This is a pricing spreadsheet template for Task Order 0011 under the Automated Fuel Systems Installations (AFSI) contract SP4702-23-R-0003, designated as Attachment 4 for source selection purposes. The spreadsheet is designed for contractors to submit cumulative pricing across eight military installation locations: Los Alamitos AASF (CA), Barnes Airport (MA), Will Rogers Field ANG (Oklahoma City, OK), Assault Craft Unit 5 (Camp Pendleton, CA), North Island NAS/Coronado NAB (CA), Kings Bay NSB (GA), Charlotte ANG (NC), and AASF Davenport (IA).

The template requires contractors to provide detailed cost breakdowns organized into five cost categories for each location: Direct Labor, Material Costs, Travel Costs, Other Direct Costs, and G&A/Profit/Indirect Burdens, with totals calculated to arrive at a Fixed-Price (FFP) proposal amount per site. The Direct Labor section includes 25 predefined labor categories ranging from Program Manager to various engineering and technical positions, with rates specified as burdened costs and allowance for contractors to propose alternate categories or zero hours. The Material section lists 77 specific items related to fuel systems infrastructure including server stacks, enclosures, network equipment, flow computers, conduit, cabling, and installation materials, quoted at non-burdened cost. The Travel section requires contractors to detail trips by destination, number of travelers, days, and nights at non-burdened rates. The spreadsheet uses formula-populated fields for automatic calculations and explicitly prohibits overwriting gray-shaded cells. All pricing must aggregate to a Total Evaluated Price across all eight sites, with the version date of November 20, 2022.

View the file

Other files

File Type Posted
CUI - ATGR FY26 Section L02062026.pdf PDF
ATGR FY26 Section M 02062026.pdf PDF
ATG-R Performance Work Statement.pdf PDF
SF1449finalSP470626R0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order Cumulative Price

Contractor Name:
Proposal Dated:
Los Alamitos AASF, CA CLINBarnes ARPT ANG, MA CLINWill Rogers Field ANG (Oklahoma City), OK CLINAssault Craft Unit 5 (Camp Pendelton), CA CLIN
Item #ItemPriceItem #ItemPriceItem #ItemPriceItem #ItemPrice
1Direct Labor$ - 01Direct Labor$ - 01Direct Labor$ - 01Direct Labor$ - 0
2Material Costs$ - 02Material Costs$ - 02Material Costs$ - 02Material Costs$ - 0
3Travel Costs$ - 03Travel Costs$ - 03Travel Costs$ - 03Travel Costs$ - 0
4Other Direct Cost - All Others$ - 04Other Direct Cost - All Others$ - 04Other Direct Cost - All Others$ - 04Other Direct Cost - All Others$ - 0
5G&A, Profit, All Other Indirect Burdens$ - 05G&A, Profit, All Other Indirect Burdens$ - 05G&A, Profit, All Other Indirect Burdens$ - 05G&A, Profit, All Other Indirect Burdens$ - 0
Total FFP$ - 0Total FFP$ - 0Total FFP$ - 0Total FFP$ - 0
Note: Gray Shaded boxes are formulas, please do not overwriteNote: Gray Shaded boxes are formulas, please do not overwriteNote: Gray Shaded boxes are formulas, please do not overwriteNote: Gray Shaded boxes are formulas, please do not overwrite
Note: "Total FFP" Should equal your total proposed price for completing this Task OrderNote: "Total FFP" Should equal your total proposed price for completing this Task OrderNote: "Total FFP" Should equal your total proposed price for completing this Task OrderNote: "Total FFP" Should equal your total proposed price for completing this Task Order
North Island NAS/Coronado NAB, CA CLINKings Bay NSB, GA CLINCharlotte ANG, NC CLINAASF Davenport, IA CLIN
Item #ItemPriceItem #ItemPriceItem #ItemPriceItem #ItemPrice
1Direct Labor$ - 01Direct Labor$ - 01Direct Labor$ - 01Direct Labor$ - 0
2Material Costs$ - 02Material Costs$ - 02Material Costs$ - 02Material Costs$ - 0
3Travel Costs$ - 03Travel Costs$ - 03Travel Costs$ - 03Travel Costs$ - 0
4Other Direct Cost - All Others$ - 04Other Direct Cost - All Others$ - 04Other Direct Cost - All Others$ - 04Other Direct Cost - All Others$ - 0
5G&A, Profit, All Other Indirect Burdens$ - 05G&A, Profit, All Other Indirect Burdens$ - 05G&A, Profit, All Other Indirect Burdens$ - 05G&A, Profit, All Other Indirect Burdens$ - 0
Total FFP$ - 0Total FFP$ - 0Total FFP$ - 0Total FFP$ - 0
Note: Gray Shaded boxes are formulas, please do not overwriteNote: Gray Shaded boxes are formulas, please do not overwriteNote: Gray Shaded boxes are formulas, please do not overwriteNote: Gray Shaded boxes are formulas, please do not overwrite
Note: "Total FFP" Should equal your total proposed price for completing this Task OrderNote: "Total FFP" Should equal your total proposed price for completing this Task OrderNote: "Total FFP" Should equal your total proposed price for completing this Task OrderNote: "Total FFP" Should equal your total proposed price for completing this Task Order

Total Evaluated Price (All Sites) $ - 0

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

Source Selection Information, See FAR 2.101 & 3.104 CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Direct Labor Los Alamitos

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

Source Selection Information, See FAR 2.101 and 3.104 CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material Los Alamitos

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel CLIN Los Alamitos

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination Sarah Fudela: Enter the Location of Travel

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22

Direct Labor Barnes

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material Barnes

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material

SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel CLIN Barnes

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22

Direct Labor Will Rogers

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material Will Rogers

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material

SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel CLIN Will Rogers

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22

Dir Labor Camp Pendelton

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material Camp Pendelton

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material

SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel CLIN Camp Pendelton

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22

Dir Labor North Island Coronado

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material North Island Coronado

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material

SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel North Island Coronado

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22

Direct Labor Kings Bay

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material Kings Bay

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material

SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel CLIN Kings Bay

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22

Direct Labor Charlotte

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #Labor CategoryHourly RateLabor HoursTotal
1Program Manager$0
2Project Manager$0
3Engineer/Scientist 3$0
4Engineer/Scientist 2$0
5Engineer/Scientist 1$0
6Junior Engineer/Scientist$0
7Logistician 3$0
8Logistician 2$0
9Management Analyst 2$0
10Management Analyst 1$0
11Technical Analyst 3$0
12Management and Program Technician 3$0
13Accounting Clerk II (SCA 01012)$0
14Administrative Assistant (SCA 01020)$0
15Supply Technician (SCA 01410)$0
16Computer Programmer III (SCA 14073)$0
17Computer Programmer IV (SCA 14074)$0
18Computer System Analyst III (SCA 14103)$0
19Electronics Technician II (SCA 23182)$0
20Electronics Technician III (SCA 23183)$0
21Laborer (SCA 23470)$0
22Drafter/CAD Operator II (SCA 300062)$0
23Drafter/CAD Operator III (SCA 300063)$0
24Drafter/CAD Operator IV (SCA 300064)$0
25Engineering Technician III (SCA 30083)$0
26*$0
27*$0
28*$0
29*$0
Total Labor$0
Note: Labor Rates used on this table should be burdened.
Note: Gray Shaded boxes are formulas, please do not overwrite
Note: Offerors may propose alternate Labor Categories or propose zero hours against the categories listed on lines 1-25.
* Add additonal lines starting at Row 26 for any direct labor category not listed above. Insert as many lines as required.

&"Times New Roman,Regular"&12Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Direct Labor Task Order 0011 SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Material Charlotte

Contractor Name:Proposal Dated:December 31, 1899
0
FY26
Line #ItemU/IQTYPrice/UITotal
1Server Stack (4.0)EA$ - 0
2Server Stack (4.0) Installation MaterialEA$ - 0
3Client Workstation (4.0)EA$ - 0
4Client Workstation (4.0) Installation MaterialEA$ - 0
5OCC PrinterEA$ - 0
6OCC Printer Installation MaterialEA$ - 0
7NEMA 4x Enclosure (Small) 24 x 24 x 12 (316 Stainless)EA$ - 0
8NEMA 4x Enclosure (Small) 30 x 24 x 12 (316 Stainless)EA$ - 0
9NEMA 4x Enclosure (Medium) 36 x 36 x 12 (316 Stainless)EA$ - 0
10NEMA 4x Enclosure (Large) 48 x 36 x 12 (316 Stainless)EA$ - 0
11RIUEA$ - 0
12RIU Installation MaterialEA$ - 0
13JBEA$ - 0
14JB Installation MaterialEA$ - 0
15FOP (Fiber Breakout)EA$ - 0
16FOP (Fiber Breakout) Installation MaterialEA$ - 0
17Ground Reader (GIS for Enraf)EA$ - 0
18Ground Reader (GIS for Enraf) Installation MaterialEA$ - 0
19Flow Computer (Pipeline)EA$ - 0
20Flow Computer (Truck Rack)EA$ - 0
21Flow Computer Installation MaterialEA$ - 0
22Flow TransmitterEA$ - 0
23Flow Transmitter Installation MaterialEA$ - 0
24MOVEA$ - 0
25MOV Installation MaterialEA$ - 0
26MOV Power Switch LocalEA$ - 0
27MOV Power Switch Local Installation MaterialEA$ - 0
28Network Switch (Small)EA$ - 0
29Network Switch (Medium)EA$ - 0
30Network Switch (Large)EA$ - 0
31Serial/Ethernet BridgeEA$ - 0
32PLC (Small)EA$ - 0
33PLC (Medium)EA$ - 0
34PLC (Large)EA$ - 0
35UPS (Small - .75 KVA)EA$ - 0
36UPS (Small - .75 KVA) Installation MaterialEA$ - 0
37UPS (Large - 5.3 KVA)EA$ - 0
38UPS (Large - 5.3 KVA) Installation MaterialEA$ - 0
39Surge SuppressorEA$ - 0
40Power PanelEA$ - 0
41Power Panel Installation MaterialEA$ - 0
42Power BreakerEA$ - 0
43Power SupplyEA$ - 0
44Pipeline Differential Pressure Transmitter (PDIT)EA$ - 0
45Pipeline Differential Pressure Transmitter (PDIT) Installation MaterialEA$ - 0
46Pipeline Pressure Indicating Transmitter (PIT)EA$ - 0
47Pipeline Pressure Indicating Transmitter (PIT) Installation MaterialEA$ - 0
48Tank Gauge Interface (Ground Reader)EA$ - 0
49Tank Gauge Interface (Ground Reader) Installation MaterialEA$ - 0
50Remote Annunciator (Horn/Light)EA$ - 0
51Remote Annunciator (Horn/Light) Installation MaterialEA$ - 0
52Conduit (2" HDPE) /1' - with UG BoringEA$ - 0
53Conduit (1" Galvanized) /10'EA$ - 0
54Conduit (1" PVC-Coated Galvanized) /10'EA$ - 0
55Conduit (Liquid Tight Flex) /10'EA$ - 0
56Conduit (Explosion Proof Flex) /10'EA$ - 0
57Conduit Installation MaterialEA$ - 0
58Conduit Seals (EYS)EA$ - 0
59MI Cable (Seal)EA$ - 0
60MI Cable (Seal) Installation MaterialEA$ - 0
61Conduit (PVC Underground/Concrete) /10'EA$ - 0
62Conduit Fittings - GAUEA$ - 0
63Conduit Fittings - GAU Installation MaterialEA$ - 0
64Mounting structures (enclosures, conduit)EA$ - 0
65Fiber cable (48, single mode) /1'EA$ - 0
66Aerial Fiber cable /1'EA$ - 0
67Underground BoringEA$ - 0
6812/3 AWG Power cable /1'EA$ - 0
6910/3 AWG Power Cable /1'EA$ - 0
702-Pair 22 AWG Twisted Pair signal cable /1'EA$ - 0
713-Pair 18 AWG Twisted Pair Signal Cable /1'EA$ - 0
72Grounding Rods/PlatesEA$ - 0
73Grounding Rods/Plates Installation MaterialEA$ - 0
74Application & License CostsEA$ - 0
75Spare EquipmentEA$ - 0
76Demolition ExpenseEA$ - 0
77Freight/ShippingEA$ - 0
78*EA$ - 0
79*EA$ - 0
80*EA$ - 0
81EA$ - 0
Total Material$ - 0
Note: Material should be quoted at Cost (not burdened).
Note: Gray Shaded boxes are formulas, please do not overwrite.
Note: Offerors may propose zero quantity against the items listed on lines 1-77 if not required for this Task Order/installation.
* Add additonal lines starting at Row 78 for any material item not listed above. Insert as many lines as required.

Automated Fuel Systems Installations (AFSI) &"Times New Roman,Regular"&12ATG-R - Material

SP4702-23-R-0003 &"Times New Roman,Regular"&12Attachment 4

CUI &"Times New Roman,Regular"&12Page &P of &N &"Times New Roman,Regular"&12Version Date: 20NOV22

Travel CLIN Charlotte

Contractor Name:Proposal Dated:December 31, 1899
0

Line # Description of Trip with Estimated Date per Proposed Schedule Destination

# of Trips# of Travelers# of Days# of NightsTotal Cost
11
21
31
41
51
61
71
81
91
101
111
121
13*
14*
15*
16*
17*
18*
Total Travel$0.00
Note: Costs are not burdened
Note: Gray Shaded boxes are formulas, please do not overwrite
*Add additional lines starting at row 18 and insert as many lines as required.

Automated Fuel Systems Installation (AFSI) ATG-R Task Order 0011 SP4702-23-R-0003 Attachment 4

CUI Version Date: 20NOV22