Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
4. REQUISITION/PURCHASE REQ. NO.
See Block 14
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60318R0529
X
2018 JUL 02
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2018 JUL 02 / 2018 SEP 14
TIME 1:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
X
CONTINUATION SHEET PAGE 2 OF 2 PAGESREFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE60318R0529 - 0003
CONTINUED ON NEXT PAGE
The purpose of Amendment 0003:
A. Extend the solicitation closing date to September 14, 2018, at 1:00 PM, Ft. Belvoir, VA time. Please acknowledge this Amendment and all forthcoming amendments in your offer.
B. All other terms and conditions remain the same.
| PM JBLM Pre-Proposal Slides.pdf |
| C-1.7 Contracting Manpower Reporting |
| C-1.8 Applicable Directives |
| C-1.9 Quality Monitoring and Evaluations |
| C-2.0 Introduction |
| • CFF Logistics Center: Bulk fuel is received at CFF Logistics Center by commercial tank truck. Figure 2 presents the annual estimate for fuel receipts based on historical shipment and receipt data and projected requirements. Retail site is canopy ... |
| Figure 2: CFF Logistics Center Bulk Tanks and Receipts - Projected |
| • CFF Main Post: Facility is scheduled for MILCON construction 2021. The current facility was upgraded in 1997 and consists of two 25K USG USTs for F-24, one 10K USG UST for DS2 and one 5K USG UST for MUR. The facility allows for one-way traffic wi... |
| • CFF North Fort: Facility scheduled for MILCON construction 2021. The current facility was upgraded in 1998 and consists of two 20K USG USTs for F24 and one 20K USG UST for DS2. Fuel is received by standard commercial gravity drop. The dispensing... |
| • Gray Army Airfield: Facility scheduled for MILCON construction 2019. There are 2 pantographs planned for GAAF. Currently hot/ cold refueling operations are being conducted by Forward Arming and Refueling Points (FARP). The MILCON construction wi... |
| • Yakima Training Center: Bulk and Retail Facility is 65 miles East of Joint Base Lewis McChord. YTC bulk tanks consists of F24 ASTs (2X120K), ULR AST (1X10K), and DS2 AST (1X10K). The YTC retail consists of F24 3 islands (2 for Tactical Wheeled Ve... |
| UC-2.13.1: AssignmentsU: The Installation Spill Prevention Control and Countermeasures (SPCC) Plan and/or the Facility Response Plan (FRP) or equivalent as applicable, may designate contractor management/personnel to temporarily serve as the Incident ... |
| UC-2.14: Spill ReportingU: In the event of a reportable spill, the Contractor shall report to the Contracting Officer, DLA Energy Region, and the COR, the spill response required immediately by telephone and email in accordance with requirements in DL... |
| UC-2.14.1: Spill ResponseU: In the event of a spill, the contractor will follow the Installation Facilities Response Plan (FRP) which includes tasks such as, but not limited to, the following: |
| UC-2.14.2: Spill Response SuppliesU: The Contractor shall be responsible for the care and upkeep of all spill containment and clean up kits, supplies, and equipment that are required in accordance with the SPCC and FRP. The Contractor roll all assoc... |
| Appendix C: |
| ABBREVIATIONS AND ACRONYMS |
| A1 JBLM and YTC POL PICS.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Contracting Presentation Slides.pdf |
| Slide Number 1 |
| FUNCTION & AUTHORITY OF GOVERNMENT PERSONNEL |
| AGENDA |
| SOLICITATION |
| SOLICITATION (CON’T) |
| SYSTEM FOR AWARD MANAGEMENT |
| ENTERPRISE BUSINESS SYSTEM |
| WIDE AREA WORKFLOW (WAWF) |
| Slide Number 9 |
| SECTION B - SUPPLIES/SERVICES AND PRICES/COST |
| SECTION C - DESCRIPTION/SPECFICATIONS/�STATEMENT OF WORK |
| SECTION E - INSPECTION AND ACCEPTANCE |
| SECTION E - INSPECTION AND ACCEPTANCE (CON’T) |
| SECTION E - INSPECTION AND ACCEPTANCE (CON’T) |
| SECTION E - INSPECTION AND ACCEPTANCE (CON’T) |
| SECTION F - DELIVERIES OR PERFORMANCE |
| SECTION G - CONTRACT ADMINISTRATION DATA |
| SECTION H - SPECIAL CONTRACT REQUIREMENTS |
| SECTION I - CONTRACT CLAUSES |
| SECTION I - CONTRACT CLAUSES (CON’T) |
| SECTION I - CONTRACT CLAUSES (CON’T) |
| SECTIONS J & K |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERS OR QUOTERS |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERS OR QUOTERS |
| SECTION M - EVALUATION FACTORS FOR AWARD |
| SECTION M - EVALUATION FACTORS FOR AWARD |
| Slide Number 27 |
File details come from the government source that posted it.