This is a Question and Answers document from Round 4 of a Request for Information (RFI) regarding Special Packaging Instruction (SPI) boxes for DDAA weapons, issued by the Defense Logistics Agency Distribution. The document addresses 18 clarifying questions submitted by potential vendors regarding specifications, materials, and packaging requirements across multiple Contract Line Items (CLINs 0001-0004).
Key clarifications from the Q&A include: revised schedules of supply with updated material numbers and figure designations for SPI documents AM11826290, AM12976814, and AM9390000; confirmation that complete SPI kits (including fiberboard boxes and associated materials per MIL-STD-2073) are required rather than individual components; product samples are not required at quote submission; VCI wrap, MIL-PRF-22019E wrap, tape, and bore tubes are not required; blocking and bracing must be fabricated from corrugated fiberboard per specifications (ASTM D4727, Grade 275 or Grade 350 depending on the SPI); foam support assemblies referenced in SPI AM13028723 should use firm foam consistent with foam-in-place bags to support heavy weapons, not soft foam; bags and wrap are not needed for CLIN 0001; and CLINs 0002-0004 should be packed to Level B (fiberboard boxes only) rather than Level A wooden crates. The government indicated it does not yet know order quantities or delivery timing, suggesting orders may be divided arbitrarily throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0007 SF30 SP330026Q0056.pdf | ||
| Question and Answers Round 5.docx | DOCX document | |
| Amendment 0006 SF30 SP330026Q0056.pdf | ||
| Amendment 0005 SF30 SP330026Q0056.pdf | ||
| Amendment 0004 SF30 SP330026Q0056.pdf | ||
| Question and Answers Round 3.docx | DOCX document | |
| Question and Answers Round 2.docx | DOCX document | |
| Amendment 0003 SF30 SP330026Q0056.pdf | ||
| Question and Answers.docx | DOCX document | |
| Amendment 0002 SF30 SP330026Q0056.pdf | ||
| Attachment 1 - Schedule of Supplies dtd 19Mar2026.xlsx | XLSX spreadsheet | |
| Historicals.docx | DOCX document | |
| Amendment 0001 SF30 SP330026Q0056.pdf | ||
| M4 1005-01-231-0973 SPI AM9390000.pdf | ||
| Attachment 1 - Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Combined Syn Sol 26Q0056 Weapon SPI Containers.pdf | ||
| M2A1 1005-01-511-1250 SPI AM13028723.pdf | ||
| M240 1005-01-025-8095 SPI AM11826290.pdf | ||
| M240B 1005-01-412-3129 SPI AM12976814.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDAA SPI Weapon Boxes RFI:
Question #1: Material information specific to the dimensions for Fig 1, Fig 2 and Fig 3 do not match to any dimensions provided in documents SPI AM11826290 or SPI AM12976814. Please clarify with specific dimensions. Furthermore, unlike document SPI AM9390000, which shows drawings labeled Fig 1, Fig 2 and Fig 3, there is no designation provided on documents SPI AM11826290 or SPI AM12976814. Please provide updated documents with respective “figures” appropriately labeled.
Answer #1: Please see revised schedule of supply all material numbers have been updated.
Question #2: Finally, the link provided for obtaining VCI tube and VCI barrier bag times out and will not open. Please provide preferred vendor contact for these items.
Answer #2: Omitted the bags from the material descriptions.
Question #3: Our understanding is that the requirement is for complete Special Packaging Instruction (SPI) kits (including the fiberboard box and associated packaging materials such as inserts, barrier bags, etc.) in accordance with MIL-STD-2073, rather than individual packaging components supplied separately. Please confirm if this interpretation is correct.
Answer #3: Correct Question #4: We did not see a requirement for submission of product samples with the quotation. Please confirm that samples are not required at the time of quote submission.
Answer #4: Not required Question #5: For SPI AM9390000, the barrier bags we need to supply, it states "SEE ARDEC DWG 13027484 FOR DETAIL." Are you able to provide?
Answer #5: Omitted the bags from the material descriptions.
Question #6: For CLIN 0001, Attachment 1 says that items 1-8 are needed, where 1 is assembled and items 2-8 are unassembled, assuming inside the box. It also says that cushioning must be made of fiberboard. Is this accurate? The detailed pictures of CLIN 0001 show foam cushioning being used.
Answer #6: See revised Schedule of Supply, if it applies it’s mentioned in the SPI.
Question #7: The description for CLINS 0001-0004 on Attachment 1 seems to be identical, yet the drawings seem very different. Is all this information, correct?
Answer #7: See revised Schedule of Supply Question #8: All CLIN descriptions say that foam will not be accepted, and that fiberboard must be used. I just want to make sure this is accurate.
Answer #8: See revised Schedule of Supply, if it applies it’s mentioned in the SPI.
Question #9: Can we expect the order quantities to match historical records of full quantities at time of order, or will orders be divided up into arbitrary amounts over the course of the year?
Answer #9: We do not know the amounts at this time so there is no way to know what the amounts will be at time of the delivery order.
Question #10: Do you require the VCI wrap and MIL-PRF-22019E WRAP?
Answer #10: No Question #11: Do you require tape for the SPIs where tape is required? I think you said, no, but want to clarify.
Answer #11: No Question #12: Do you still want to include the Bore Tubes for each of the SPIs?
Answer #12: No Question #13: For SPI AM11826290 - BLOCKING AND BRACING FOR ITEMS SHALL BE FABRICATED IN ACCORDANCE WITH DRAWING ON PAGES 4 THROUGH 6. To be clear, is this a custom die-cut blocking piece made from double wall fiberboard pads, which seems to be aligned with the ASTM D4727, DW, GRADE 350? Do you have a picture of what you are looking for?
Answer #13: Yes
Question #14: For SPI AM9390000, It states to DESIGN AND FABRICATE / ASSEMBLE FROM SHEET STOCK AND OR DIE CUTS. BLOCKING IS TO IMMOBILIZE RIFLE IN THE BOX. BLOCKING SHALL BE FIBER BOARD, TYPE CF, GRADE 275, VARIETY SW / DW. SEE FIGURES 1 AND 2. To be clear, is this just a custom build-up referencing figure 1 &2 using, corrugated Fiberboard, Grade 275 (DW)?
Answer #14: Yes Question #15: SPI AM13028723 references a BOTTOM FOAM SUPPORT ASSEMBLY - 1 EA. SEE PAGES 6, 7, AND 8, and TOP FOAM SUPPORT ASSEMBLIES - 2 EA. SEE PAGES 6, 7, AND 8; however, in the spreadsheet we are told not to use foam. What specific material is required to fabricate these support pieces. The SPI is not clear on this. – Answer #15: Follow the SPI. I agree the SPI is not clear on the type of foam so we can use pretty much any foam needed to meet the requirement. Looking at this picture in the SPI, it needs to be the consistency of foam used in the foam-in-place bags. It can’t be a soft foam as the weapons are heavy and they just sink into a soft foam.
Question #16: SPI AM 12976814, references FIBERBOARD BLOCKING AND BRACING (SEE DRAWINGS ON PAGES (4 – 8), ASTM D4727. To be clear, is this a build-up of ASTM D4727 Corrugated Fiberboard Pads?
Answer #16: Yes Question #17: On Clin 0001, AM13028723, the newest schedule calls for Operation numbers 1-4 and 8-10. This will include some bags and wrap but question2 2 and 10 says to omit bags and wrap. Are bags and wrap needed for Clin 0001?
Answer #17: No Question #18: Do Clins 0002-0004 still get shipped in a Level A wooden crate as stated under E. Packing?
Answer #18: level a is not required; pack to level B which is just the fiberboard boxes.