SF30_SPE60226R0701_Amendment 0002.pdf
PDF 11 KB Posted
- Attached to
- PACIFIC ISO CONTAINER SUPPORT REQUIREMENT Federal contract opportunity
- Solicitation number
- SPE602-26-R-0701
- Issued by
- Defense Logistics Agency Energy
About this file
This is Amendment 0002 to Solicitation SPE60226R0701 issued by DLA Energy for Bulk Petroleum Product procurement. The amendment revises the Period of Performance for the contract, which is the only substantive change to the solicitation.
The Period of Performance has been modified as follows: the Base Year now runs from April 1, 2026 to March 31, 2027 (previously February 15, 2026 to February 14, 2027); Option Year 1 is April 1, 2027 to March 31, 2028; Option Year 2 is April 1, 2028 to March 31, 2029; Option Year 3 is April 1, 2029 to March 31, 2030; and Option Year 4 is April 1, 2030 to March 31, 2031. All other terms and conditions of the solicitation remain unchanged. Offerors are required to acknowledge receipt of this amendment in accordance with solicitation instructions, and failure to acknowledge receipt prior to the specified hour and date may result in rejection of the offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP SPE60226R0701 CONFORMED THRU 03-25-26.pdf | ||
| SF30_SPE60226R0701_AMD0005.pdf | ||
| SF30_SPE60226R0701_AMD0004.pdf | ||
| RFP SPE60226R0701 CONFORMED THRU 02-20-26.pdf | ||
| RFP SPE60226R0701 CONFORMED THRU 02-04-26.pdf | ||
| SF3O_SPE60226R0701_AMD0003.pdf | ||
| RFP SPE60226R0701 CONFORMED THRU 01-13-26.pdf | ||
| SF30_SPE60226R0701_Amendment 0001.pdf | ||
| RFP SPE60226R0701 CONFORMED THRU 01-07-26.pdf | ||
| Attachment 1 OSP.pdf | ||
| Pacific ISO RFP Final.pdf | ||
| Attachment 2 QASP.pdf | ||
| Attachment 3 E QAPS.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60226R0701
X
2025 NOV 06
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM PRODUCT
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 2 PAGES
SPE60226R0701 - 0002
Purpose of this Amendment is for:
SECTION F - DELIVERIES OR PERFORMANCE
The Period of Performance is revised as follows:
DELETE:
Base Year: February 15, 2026 - February 14, 2027 Option Year 1: February 15, 2027 - February 14, 2028 Option Year 2: February 15, 2028 - February 14, 2029 Option Year 3: February 15, 2029 - February 14, 2030 Option Year 4: February 15, 2030 - February 14, 2031
REPLACE WITH:
Base Year: April 1, 2026 – March 31, 2027 Option Year 1: April 1, 2027 - March 31, 2028 Option Year 2: April 1, 2028 - March 31, 2029 Option Year 3: April 1, 2029 – March 31, 2030 Option Year 4: April 1, 2030 - March 31, 2031
The amendment accomplishes the following:
Revises the start and end date, for all the years of Period of Performance.
All other terms and conditions remain unchanged.
Offerors shall acknowledge receipt of this amendment in accordance with the solicitation instruction.
END OF AMENDMENT
File details come from the government source that posted it. Updated .