Amend 0001 Attachment 9 Q and A Responses.pdf

PDF 230 KB Posted

Attached to
Solicitation Notice for JP8/JPTS Fuel Transportation Services
Solicitation number
SPE60220R0718
Issued by

About this file

This document contains questions and answers related to a solicitation for JP8/JPTS fuel transportation services. Key details include the solicitation seeks transportation services for fuel delivery to bases in Japan, Korea, and the United Arab Emirates. The incumbent contractor is Stolt Tankers B.V. Services required include transportation of fuel in 20-foot intermodal tank containers via ocean vessels with door-to-port and port-to-door services to be provided by the contractor. Return transportation of empty containers is the responsibility of the contractor. Insurance requirements and pricing terms are also addressed.

View the file

Other files

File Type Posted
Amend 0005 SPE60220R0718 SF30.pdf PDF
Amend 0005 SPE60220R0718 Conformed Solicitation.pdf PDF
Amend 0004 SPE60220R0718 Conformed Solicitation.pdf PDF
Amend 0004 SPE60220R0718 SF30.pdf PDF
Amend 0003 SPE60220R0718 SF30.pdf PDF
Amend 0003 SPE60220R0718 Conformed Solicitation.pdf PDF
Amend 0002 SPE60220R0718 SF30.pdf PDF
Amend 0001 SPE60220R0718 SF30.pdf PDF
Amendment 0001 Conformed SPE60220R0718 Solicitation.pdf PDF
Attachment 3 SPE602-20-R-0718_OSP_FINAL.pdf PDF
Attachment 2 SPE602-20-R-0718- QASP_FINAL.pdf PDF
Attachment 5 Past Performance Questionnaire.pdf PDF
Attachment 4 Past Performance Experience Form.pdf PDF
Attachment 6 DLA Form 2019 Small Business Subcontracting Plan.pdf PDF
Attachment 7 MIL-STD-3004TABLE XXVI.pdf PDF
Exhibit 3 - ENERGY QAP E21.01 (JUN 2015).pdf PDF
Exhibit 4 - ENERGY QAP E22 (Apr 2016).pdf PDF
Exhibit 1 - ENERGY QAP E1 (SEP 2013).pdf PDF
Attachment 1 Pricing Schedule.xlsx XLSX spreadsheet
Exhibit 6 - ENERGY QAP E40.01 (JUL 2014).pdf PDF
Attachment 8 Shipping_Conveyance_Suitability_Load_Cleaning_Rqts_Dec_19.pdf PDF
Exhibit 5 - ENERGY QAP E35 (DEC 2011).pdf PDF
20201026_SPE60220R0718 Solicitation_FINAL.pdf PDF
Exhibit 2 - ENERGY QAP E12 POINT OF ACCEPTANCE (JUL 2015).pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPE602-20-R-0718

Amendment 0001

Attachment 9

ATTACHMENT 9

Q&A RESPONSES

1. Please provide intermodal tank container (ISO Tank) delivery addresses for the following:

Kadena AB, Japan

18 LRS/LGRF

UNIT 5198 BOX 10

APO, AP 96368

Osan Air Base, Korea

51 WG-LGSFP

Unit 2064

APO, AP 26278-2064

DLA Energy Response: Please reference Amendment 0001 for updated information.

2. Is our reading correct that once the tank has been delivered to the AB and offloaded, the demurrage (if past the 45 days) ends and we are solely responsible for the tank at that point? If so, assume we are not required to us a US flagged carrier for the backhaul?

DLA Energy Response: Yes, the contractor is responsible for the containers after delivery/offloading. Additionally, a US flagged vessel is not required for the backhaul.

3. I could not find the preceding contract in BETA SAM, can you tell me the incumbent?

DLA Energy Response: Stolt Tankers B.V.

Westerlaan 5 3016CK Rotterdam Netherlands

4. Please confirm we are talking 20ft containers for shipment.

DLA Energy Response: The dimensions of a container that holds ~6K gallons are 20ft x 8ft x 8.5ft. Please reference PWS section 2.5.1.1 for more details regarding container requirements.

5. I see where we are required to clear customs. As this is military fuel, with a diplomatic note from the Embassy we are exempt from customs. Can you confirm?

DLA Energy Response: Per PWS section 2.5.3.5 “The contractor shall provide all customs clearances to the Port Authority at time of container delivery.”; this includes obtaining a clearing agent.

Attachment 9

6. 1.1.3.1 and 1.1.3.3 Please give a little more info on this para. An example would help picture.

DLA Energy Response: Please reference Amendment 00001 for updated language.

7. 2.3.4 Please confirm 24 hours vs. 72 as in UAE?

DLA Energy Response: Please reference Amendment 00001 for updated language.

8. 2.5.1.1.1 Certified by who?

DLA Energy Response: The contractor shall ensure that the containers meet certification requirements for the designated transportation mode. There are DOT, maritime, airlift and local governing standards that must be considered. There is not a single document that covers these requirements. Contractors should follow best commercial practices to ensure containers are certified for transport.

9. 2.6 Line Item 5 45 days from load date…is this the date the fuel is loaded in our container? Or the load date on the DLA procured ship transport?

DLA Energy Response: Please reference Amendment 00001 for updated language.

10. 52.216-19 b. 1 and 2 how will we get the TBD upon contract award amount? Seems this means the ceiling for biding purposes is unlimited?

DLA Energy Response: Offeror bids should not be based on the TBD contract value amount in FAR clause 52.216-19. Offerors bids should take into consideration Table 1 Pricing Schedule (estimated qty per CLIN) and your commercial expertise of the requirement as described by the PWS.

11. 52.209-7 Does the offeror have active federal contracts and grants in excess of $10m…does this include a Multiple Award Contract?

DLA Energy Response: Yes, in accordance with 52.209-7 (a)(1) "all current, active contracts and grants, including all priced options"

12. Is the Offeror allowed to include the Subcontractor’s past performance in the Past Performance Statement?

DLA Energy Response: Per 52.212-02 Evaluations, Factor 2 Past Performance, "evaluation will assess each offeror's probability of meeting the solicitation requirement."

The Government will not factor in the subcontractors past performance into the offeror's overall Factor 2 rating, but the offeror can provide this if they so choose as part of their Technical Proposal to help demonstrate their overall technical approach, keeping in mind the available page limitation.

13. Other than door to port and port to door services, will the contactor incur any billable cost for ocean vessel movement if Surface and Deployment Distribution Command (SDDC) is arranging ocean vessel bookings?

Attachment 9 DLA Energy Response: No, all cost of performance should be accounted for in the Offerors proposed fixed prices in the established CLIN Structure in Table 1 Pricing Schedule based on the CLIN descriptions in section 2.6 of the PWS.

14. Can delivery addresses for Al Dhafra Air Base, United Arab Emirates (UAE), Kadena AB, Japan and Osan Air Base, Korea be provided?

DLA Energy Response: Please refer to the Government's response to question 1.

15. Please confirm that ocean vessel bookings from designated ports of destination in UAE, Japan and Korea for return of contractor-owned containers to ports of origin are arranged by DLA Energy via SDDC?

DLA Energy Response: DLA Energy does not arrange for containers to be returned to origin. Return shipments are arranged by and is the responsibility of the contractor.

16. Within the Performance Work Statement, regarding clauses 2.8.1Cargo Insurance, 2.8.2 Liability, Pollution and Environmental Insurance and 2.8.3 Policy Notification:

Is the Contractor permitted to submit both Contractor and Subcontractor insurance certificates listing the United States Department of Defense as the CERTIFICATE

HOLDER?

DLA Energy Response: No, the contractor or the subcontractor shall be listed as the Certificate Holder. Please reference section H, H51.03 Insurance Requirements for Contractors and Subcontractors (DLA Energy JAN 2012) for more details.

File details come from the government source that posted it. Updated .