SPE60123R0314-A4-Energy QAP 33.10.pdf

PDF 104 KB Posted

Attached to
Gaseous Hydrogen (GH2) for Warner Robins AFB, GA / Arnold AFB, TN / Tinker AFB, OK
Solicitation number
SPE601-23-R-0314
Issued by

About this file

This document contains a Supplemental Quality Assurance Provision (SQAP) for gaseous hydrogen products to be supplied under Solicitation SPE601-23-R-0314. The SQAP requires suppliers to provide the name, complete address, and telephone number of each manufacturing and filling point for products offered. Suppliers must notify the government 30 days prior to offering initial shipments from alternate manufacturing/filling points for the same requirement. Pricing will not be adjusted if a different fill location is used, but the contractor must reimburse increased transportation costs to the government. Eligible products include Gaseous Hydrogen conforming to specifications BB-H-886E and MIL-PRF-27201 for delivery to Warner Robins AFB, Arnold AFB, and Tinker AFB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

REVISIONS

REV DESCRIPTION DATE APPROVED

ENERGY QAP E33 .10 July 2008

E33.10 lVIANUFACTURING AND FILLING POINTS (AEROSPACE ENERGY)

(a) Provide the name, complete addresses and telephone number of the manufacturing and filling points for each product to be furnished, and identify the filling points as primary or secondary.

PRODUCT

NAME, COMPLETE ADDRESS

AND TELEPHONE NUMBER OF

MANUFACTURING POINT/FILLING POINT

(b) Suppliers that list primary and alternate manufacturing/filling points for supporting the same requirement shall provide a 30 calendar day notice to the Government prior to offering an initial shipment from an alternate manufacturing/filling point.

(c) For f.o.b. origin shipments, the contract price shall not be adjusted if a Contractor uses a different fill location other than the primary fill point during contract performance. However, if the use of the alternate fill point results in increased costs to the Government, such as transp01iation costs, the Contractor agrees to reimburse the Government for those increased costs.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

DEFENSE ENERGY SUPPORT CENTER

8725 JOHN J. KINGMAN RD

DISTRIBUTION

STATEMENT -A

PREPARED BY

APPROVED FOR REVIEWED BY

PUBLIC RELEASE ����-DAMON.C.III ~

DISTRIBUTION IS APPROVED BY

"UNLIMITED" �ii���IM.LEE.B.122

DLA FORM 1889, OCT 2011

FORT BEL VOIR, VIRGINIA 22060-6222

ITEM DATE

07/25/2014 ENERGY QAP E33 .10

DATE

07/25/2014

NSN

MULTIPLE

DATE SIZE

07/28/2014

SCALE

I

CODE ID NO.

52838

DRAWING NUMBER

PREVIOUS EDITION IS USABLE Add Continuation Page SHEET 1 OF 1 PDF (DLA)

1. Gaseous Hydrogen, GH2 (NSN: 6830-01-653-4745) shall conform to the requirements of Grade B, Type 1 of specification BB-H-886E dated 23 August 2021.

2. Propellant Hydrogen that conforms to the requirements of Type 1, MIL-PRF-27201 dated 26 August 2022

3. Gaseous Hydrogen, GAS, TECHNICAL, 99.999% BULK, CGA G-5.3

DSW0093

Cross-Out

E3310 JVIANUFACTURING AND FILLING POINTS AEROSPACE ENERGY a Provide the name complete addresses and telephone number of the manufacturing and filling points for each product to be furnished and identify the filling points as primary or secondary NAME COMPLETE ADDRESS AND TELEPHONE NUMBER OF MANUFACTURING POINTFILLING POINT PRODUCT b Suppliers that list primary and alternate manufacturingfilling points for supporting the same requirement shall provide a 30 calendar day notice to the Government prior to offering an initial shipment from an alternate manufacturingfilling point c For fob origin shipments the contract price shall not be adjusted if a Contractor uses a different fill location other than the primary fill point during contract performance However if the use of the alternate fill point results in increased costs to the Government such as transpo1iation costs the Contractor agrees to reimburse the Government for those increased costs: See Below

File details come from the government source that posted it. Updated .