.
(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --
(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00
A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .