Attachment 7-KTR Work Surveillance Checklist-ICS.pdf
PDF 96 KB Posted
- Solicitation number
- SP450024R0004
- Issued by
-
Defense Logistics Agency
About this file
This document contains a contractor work surveillance checklist and details of a related federal contract opportunity for hazardous waste disposal services. The checklist is used to inspect contractors providing industrial cleaning services and ensures they arrive at the scheduled time with all required equipment in proper working order, including a 3,500 gallon vacuum truck, power washing unit, liquid transfer pump, and appropriate PPE. The contractor's equipment must be inspected and meet definition of RCRA empty prior to use.
The combined synopsis/solicitation seeks proposals for hazardous and non-hazardous waste removal, transportation and disposal services for military installations in KY, OH, TN and WV, or within 50 miles of listed pickup points. The Defense Logistics Agency is soliciting proposals under contract SP450024R0004 to provide regional hazardous waste disposal support. Services include government generated hazardous and non-hazardous waste removal from specified locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP450024R0004 Amendment 3.pdf | ||
| SP450024R0004 Amendment 2.pdf | ||
| SP450024R0004 Amendment 1.pdf | ||
| Combo Notice Description.docx | DOCX document | |
| Attachment 6 -CAC Application Process.pdf | ||
| Attachment 4_PPI Questionnaire.pdf | ||
| Attachment 2 -Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 5_Additional Contract Terms and Conditions.docx | DOCX document | |
| Attachment 10_ Addenda to 52.212-2 Evaluation.pdf | ||
| Attachment 8 -KTR Removal Empty ROB or Vac Box.pdf | ||
| Attachment 1- PWS.docx | DOCX document | |
| Attachment 3 -Pick Up Locations.xlsx | XLSX spreadsheet | |
| Attachment 9_Addenda to 52.212-1 Instructions to Offerors.pdf | ||
| Attachment 11_DLA Form 2505 Oct 2023.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Work Surveillance Checklist
Industrial Cleaning Services (ICS) – CLINs 1002SV-1004SV & 1007SV-1009SV
Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________
Name of Designated Government Representative: ___________________________________________
Title of Designated Government Representative: ____________________________________________
Phone Number of Designated Government Representative: (______) ________-___________
Yes No N/A Description of Contractor Work Surveillance
Did the work crew arrive on site at the scheduled time and date?
Did the crew arrive on site with all of the requisite equipment, including
- One standard vacuum truck (3,500-gal capacity) w/ 300 feet of hoses,
- One self-contained heated power washing unit,
- One liquid transfer pump w/ 300 feet of hoses, and
- All appropriate PPE and tools?
Did the vacuum truck driver provide a weight ticket showing the empty (tare) weight of the vacuum truck?
Was the vacuum truck inspected by a designated Government representative prior to use?
Did the vacuum truck arrive with a clean tank and hose fittings that were constructed of material that that was chemically compatible with the waste to be removed?
Did the vacuum truck arrive free of visible waste residue unless the truck was being used for multiple removals from the same project involving the same waste stream
(in which case it arrived as meeting definition of RCRA empty per 40 CFR 261.7)?
Did all of the equipment operate properly without causing delay in work?
Was the work performed to the satisfaction of the designated Government representative?
Comments:
Signature of Designated Government Representative Date
File details come from the government source that posted it. Updated .