This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for Solicitation SPE602-26-R-0700, issued by DLA Energy for bulk petroleum products serving the Atlantic/Europe/Mediterranean region. The amendment number is 0002, with an effective date of February 9, 2026. The issuing office is SPE602, located at DLA Energy, 8725 John J. Kingman Road, Fort Belvoir, VA 22060. The amendment is not extending the hour and date specified for receipt of offers, and offerors must acknowledge receipt of this amendment prior to the specified deadline by completing items 8 and 15 and returning one copy of the amendment, acknowledging receipt on each copy of the offer submitted, or by separate letter or telegram referencing the solicitation and amendment numbers.

The primary purpose of this amendment is to incorporate newly issued supplements into the solicitation and implement a sequential numbering system for improved navigation and reference. The amendment incorporates 16 supplements including B1 (Economic Price Adjustment—Overseas), F1-F4 and F6 (Delivery, Quantity, Routing, Demurrage, and Blending Conditions), I1-I2 (Definitions and Delivery-Order Limitations), L1 (Evidence of Responsibility), and M1-M10 (various evaluation factors). Five supplements previously without sequential designations—Tanker Standards and Requirements, Right to Apply FOB Origin Offer, and three evaluation supplements—are now assigned numbers F5, M2, M4, M6, and M9. Section L (Instructions, Conditions and Notices) and Section M (Evaluation Factors for Award) were updated to reflect this new numbering system. Key evaluation criteria remain lowest laid-down price (aggregate of product price, additives, transportation, terminal service fees, and delivery considerations) and technical acceptability, with exceptions to solicitation requirements rated technically unacceptable unless explicitly accepted by the Government in writing or subsequently revised. Attachment 11 (Reference to Solicitation Supplements) was also updated to incorporate new supplements and remove contract texts reflected in the online system.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60226R0700

X

2025 DEC 05

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

BULK PETROLEUM PRODUCT

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

02/09/2026

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 4 PAGES

SPE60226R0700 - 0002

Block 14 Cont'd:

The purpose of this amendment is to incorporate newly issued supplements into the solicitation. To improve navigation and reference, a typographical adjustment has been made: all existing and new supplements are now assign sequential numbering in their titles. This change applies uniformly to all supplements issued with the solicitation, streamlining identification and cross-reference.

In alignment of this update, SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES and SECTION M – EVALUATION FACTORS FOR AWARD have been revised to reflect the sequential numbering system. Additionally, a revised version of Attachment 11 – Reference to Solicitation Supplements is being incorporated as a reference. The changes set forth herein are incorporated into Solicitation SPE602-26-R-0700. A conformed copy of the solicitation has been attached for your convenience.

1. The following supplements are hereby incorporated into the solicitation:

B1 SUPPLEMENT: ECONOMIC PRICE ADJUSTMENT (OVERSEAS)

F1 SUPPLEMENT: DELIVERY CONDITIONS (BULK)

F2 SUPPLEMENT: DETERMINATION OF QUANTITY

F3 SUPPLEMENT: SHIPMENT AND ROUTING (OVERSEAS)

F4 SUPPLEMENT: DEMURRAGE AND LOADING CONDITIONS (FOB ORIGIN TANKER, BARGE)

F6 SUPPLEMENT: IN-LINE BLENDING

I1 SUPPLEMENT: DEFINITIONS

I2 SUPPLEMENT: DELIVERY-ORDER LIMITATIONS

L1 SUPPLEMENT: EVIDENCE OF RESPONSIBILITY

M1 SUPPLEMENT: EVALUATION (ALTERNATE COMMODITY PRICE INDEX)

M3 SUPPLEMENT: EVALUATION (ALL OR NONE)

M5 SUPPLEMENT: EVALUATION (QUANTITIES TANKER, SHALLOW DRAFT TANKER, BARGE)

M7 SUPPLEMENT: EVALUATION (OTHER THAN FOB ORIGIN TANKER)

M8 SUPPLEMENT: CONVERSION FACTORS

M9 SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK)

M10 SUPPLEMENT: EVALUATION (USE OF DESP FOR TANKER)

2. The Following list reflects the newly implemented sequential numbering system:

F5 SUPPLEMENT: TANKER STANDARDS AND REQUIREMENTS

M2 SUPPLEMENT: RIGHT TO APPLY FOB ORIGIN OFFER

M4 SUPPLEMENT: EVALUATION (FOB ORIGIN TANKER)

M6 SUPPLEMENT: EVALUATION (OVERSEAS, OTHER THAN FOB ORIGIN TANKER)

M9 SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK)

The following list reflects what was reflected in the original solicitation:

F SUPPLEMENT: TANKER STANDARDS AND REQUIREMENTS

M SUPPLEMENT: RIGHT TO APPLY FOB ORIGIN OFFER

M SUPPLEMENT: EVALUATION (FOB ORIGIN TANKER)

M SUPPLEMENT: EVALUATION (OVERSEAS, OTHER THAN FOB ORIGIN TANKER)

M SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK)

3. Section L and Section M were updated as follows:

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES

ADDENDA TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023). The following paragraphs were updated to incorporate the sequential numbering system:

(13) Offered prices must be tied to Base Commodity Prices in the OET, in accordance with (IAW) B1 SUPPLEMENT: ECONOMC

PRICE ADJUSTMENT (BULK).

(15) Supply commitment letter(s) (if applicable) must be uploaded in OET IAW L1 SUPPLEMENT: EVIDENCE OF

RESPONSIBILITY.

SECTION M – EVALUATION FACTORS FOR AWARD

FAR 52.212-2 EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021). The following paragraphs were updated to incorporate the sequential numbering system:

FACTOR 1: TECHNICAL ACCEPTABILITY

An offer that includes an exception to any solicitation requirement in Section B, C, E, or F will be rated technically unacceptable under the appropriate technical evaluation subfactor unless the exception is explicitly accepted by the Government in writing during negotiations, or the offer is subsequently revised to remove the exception. Any exception/deviation to the solicitation that is not in Section M of the OSP or in an attachment compliant with subsection (f) of M9 SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK) will not be considered and will be rejected, regardless of whether the exception/deviation is explicitly labeled as an exception or a deviation. Offerors shall provide written details during negotiations to address all technical issues and/or exceptions that the Government has identified as “Unacceptable” prior to the submission of Final Proposal Revisions (FPRs). FPRs are the final opportunity to revise proposals to address any technical acceptability issues. If a FPR includes an unresolved technical issue or an exception that is not acceptable to the Government, the offer will be found technically unacceptable and ineligible for award.

Atlantic / Europe / Mediterranean

SPE602-26-R-0700

Amendment 0002

Block 14 Cont'd:

The purpose of this amendment is to incorporate newly issued supplements into the solicitation.

To improve navigation and reference, a typographical adjustment has been made: all existing and new supplements are now assign sequential numbering in their titles. This change applies uniformly to all supplements issued with the solicitation, streamlining identification and cross-reference.

In alignment of this update, SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES and SECTION M – EVALUATION FACTORS FOR AWARD have been revised to reflect the sequential numbering system. Additionally, a revised version of Attachment 11 – Reference to Solicitation Supplements is being incorporated as a reference. The changes set forth herein are incorporated into Solicitation SPE602-26-R-0700. A conformed copy of the solicitation has been attached for your convenience.

1. The following supplements are hereby incorporated into the solicitation:

B1 SUPPLEMENT: ECONOMIC PRICE ADJUSTMENT (OVERSEAS)

F1 SUPPLEMENT: DELIVERY CONDITIONS (BULK)

F2 SUPPLEMENT: DETERMINATION OF QUANTITY

F3 SUPPLEMENT: SHIPMENT AND ROUTING (OVERSEAS)

F4 SUPPLEMENT: DEMURRAGE AND LOADING CONDITIONS (FOB ORIGIN TANKER, BARGE)

F6 SUPPLEMENT: IN-LINE BLENDING

I1 SUPPLEMENT: DEFINITIONS

I2 SUPPLEMENT: DELIVERY-ORDER LIMITATIONS

L1 SUPPLEMENT: EVIDENCE OF RESPONSIBILITY

M1 SUPPLEMENT: EVALUATION (ALTERNATE COMMODITY PRICE INDEX)

M3 SUPPLEMENT: EVALUATION (ALL OR NONE)

M5 SUPPLEMENT: EVALUATION (QUANTITIES TANKER, SHALLOW DRAFT TANKER, BARGE)

M7 SUPPLEMENT: EVALUATION (OTHER THAN FOB ORIGIN TANKER)

M8 SUPPLEMENT: CONVERSION FACTORS

M9 SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK)

M10 SUPPLEMENT: EVALUATION (USE OF DESP FOR TANKER)

2. The Following list reflects the newly implemented sequential numbering system:

F5 SUPPLEMENT: TANKER STANDARDS AND REQUIREMENTS

M2 SUPPLEMENT: RIGHT TO APPLY FOB ORIGIN OFFER

M4 SUPPLEMENT: EVALUATION (FOB ORIGIN TANKER)

M6 SUPPLEMENT: EVALUATION (OVERSEAS, OTHER THAN FOB ORIGIN TANKER)

M9 SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK)

The following list reflects what was reflected in the original solicitation:

F SUPPLEMENT: TANKER STANDARDS AND REQUIREMENTS

M SUPPLEMENT: RIGHT TO APPLY FOB ORIGIN OFFER

M SUPPLEMENT: EVALUATION (FOB ORIGIN TANKER)

M SUPPLEMENT: EVALUATION (OVERSEAS, OTHER THAN FOB ORIGIN TANKER)

M SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK)

Amendment 0002

3. Section L and Section M were updated as follows:

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES

ADDENDA TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES (SEP 2023). The following paragraphs were updated to incorporate the sequential numbering system:

(13) Offered prices must be tied to Base Commodity Prices in the OET, in accordance with

(IAW) B1 SUPPLEMENT: ECONOMC PRICE ADJUSTMENT (BULK).

(15) Supply commitment letter(s) (if applicable) must be uploaded in OET IAW L1

SUPPLEMENT: EVIDENCE OF RESPONSIBILITY.

SECTION M – EVALUATION FACTORS FOR AWARD

FAR 52.212-2 EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021). The following paragraphs were updated to incorporate the sequential numbering system:

FACTOR 1: TECHNICAL ACCEPTABILITY

An offer that includes an exception to any solicitation requirement in Section B, C, E, or F will be rated technically unacceptable under the appropriate technical evaluation subfactor unless the exception is explicitly accepted by the Government in writing during negotiations, or the offer is subsequently revised to remove the exception. Any exception/deviation to the solicitation that is not in Section M of the OSP or in an attachment compliant with subsection (f) of M9 SUPPLEMENT: EVALUATION (EXCEPTIONS/DEVIATIONS) (BULK) will not be considered and will be rejected, regardless of whether the exception/deviation is explicitly labeled as an exception or a deviation. Offerors shall provide written details during negotiations to address all technical issues and/or exceptions that the Government has identified as “Unacceptable” prior to the submission of Final Proposal Revisions (FPRs). FPRs are the final opportunity to revise proposals to address any technical acceptability issues. If a FPR includes an unresolved technical issue or an exception that is not acceptable to the Government, the offer will be found technically unacceptable and ineligible for award.

FACTOR 2: PRICE

The lowest price is the lowest laid-down price, which is the aggregate of offered product price, plus costs incurred by the Government in the delivery of product to the customer location to include, but not limited to: Additives, Transportation, Terminal Service fees (Throughput, Injection Service, Truck Loading), and Offer Specific proposal information (Minimum and Maximum Offer Quantities) with consideration of all Shipping Locations, Shipment Modes, Receipt Capabilities. Transportation rates will be included for tanker, barge, shallow draft tanker, pipeline, railcar, and tank truck transportation modes in accordance with M7 SUPPLEMENT:

EVALUATION (OTHER THAN F.O.B. ORIGIN TANKER), and M4 SUPPLEMENT:

Amendment 0002

EVALUATION (F.O.B. ORIGIN TANKER). Government additive costs will be used to evaluate, where applicable, proposals of product that is not fully additized at the loading facility, but that instead is additized/injected enroute to a facility or customer location. The BEM will calculate the overall pattern of delivery of fuel from contractor facilities to specific customer locations that represents the lowest total combination of price for product, transportation and other costs.

4. Attachment 11 – Reference to Solicitation Supplements was updated to incorporate new supplements and to remove all contract texts/supplements reflected in OET as referenced in solicitation note 6.

5. All other terms and conditions remain unchanged.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 6 PAGES

SPE60226R0700 - 0002

SECTION J - LIST OF ATTACHMENTS

List of Attachments

Description File Name ATTACH_Tab_09_Att_11_ __Reference_to_Solicitatio n_Supplements_Update

Tab 09 Att 11 – Reference to Solicitation

Supplements_Update.pdf ATTACH_Tab_9_RFP_SP

E602_26_R_0700_AMD_5

_CC

Tab 9 RFP SPE602-26- R-0700 AMD 5 CC.pdf

File details come from the government source that posted it. Updated .