SP470626R0003 - Attachment - ATG-R TO_Pricing_Spreadsheet.xlsx
XLSX spreadsheet 144 KB Posted
- Attached to
- AFSI MATOC ATG-R
- Solicitation number
- SP4706-26-R-0003
- Issued by
-
Defense Logistics Agency
About this file
This is a pricing spreadsheet template for Task Order 0011 under the Automated Fuel Systems Installations (AFSI) contract SP4702-23-R-0003, designated as Attachment 4 for source selection purposes. The spreadsheet is designed for contractors to submit cumulative pricing across eight military installation locations: Los Alamitos AASF (CA), Barnes Airport (MA), Will Rogers Field ANG (Oklahoma City, OK), Assault Craft Unit 5 (Camp Pendleton, CA), North Island NAS/Coronado NAB (CA), Kings Bay NSB (GA), Charlotte ANG (NC), and AASF Davenport (IA).
The template requires contractors to provide detailed cost breakdowns organized into five cost categories for each location: Direct Labor, Material Costs, Travel Costs, Other Direct Costs, and G&A/Profit/Indirect Burdens, with totals calculated to arrive at a Fixed-Price (FFP) proposal amount per site. The Direct Labor section includes 25 predefined labor categories ranging from Program Manager to various engineering and technical positions, with rates specified as burdened costs and allowance for contractors to propose alternate categories or zero hours. The Material section lists 77 specific items related to fuel systems infrastructure including server stacks, enclosures, network equipment, flow computers, conduit, cabling, and installation materials, quoted at non-burdened cost. The Travel section requires contractors to detail trips by destination, number of travelers, days, and nights at non-burdened rates. The spreadsheet uses formula-populated fields for automatic calculations and explicitly prohibits overwriting gray-shaded cells. All pricing must aggregate to a Total Evaluated Price across all eight sites, with the version date of November 20, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CUI - ATGR FY26 Section L02062026.pdf | ||
| ATGR FY26 Section M 02062026.pdf | ||
| ATG-R Performance Work Statement.pdf | ||
| SF1449finalSP470626R0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order Cumulative Price
| Contractor Name: |
| Proposal Dated: |
| Los Alamitos AASF, CA CLIN | Barnes ARPT ANG, MA CLIN | Will Rogers Field ANG (Oklahoma City), OK CLIN | Assault Craft Unit 5 (Camp Pendelton), CA CLIN | ||||||||
| Item # | Item | Price | Item # | Item | Price | Item # | Item | Price | Item # | Item | Price |
| 1 | Direct Labor | $ - 0 | 1 | Direct Labor | $ - 0 | 1 | Direct Labor | $ - 0 | 1 | Direct Labor | $ - 0 |
| 2 | Material Costs | $ - 0 | 2 | Material Costs | $ - 0 | 2 | Material Costs | $ - 0 | 2 | Material Costs | $ - 0 |
| 3 | Travel Costs | $ - 0 | 3 | Travel Costs | $ - 0 | 3 | Travel Costs | $ - 0 | 3 | Travel Costs | $ - 0 |
| 4 | Other Direct Cost - All Others | $ - 0 | 4 | Other Direct Cost - All Others | $ - 0 | 4 | Other Direct Cost - All Others | $ - 0 | 4 | Other Direct Cost - All Others | $ - 0 |
| 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 | 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 | 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 | 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 |
| Total FFP | $ - 0 | Total FFP | $ - 0 | Total FFP | $ - 0 | Total FFP | $ - 0 | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | Note: Gray Shaded boxes are formulas, please do not overwrite | Note: Gray Shaded boxes are formulas, please do not overwrite | Note: Gray Shaded boxes are formulas, please do not overwrite | ||||||||
| Note: "Total FFP" Should equal your total proposed price for completing this Task Order | Note: "Total FFP" Should equal your total proposed price for completing this Task Order | Note: "Total FFP" Should equal your total proposed price for completing this Task Order | Note: "Total FFP" Should equal your total proposed price for completing this Task Order |
| North Island NAS/Coronado NAB, CA CLIN | Kings Bay NSB, GA CLIN | Charlotte ANG, NC CLIN | AASF Davenport, IA CLIN | ||||||||
| Item # | Item | Price | Item # | Item | Price | Item # | Item | Price | Item # | Item | Price |
| 1 | Direct Labor | $ - 0 | 1 | Direct Labor | $ - 0 | 1 | Direct Labor | $ - 0 | 1 | Direct Labor | $ - 0 |
| 2 | Material Costs | $ - 0 | 2 | Material Costs | $ - 0 | 2 | Material Costs | $ - 0 | 2 | Material Costs | $ - 0 |
| 3 | Travel Costs | $ - 0 | 3 | Travel Costs | $ - 0 | 3 | Travel Costs | $ - 0 | 3 | Travel Costs | $ - 0 |
| 4 | Other Direct Cost - All Others | $ - 0 | 4 | Other Direct Cost - All Others | $ - 0 | 4 | Other Direct Cost - All Others | $ - 0 | 4 | Other Direct Cost - All Others | $ - 0 |
| 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 | 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 | 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 | 5 | G&A, Profit, All Other Indirect Burdens | $ - 0 |
| Total FFP | $ - 0 | Total FFP | $ - 0 | Total FFP | $ - 0 | Total FFP | $ - 0 | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | Note: Gray Shaded boxes are formulas, please do not overwrite | Note: Gray Shaded boxes are formulas, please do not overwrite | Note: Gray Shaded boxes are formulas, please do not overwrite | ||||||||
| Note: "Total FFP" Should equal your total proposed price for completing this Task Order | Note: "Total FFP" Should equal your total proposed price for completing this Task Order | Note: "Total FFP" Should equal your total proposed price for completing this Task Order | Note: "Total FFP" Should equal your total proposed price for completing this Task Order |
Total Evaluated Price (All Sites) $ - 0
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
Source Selection Information, See FAR 2.101 & 3.104 CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Direct Labor Los Alamitos
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
Source Selection Information, See FAR 2.101 and 3.104 CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material Los Alamitos
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel CLIN Los Alamitos
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination Sarah Fudela: Enter the Location of Travel
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Direct Labor Barnes
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material Barnes
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material
SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel CLIN Barnes
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Direct Labor Will Rogers
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material Will Rogers
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material
SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel CLIN Will Rogers
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Dir Labor Camp Pendelton
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material Camp Pendelton
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material
SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel CLIN Camp Pendelton
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Dir Labor North Island Coronado
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material North Island Coronado
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material
SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel North Island Coronado
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Direct Labor Kings Bay
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material Kings Bay
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material
SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel CLIN Kings Bay
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Direct Labor Charlotte
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | ||||
| Line # | Labor Category | Hourly Rate | Labor Hours | Total |
| 1 | Program Manager | $0 | ||
| 2 | Project Manager | $0 | ||
| 3 | Engineer/Scientist 3 | $0 | ||
| 4 | Engineer/Scientist 2 | $0 | ||
| 5 | Engineer/Scientist 1 | $0 | ||
| 6 | Junior Engineer/Scientist | $0 | ||
| 7 | Logistician 3 | $0 | ||
| 8 | Logistician 2 | $0 | ||
| 9 | Management Analyst 2 | $0 | ||
| 10 | Management Analyst 1 | $0 | ||
| 11 | Technical Analyst 3 | $0 | ||
| 12 | Management and Program Technician 3 | $0 | ||
| 13 | Accounting Clerk II (SCA 01012) | $0 | ||
| 14 | Administrative Assistant (SCA 01020) | $0 | ||
| 15 | Supply Technician (SCA 01410) | $0 | ||
| 16 | Computer Programmer III (SCA 14073) | $0 | ||
| 17 | Computer Programmer IV (SCA 14074) | $0 | ||
| 18 | Computer System Analyst III (SCA 14103) | $0 | ||
| 19 | Electronics Technician II (SCA 23182) | $0 | ||
| 20 | Electronics Technician III (SCA 23183) | $0 | ||
| 21 | Laborer (SCA 23470) | $0 | ||
| 22 | Drafter/CAD Operator II (SCA 300062) | $0 | ||
| 23 | Drafter/CAD Operator III (SCA 300063) | $0 | ||
| 24 | Drafter/CAD Operator IV (SCA 300064) | $0 | ||
| 25 | Engineering Technician III (SCA 30083) | $0 | ||
| 26* | $0 | |||
| 27* | $0 | |||
| 28* | $0 | |||
| 29* | $0 | |||
| Total Labor | $0 | |||
| Note: Labor Rates used on this table should be burdened. | ||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | ||||
| Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25. | ||||
| * Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required. |
&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Material Charlotte
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
| FY26 | |||||
| Line # | Item | U/I | QTY | Price/UI | Total |
| 1 | Server Stack (4.0) | EA | $ - 0 | ||
| 2 | Server Stack (4.0) Installation Material | EA | $ - 0 | ||
| 3 | Client Workstation (4.0) | EA | $ - 0 | ||
| 4 | Client Workstation (4.0) Installation Material | EA | $ - 0 | ||
| 5 | OCC Printer | EA | $ - 0 | ||
| 6 | OCC Printer Installation Material | EA | $ - 0 | ||
| 7 | NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 8 | NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless) | EA | $ - 0 | ||
| 9 | NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 10 | NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless) | EA | $ - 0 | ||
| 11 | RIU | EA | $ - 0 | ||
| 12 | RIU Installation Material | EA | $ - 0 | ||
| 13 | JB | EA | $ - 0 | ||
| 14 | JB Installation Material | EA | $ - 0 | ||
| 15 | FOP (Fiber Breakout) | EA | $ - 0 | ||
| 16 | FOP (Fiber Breakout) Installation Material | EA | $ - 0 | ||
| 17 | Ground Reader (GIS for Enraf) | EA | $ - 0 | ||
| 18 | Ground Reader (GIS for Enraf) Installation Material | EA | $ - 0 | ||
| 19 | Flow Computer (Pipeline) | EA | $ - 0 | ||
| 20 | Flow Computer (Truck Rack) | EA | $ - 0 | ||
| 21 | Flow Computer Installation Material | EA | $ - 0 | ||
| 22 | Flow Transmitter | EA | $ - 0 | ||
| 23 | Flow Transmitter Installation Material | EA | $ - 0 | ||
| 24 | MOV | EA | $ - 0 | ||
| 25 | MOV Installation Material | EA | $ - 0 | ||
| 26 | MOV Power Switch Local | EA | $ - 0 | ||
| 27 | MOV Power Switch Local Installation Material | EA | $ - 0 | ||
| 28 | Network Switch (Small) | EA | $ - 0 | ||
| 29 | Network Switch (Medium) | EA | $ - 0 | ||
| 30 | Network Switch (Large) | EA | $ - 0 | ||
| 31 | Serial/Ethernet Bridge | EA | $ - 0 | ||
| 32 | PLC (Small) | EA | $ - 0 | ||
| 33 | PLC (Medium) | EA | $ - 0 | ||
| 34 | PLC (Large) | EA | $ - 0 | ||
| 35 | UPS (Small - .75 KVA) | EA | $ - 0 | ||
| 36 | UPS (Small - .75 KVA) Installation Material | EA | $ - 0 | ||
| 37 | UPS (Large - 5.3 KVA) | EA | $ - 0 | ||
| 38 | UPS (Large - 5.3 KVA) Installation Material | EA | $ - 0 | ||
| 39 | Surge Suppressor | EA | $ - 0 | ||
| 40 | Power Panel | EA | $ - 0 | ||
| 41 | Power Panel Installation Material | EA | $ - 0 | ||
| 42 | Power Breaker | EA | $ - 0 | ||
| 43 | Power Supply | EA | $ - 0 | ||
| 44 | Pipeline Differential Pressure Transmitter (PDIT) | EA | $ - 0 | ||
| 45 | Pipeline Differential Pressure Transmitter (PDIT) Installation Material | EA | $ - 0 | ||
| 46 | Pipeline Pressure Indicating Transmitter (PIT) | EA | $ - 0 | ||
| 47 | Pipeline Pressure Indicating Transmitter (PIT) Installation Material | EA | $ - 0 | ||
| 48 | Tank Gauge Interface (Ground Reader) | EA | $ - 0 | ||
| 49 | Tank Gauge Interface (Ground Reader) Installation Material | EA | $ - 0 | ||
| 50 | Remote Annunciator (Horn/Light) | EA | $ - 0 | ||
| 51 | Remote Annunciator (Horn/Light) Installation Material | EA | $ - 0 | ||
| 52 | Conduit (2" HDPE) /1' - with UG Boring | EA | $ - 0 | ||
| 53 | Conduit (1" Galvanized) /10' | EA | $ - 0 | ||
| 54 | Conduit (1" PVC-Coated Galvanized) /10' | EA | $ - 0 | ||
| 55 | Conduit (Liquid Tight Flex) /10' | EA | $ - 0 | ||
| 56 | Conduit (Explosion Proof Flex) /10' | EA | $ - 0 | ||
| 57 | Conduit Installation Material | EA | $ - 0 | ||
| 58 | Conduit Seals (EYS) | EA | $ - 0 | ||
| 59 | MI Cable (Seal) | EA | $ - 0 | ||
| 60 | MI Cable (Seal) Installation Material | EA | $ - 0 | ||
| 61 | Conduit (PVC Underground/Concrete) /10' | EA | $ - 0 | ||
| 62 | Conduit Fittings - GAU | EA | $ - 0 | ||
| 63 | Conduit Fittings - GAU Installation Material | EA | $ - 0 | ||
| 64 | Mounting structures (enclosures, conduit) | EA | $ - 0 | ||
| 65 | Fiber cable (48, single mode) /1' | EA | $ - 0 | ||
| 66 | Aerial Fiber cable /1' | EA | $ - 0 | ||
| 67 | Underground Boring | EA | $ - 0 | ||
| 68 | 12/3 AWG Power cable /1' | EA | $ - 0 | ||
| 69 | 10/3 AWG Power Cable /1' | EA | $ - 0 | ||
| 70 | 2-Pair 22 AWG Twisted Pair signal cable /1' | EA | $ - 0 | ||
| 71 | 3-Pair 18 AWG Twisted Pair Signal Cable /1' | EA | $ - 0 | ||
| 72 | Grounding Rods/Plates | EA | $ - 0 | ||
| 73 | Grounding Rods/Plates Installation Material | EA | $ - 0 | ||
| 74 | Application & License Costs | EA | $ - 0 | ||
| 75 | Spare Equipment | EA | $ - 0 | ||
| 76 | Demolition Expense | EA | $ - 0 | ||
| 77 | Freight/Shipping | EA | $ - 0 | ||
| 78* | EA | $ - 0 | |||
| 79* | EA | $ - 0 | |||
| 80* | EA | $ - 0 | |||
| 81 | EA | $ - 0 | |||
| Total Material | $ - 0 | ||||
| Note: Material should be quoted at Cost (not burdened). | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite. | |||||
| Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation. | |||||
| * Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required. |
Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material
SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4
CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22
Travel CLIN Charlotte
| Contractor Name: | Proposal Dated: | December 31, 1899 | |
| 0 |
Line # Description of Trip with Estimated Date per Proposed Schedule Destination
| # of Trips | # of Travelers | # of Days | # of Nights | Total Cost | |
| 1 | 1 | ||||
| 2 | 1 | ||||
| 3 | 1 | ||||
| 4 | 1 | ||||
| 5 | 1 | ||||
| 6 | 1 | ||||
| 7 | 1 | ||||
| 8 | 1 | ||||
| 9 | 1 | ||||
| 10 | 1 | ||||
| 11 | 1 | ||||
| 12 | 1 | ||||
| 13* | |||||
| 14* | |||||
| 15* | |||||
| 16* | |||||
| 17* | |||||
| 18* | |||||
| Total Travel | $0.00 | ||||
| Note: Costs are not burdened | |||||
| Note: Gray Shaded boxes are formulas, please do not overwrite | |||||
| *Add additional lines starting at row 18 and insert as many lines as required. |
Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4
CUI Version Date: 20NOV22
Dir Labor Davenport
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .