Question and Answers Round 2.docx

DOCX document 15 KB Posted

Attached to
DDAA WEAPON SPECIAL PACKAGING INSTRUCTIONS (SPI) BOXES
Solicitation number
SP330026Q0056
Issued by

About this file

This is a Question and Answers document (Round 2) for the DDAA Weapon Special Packaging Instructions (SPI) Boxes Request for Information (RFI) issued by the Defense Logistics Agency Distribution (Solicitation Number SP330026Q0056).

The Q&A document addresses nine critical clarifications regarding the specification and packaging requirements for Special Packaging Instruction kits across multiple CLINs (0001-0004). Key points resolved include: dimension discrepancies between figures in different specification documents (SPI AM11826290, SPI AM12976814, and SPI AM9390000) have been addressed through a revised Schedule of Supply with updated material numbers; vendor contact information for VCI tubes and barrier bags was omitted from material descriptions; confirmation that complete SPI kits (including fiberboard boxes and associated packaging materials per MIL-STD-2073) are required rather than individual components; product samples are not required at quotation submission; cushioning material specifications have been clarified in the revised Schedule of Supply, with fiberboard required where specified; and CLIN descriptions and associated drawings have been updated for consistency. The government indicated uncertainty regarding order quantities and stated they cannot be predicted at the time of delivery order, indicating orders may be divided arbitrarily throughout the year rather than provided in full quantities at order placement.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDAA SPI Weapon Boxes RFI:

Question #1: Material information specific to the dimensions for Fig 1, Fig 2 and Fig 3 do not match to any dimensions provided in documents SPI AM11826290 or SPI AM12976814. Please clarify with specific dimensions. Furthermore, unlike document SPI AM9390000, which shows drawings labeled Fig 1, Fig 2 and Fig 3, there is no designation provided on documents SPI AM11826290 or SPI AM12976814. Please provide updated documents with respective “figures” appropriately labeled.

Answer #1: Please see revised schedule of supply all material numbers have been updated.

Question #2: Finally, the link provided for obtaining VCI tube and VCI barrier bag times out and will not open. Please provide preferred vendor contact for these items.

Answer #2: Omitted the bags from the material descriptions.

Question #3: Our understanding is that the requirement is for complete Special Packaging Instruction (SPI) kits (including the fiberboard box and associated packaging materials such as inserts, barrier bags, etc.) in accordance with MIL-STD-2073, rather than individual packaging components supplied separately. Please confirm if this interpretation is correct.

Answer #3: Correct Question #4: We did not see a requirement for submission of product samples with the quotation. Please confirm that samples are not required at the time of quote submission.

Answer #4: Not required Question #5: For SPI AM9390000, the barrier bags we need to supply, it states "SEE ARDEC DWG 13027484 FOR DETAIL." Are you able to provide?

Answer #5: Omitted the bags from the material descriptions.

Question #6: For CLIN 0001, Attachment 1 says that items 1-8 are needed, where 1 is assembled and items 2-8 are unassembled, assuming inside the box. It also says that cushioning must be made of fiberboard. Is this accurate? The detailed pictures of CLIN 0001 show foam cushioning being used.

Answer #6: See revised Schedule of Supply, if it applies it’s mentioned in the SPI.

Question #7: The description for CLINS 0001-0004 on Attachment 1 seems to be identical, yet the drawings seem very different. Is all this information, correct?

Answer #7: See revised Schedule of Supply Question #8: All CLIN descriptions say that foam will not be accepted, and that fiberboard must be used. I just want to make sure this is accurate.

Answer #8: See revised Schedule of Supply, if it applies it’s mentioned in the SPI.

Question #9: Can we expect the order quantities to match historical records of full quantities at time of order, or will orders be divided up into arbitrary amounts over the course of the year?

Answer #9: We do not know the amounts at this time so there is no way to know what the amounts will be at time of the delivery order.