Attachment II - PPF.pdf

PDF 177 KB Posted

Attached to
Contractor-Owned, Contractor Operated (COCO) Fuel Storage Services in the Arabian Gulf area
Solicitation number
SPE603-24-R-0507
Issued by

About this file

This document is an attachment titled "PPF COCO Storage Services, Arabian Gulf Area" that is part of a solicitation for Contractor-Owned, Contractor-Operated (COCO) fuel storage services in the Arabian Gulf area.

The solicitation seeks to procure OCONUS COCO bulk fuel storage services for F76 and JP5/F44 fuels with a total fill capacity of 465,000 barrels of F76 and 250,000 barrels of JP5/F44. The contract will have a base period of 4 years from November 1, 2024 to October 31, 2028, with an option period of 5 years from November 1, 2028 to October 31, 2033. Pricing is requested on a monthly use and annual storage charge basis, with provisions for prorated reductions if tanks are taken out of service for cleaning/inspection. The solicitation is being issued by the Defense Logistics Agency Energy.

View the file

Other files

File Type Posted
SPE60324R0507-0002.pdf PDF
SPE60324R0507-0001 w Att A.pdf PDF
SPE60324R0507 .pdf PDF
Attachment V - PPQ.pdf PDF
Attachment III - QAPS .pdf PDF
Attachment I - PWS.pdf PDF
Attachment IV - Consent Form.pdf PDF
Attachment VI - PPRL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPE603-24-R-0507

Attachment II - PPF

COCO Storage Services, Arabian Gulf Area

The services to be furnished during the period specified herein and the unit prices are as follows:

BASE PERIOD

CONTRACT LINE ITEM 0001 – OUTSIDE CONTINENTAL UNITED STATES

(OCONUS) CONTRACTOR-OWNED, CONTRACTOR-OPERATED (COCO) STORAGE

SERVICES, V20000404: (FIRM FIXED PRICE)

The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with

(IAW) the Performance Work Statement (PWS) (Section C, Attachment I of this solicitation) and all other terms and conditions set forth herein, during the base period of November 1, 2024 –

October 31, 2028 (four (4) years). All costs associated with performing required services, including any startup costs, shall be included in the total price of CLIN 0001.

AREA(S) OF CONSIDERATION: Within the Arabian Gulf area

LINE ITEM 0001:

TANK

NO.

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

OCONUS COCO

STORAGE

SERVICES

(MONTHLY USE

COCO

CHARGE)1

ANNUAL

STORAGE USE

CHARGE

TOTAL

PRICE (4

YEARS)

F76 Subtotal $ $ $

JP5/F44 Subtotal $ $ $

Dedicated Line Fill F76 $ $ $

1Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.

COCO Storage Services, Arabian Gulf Area

Dedicated Line Fill

JP5/F44

Subtotal

TOTALS $ $ $

IAW the PWS, a storage (fill) capacity of 465,000 barrels of F76 and 250,000 barrels of JP5/F44.

Monthly and Annual Storage Charges shall be based on this quantity. Monthly prices per tank, when added, should equate to the total monthly price. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill

Capacity of above identified tanks at no increase to the offered storage charges.

DLA Energy Quality Assurance Provision (QAP) E18 INSPECTION AND CLEANING OF

BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (OCONUS COCO

Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank #

Monthly OCONUS

COCO Storage

Service Price

Annual Storage Use

Charge

Daily Reduction/Addition Per

Tank When Removed

From/Returned To Revenue

IAW E18

For each full calendar month, a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under

E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0001 by utilizing the following formula:

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition

365 Days

COCO Storage Services, Arabian Gulf Area

If alternate tankage is offered IAW QAP E18, include shell/fill capacities in the offer. QAP

E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS

(DLA ENERGY FEB 2017) is not an evaluated price factor.

OPTION 1

LINE ITEM 0002: OCONUS COCO Storage Services, V20000404: (FIRM-FIXED PRICE)

The Contractor shall provide OCONUS COCO bulk fuel service capabilities in accordance with the PWS (Section C, Attachment I of this solicitation), and all other terms and conditions set forth herein, during the option period of November 1, 2028 – October 31, 2033 (five (5) years).

AREA(S) OF CONSIDERATION: Within the Arabian Gulf area

LINE ITEM 0002:

TANK

NO.

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

OCONUS COCO

STORAGE

SERVICES

(MONTHLY USE

COCO

CHARGE)2

ANNUAL

STORAGE USE

CHARGE

TOTAL

PRICE (5

YEARS)

F76 Subtotal $ $ $

JP5/F44 Subtotal $ $ $

Dedicated Line Fill F76 $ $ $

2Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.

COCO Storage Services, Arabian Gulf Area

JP5/F44

Subtotal

TOTALS $ $ $

IAW the PWS, a storage (fill) capacity of 465,000 barrels of F76 and 250,000 barrels of JP5/F44.

Monthly and Annual Storage Charges shall be based on this quantity. Monthly prices per tank, when added, should equate to the total monthly price. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill

Capacity of above identified tanks at no increase to the offered storage charges.

IAW DLA Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM

STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0002 (OCONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank #

Monthly OCONUS

COCO Storage

Service Price

Annual Storage Use

Charge

Daily Reduction/Addition Per

Tank When Removed

From/Returned To Revenue

IAW E18

NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0002 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0002 by utilizing the following formula:

COCO Storage Services, Arabian Gulf Area

Monthly OCONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition

365 Days

If alternate tankage is offered IAW QAP E18, include shell/fill capacities in the offer. QAP

E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS

(DLA ENERGY FEB 2017) is not an evaluated price factor.

File details come from the government source that posted it. Updated .