Scott_Appendix_AF_14_Apr_18.pdf
PDF 142 KB Posted
- Solicitation number
- SPE60318R0518
- Issued by
-
Defense Logistics Agency Energy
About this file
Revised Scott Appendix
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scott AFB
APPENDIX AF
AIR FORCE INSTALLATION INFORMATION
I. INSTALLATION LISTING
1. Contracted Fuels Management Operations Services ^*:
Buckley AFB, CO Kirtland AFB, NM Schriever AFB, CO
Cape Canaveral AFS, FL JB McGuire-Lakehurst, NJ (Lakehurst) Sheppard AFB, TX
Cheyenne Mtn, CO Laughlin AFB, TX Tinker AFB, OK Columbus AFB, MS Malmstrom AFB, MT Wright Patterson AFB, OH Edwards AFB, CA Maxwell AFB, AL Vance AFB, OK F.E. Warren AFB, WY Patrick AFB, FL Vandenburg AFB, CA Gila Bend AAF, AZ Peterson AFB, CO Keesler AFB, MS Randolph AFB, TX
2. Contracted Bulk Storage:
a. CONUS
Altus AFB OK Hill AFB, UT* Mountain Home AFB, ID Barksdale AFB, LA Holloman AFB, NM Nellis AFB, NV Beale AFB, CA Hurlburt Field, FL Offutt AFB, NE* Cannon AFB, NM JB McGuire-Dix-
_Lakehurst, NJ
Pope AFB, NC
Davis Monthan AFB, AZ Langley AFB, VA Robins AFB, GA* Dover AFB, DE Little Rock AFB, AR Scott AFB, IL Dyess AFB, TX Luke AFB, AZ Seymour Johnson AFB, NC Eglin AFB, FL* McChord AFB, WA Shaw AFB, SC Ellsworth AFB, SD McConnell AFB, KS Travis AFB, CA Fairchild AFB, WA Minot AFB, ND Tyndall AFB, FL Grand Forks AFB, ND Moody AFB, GA Whiteman AFB, MO
b. OCONUS Anderson AFB, GU+ Aviano AB, IT* Eielson AFB, AK Incirlik, AB, TU * Elmendorf AFB, AK Lajes Field Azores * Kadena AB, JA RAF Lakenheath, UK * Misawa AB, JA RAF Mildenhall, UK * Osan AB, RK Ramstein AB, GE * Spangdahlem AB, GE *
^ Note: FSC, Product Issues, Accounting/Auditability, Quality Surveillance/Lab, Cryogenics, and Retail Service Station at these locations are the Contractor’s responsibility.
* Note: PM at these locations is the government’s responsibility IAW C-5.3.2 + Note: PLDS at these locations is the Contractor’s responsibility IAW C-5.6.2
APPENDIX AF (cont’)
II. INSTALLATION SPECIFIC INFORMATION
A. BASE
(1) INTRODUCTION
Fuels Management is responsible for providing jet fuel (JAA), ground fuels (MRR, DS2, BDI, E85), and Liquid Aviation Breathing Oxygen (LOX) to the 375th AMW (C-21s): 6 acft, 932nd ARW (C-40s): 4 acft, U.S. Transportation Command HQ, Air Mobility Command HQ, 18th Air Force HQ, and the 126th Air Refueling Wing.
(2) HOURS OF OPERATION
Normal hours for fuels operations are identified below. Contractor must be capable of providing 24 hours x 7 days per week PWS coverage when required including for weather, natural disaster, exercise, or other contingency operations.
Operation Mon-Fri Sat-Sun Holidays/After Hrs
Fuels Management
FISC (Accounting)
FISC (Lab)
FISC (FSC)
Operations (Distribution)
Operations (Bulk Storage) 0700-2300
Operations (Cryogenics)
Recognized holidays:
New Year’s Day: 1 January Martin Luther King’s Birthday: 3rd Monday in January President’s Day: 3rd Monday in February Memorial Day: Last Monday in May Independence Day: 4 July Labor Day: 1st Monday in September Columbus Day: 2nd Monday in October Veterans Day: 11 November Thanksgiving Day: 4th Thursday in November Christmas Day: 25 December
NOTE (1): If the holiday falls on Saturday—the previous Friday shall be observed as the holiday. If the holiday falls on Sunday—the next Monday shall be observed as the holiday.
NOTE (2): Fuels Operations shall operate during normal or required extended hours of operation and on observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOC and Security Forces and be available to respond within 1 hr.
(3) WORKLOAD INFORMATION
Base workload/requirements are provided below. Quantities and durations are estimates only and subject to variation. Variation does not directly correspond to additional requirement or staffing without validation and/or increase in normal hours of operation by the Contracting Officer.
Item
Average number of receipts per month, grade, quantity, normal shifts of receipts and mode of delivery
JAA-5 per month/36-40K gals/A Shift/Truck MRR-1 per quarter/7-7.5K gals/A Shift/Truck BDI-1 per quarter/6.5-7K gals/A Shift/Truck E85-1 per quarter/6.5-7K gals/A Shift/Truck DS2-twice annually/6K gals/A Shift/Truck
Average duration of each receipt mode Tank Truck: 40 min-1.2 hrs Per truck/ 3.5-4 hrs per receipt (5 trucks)
Number of trucks/railcars which can be offloaded simultaneously. 1 Truck at a time
Number of trucks/railcars which can be on-loaded simultaneously (only use for bulk deliveries i.e. DFSP TO DFSP).
N/A
Can receipt/fill/transfer operations occur simultaneously? Yes
Do tank truck receipts require Contractor escort? No
Do barge receipts require Contractor booming? If not, who booms? N/A
Base average annual jet fuel gallons issued 2M gals
Average transfers (WEEKLY) Quantity Avg: N/A Number of transfers: N/A Normal days and times for transfers: N/A
Average number of refuels per shift
(DAILY) 3-4
Average number of fillstands per shift
(DAILY)
Bulk: A- 2 B- 1 Hydrants: N/A
Number of refuelers which can be filled simultaneously.
Bulk: 2 Hydrants: N/A
Number of hydrant outlets which can be operated simultaneously. N/A
Number of hydrant outlets normally operated simultaneously per shift. N/A
Number of refueling vehicles (R-11) normally operated simultaneously per shift.
N/A
Number of base organizational tanks supported. N/A
Average Monthly organizational tank issues (servicing’s and quantity). N/A
Average Monthly C-300 Fillstands 2 per month
Describe current base provided grounds maintenance or describe Contractor’s responsibility (Grass and Snow)
Grass, snow and leaves are cleared via CE or contractor
Describe current base provided entomology/pest control services or describe Contactor’s responsibility
All aspects of pest control are contracted
Number of oil/water separators within Contractors Area of Responsibility 1
Number of low point drains within Contractors Area of Responsibility 13 (Contractor responsible to maintain)
Number of emergency generators for POL facilities within Contractors AOR 1
Average Annual Cryogenic Receipts Per Year (quantity and receipts) N/A
Average Monthly Cryogenic Servicing’s Per Month (quantity and servicing’s)
N/A
Pre-Identified Confined Spaces* 10
How many times in the last year has the Contractor been called in outside of normal duty hours
Level of DLA Energy/USACE RM Provided (Quarterly, Semi-Annually, Annually)
Annually
NOTES: * Confined Spaces shall be validated by Contractor through CE.
(4) BASE SPECIFIC REQUIREMENTS
Provide any additional requirements not standard or applicable to all bases.
- The Government will provide collection and disposal of hazardous waste to include waste from oil water separators.
- Base Civil Engineering perform emergency generator inspections, testing and coordinates with Fuels Management for government provided generator fuel.
- Contractor personnel are required to perform monthly tank seal inspections which requires confined space entry.
- Contractor personnel are required to provide return to bulk operations (R-11/Bowser).
- Jet A fillstands have both deadman controls and Scully System; diesel and unleaded fillstands are not equipped with deadman controls or Scully System.
- Fuel bowser is provided by Fuels Management for Contractor use as required.
(5) FACILITIES
The following on-site installation facilities may be used by the Contractor in performance of the PWS tasks. The facilities may be changed, by the local installation, from time to time to meet mission requirements. The Contractor will be notified prior to any change of location.
Facility Number
Bldg Number Name/Area Installed Equipment/Description
744 Main office Eye wash station/shower in Lab
565 SSTA 9 SSTA pumps
560 Storage
3 - 150K gal tanks/ 1 – 10K gal deicing tank/ 4 – 10K gal SSTA tanks/ 4 Offloading headers/ 4 Fill stands/ 5 PRTs/ 4 Filter Separators/ 2-600 GPM pumps/4-300 GPM pumps
503 Cryogenics yard 1 - 3K gal LOX tank
Fuel truck yard Eye wash station/shower
(6) PETROLEUM STORAGE TANKS
Facility Number
Tank Number
Function (Bulk/Hydrant/MSS)
Safe Fill (gallons)
Product Grade
Type
UST/AST
Primary Receipt Mode
Alternate Receipt Mode
560 99 BULK 9,532 Deicing Fluid AST N/A (Inactive) N/A
560 8732 BULK 143,971 JAA AST TT N/A
560 8733 BULK 168,332 JAA AST TT N/A
560 8734 BULK 180,159 JAA AST TT N/A
560 108 BULK 8986 MRR UST TT N/A
560 109 BULK 8986 E85 UST TT N/A
560 110 BULK 8986 DS2 UST TT N/A
560 111 BULK 8986 BDI UST TT N/A
(7) Cryogenic Storage Tanks
Facility Number Tank Number
Safe Fill (gallons)
Product Grade
565 2
2800 LOX
(8) EQUIPMENT (EAID)
The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks.
Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are listed on the Custodian Authorization/Custodian Receipt Listing (CA/CRL).
NOMENCLATURE MANUFACTURER NSN PART/MODEL SERIAL NO PRICE LOCATION
N/A
(9) EQUIPMENT (NON-EAID)
The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks.
Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are NOT listed on the CA/CRL.
(10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC)
The following on-site installation equipment may be used for the Contractor in performance of PWS tasks.
The following ITEC is identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account GAS. Monitors are not tracked in AIM but are accountable.
Laptop HP N/A D8R88AV MXL5032DXF $300 Bulk Storage
(11) ITEC (DLA-ENERGY)
The following on-site Defense Logistics Agency-Energy (DLA-Energy) ITEC may be used by the Contractor in performance of PWS tasks.
CPU Dell N/A 09-P-111173 2Y8KJN1 $300 Bulk Storage
(12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT
The following on-site Defense Logistics Agency-Energy (DLA-Energy) AIT may be used by the Contractor is performance of PWS tasks.
SYSTEM DESCRIPTION SERIAL NO MODEL NO MFR LOCATION
(13) LAND MOBILE RADIOS (LMR)
The following on-site installation LMRs may be used by the Contractor in performance of PWS tasks. The LMRs are identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account
DESCRIPTION PART NO SERIAL NO LOC
(14) VEHICLES
The following on-site installation vehicles may be used by the Contractor for performance of PWS tasks. This listing is subject to change as vehicles are replaced and/or added to/deleted from the fleet.
TYPE REGISTRATION NO NSN FUEL GRADE
DISPENSED
(15) Base Specific Additional Publications/Forms (addition to Appendix C)
PUBLICATION TITLE
| APPENDIX AF |
| APPENDIX AF (cont’) |
| APPENDIX AF (cont’) |
| APPENDIX AF (cont’) |
| APPENDIX AF (cont’) |
| APPENDIX AF (cont’) |
| (5) FACILITIES |
| APPENDIX AF (cont’) |
| APPENDIX AF (cont’) |
| (8) EQUIPMENT (EAID) |
| APPENDIX AF (cont’) |
| (9) EQUIPMENT (NON-EAID) |
| APPENDIX AF (cont’) |
| (10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC) |
| (11) ITEC (DLA-ENERGY) |
| APPENDIX AF (cont’) |
| (12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT |
| APPENDIX AF (cont’) |
| (13) LAND MOBILE RADIOS (LMR) |
| APPENDIX AF (cont’) |
| (14) VEHICLES |
| APPENDIX AF (cont’) |
| (15) Base Specific Additional Publications/Forms (addition to Appendix C) |
File details come from the government source that posted it.