AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

4. REQUISITION/PURCHASE REQ. NO.

See Block 14

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE602-20-R-0702

X

2019 DEC 12

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

BULK PETROLEUM PRODUCT

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Amendment 0001

SPE602-20-R-0702

A. The Performance Work Statement (PWS) in SECTION C – DESCRIPTIONS/SPECIFICATIONS/STATEMENT OF WORK is revised as follows:

1) PWS 1.2 Mission Statement is revised as follows:

1.2 Mission Statement. The contractor shall receive, transport and discharge DLA Energy-owned fuel products into designated permanent and temporary U.S. storage tanks, tank bags or trucks positioned at the destinations, listed in B34.01 Services to be Furnished and Prices (DLA Energy FEB 1991) under Solicitation SECTION B – SUPPLIES AND SERVICES AND PRICES/COSTS, while maintaining product quality and accountability in accordance with Solicitation requirements.

2) PWS 3.1 General is revised as follows:

3.1 General. The contractor shall be responsible for maintaining quality of product after loading. U.S. Government representatives may conduct inspections on transport trucks at origin and/or at destination to ensure fuel quality standards are met. The contractor bears the responsibility of maintaining the quality of fuel by ensuring all valves, manifolds, and opening of the tank truck are secure and seals are intact prior to delivery. Delivery of off-specification product, product contamination, or tampering of seals while in the contractor’s possession may result in an official investigation as determined by U.S.

Government representatives. The contractor will not take any samples or break any seals without a DLA Energy-ME or US Government representative being present or without their prior approval. KPC’s refinery representative will send the Certificate of Quality (COQ)/Certificate of Analysis (COA) or Batch Certificate to the DLA Energy Middle East at the following address DESC-ME.Quality@dla.mil for on-specification validation.

3) PWS 3.6.4.4 is revised as follows:

3.6.4.4 The results shall be provided immediately to the DLA Energy ME Quality Manager at the following address DESC-ME.Quality@dla.mil to be validated against the origin load quality certificate. The product will be considered as acceptable, as determined by the DLA Energy ME Quality Manager, provided it falls within the reproducibility limits from the origin certificate. Should any test parameter not fall within reproducibility of the origin certificate or be determined unacceptable for other reasons by the DLA Energy ME Quality Manager, the DLA Energy ME Quality Manager will determine if the product meets acceptability according to MIL-STD-3004-1 or if the product will require disposition.

4) PWS 5.8 eCMRA (Contractor Manpower Reporting Application) is deleted in its entirety.