Attachment 36 - AMHE DIDs (DI-DLAMGMT-00003 Testing and Verification Plan).pdf

PDF 123 KB Posted

Attached to
Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution Federal contract opportunity
Solicitation number
SP3300-20-R-5002
Issued by
Defense Logistics Agency Distribution

About this file

This document contains a Data Item Description and Testing and Verification Plan for the Logistics Modernization Integration Support solicitation for the Defense Logistics Agency Distribution. The solicitation seeks offers for logistics modernization integration support services. Key requirements include developing and implementing a testing and verification plan to validate performance and compatibility of solutions, systems, subsystems, and components. The plan must define verification objectives, methodology, documentation, schedules, and responsibility for verification activities. It must also address concepts verification, testing at contractor and government sites, computer system and data collection testing, consideration of government furnished equipment and material, and technical support needs. The Defense Logistics Agency Distribution is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution, newest first.
File Type Posted
LMIS RFP SP3300-20-R-5002 Amendment 0009.pdf PDF
LMIS RFP Questions and Responses Version 3.xlsx XLSX spreadsheet
RFP SP3300-20-5002 Rev. 3 (02.28.20) Tracked Changes.docx DOCX document
RFP SP3300-20-5002 Rev. 2 (02.19.20).pdf PDF
LMIS RFP SP3300-20-R-5002 Amendment 0006.pdf PDF
Attachment 20 - Service Contract Act Wage Determination.pdf PDF
Attachment 15 - EDC Modernization CDRLs & DIDs Cross Reference.xlsx XLSX spreadsheet
LMIS RFP Questions and Responses Version 2.xlsx XLSX spreadsheet
Attachment 37 - AMHE Compliance Checklist.xlsx XLSX spreadsheet
Attachment 39 - Service Contract Act Wage Determination.pdf PDF
Attachment 7 - Schedule Page (Pool 1) Rev. 1.xlsx XLSX spreadsheet
LMIS RFP SP3300-20-R-5002 Amendment 0005.pdf PDF
Attachment 43 - TE 1.4 CIRS Tutorial.pdf PDF
Attachment 44 - TE 1.5 Contractor Investigative Request Sep 2016.pdf PDF
LMIS RFP Questions and Responses.xlsx XLSX spreadsheet
RFP SP3300-20-5002 Rev. 1 (01.21.20).pdf PDF
Attachment 45 - TE 1.6 DD2875 SAAR Aug 2009.pdf PDF
Attachment 32 - Pool 2 Continuation of Supplies Services Instructions Rev. 1 (01.17.20).pdf PDF
Attachment 42 - TE 1.3 CIRS Manual.pdf PDF
LMIS Pre-Proposal Conference Questions & Answers.pdf PDF
LMIS Pre-Proposal Conference Agenda.pdf PDF
RFP SP3300-20-R-5002 Amendment 0001.pdf PDF
Attachment 13 - Implementation Project Schedule.pdf PDF
Attachment 32 - Pool 2 Continuation of Supplies Services Instructions.pdf PDF
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 6 - CDRLs (CDRL A002 - Small Business Participation Biannual Progress Report).pdf PDF
Attachment 1 - Basic IDIQ PWS.pdf PDF
Attachment 3 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00008 GFE & GFP Report Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00013 Certificate of Compliance).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00002 Commercial Manual).pdf PDF
Attachment 8 - Pool 1 Continuation of Supplies Services Instructions.pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_DE_R-.DWG).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00003 Warranty Information and Technical Representatives List).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00004 Training Baseline (TB) and Training Materials).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00006 Network Infrastructure and Comm Protocols, Ports, Services).pdf PDF
RFP SP3300-20-5002.pdf PDF
Attachment 31 - Pool 2 Schedule.xlsx XLSX spreadsheet
Attachment 35 - LMIS IDIQ -AMHE and Systems sample TO CDRL DD Form 1423.pdf PDF
Attachment 4 - TE 1.1 Contractor Personnel Security - UPDATE 26FEB2018.pdf PDF
Attachment 5 - TE 1.2 CAC Procedures.pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_EL_R-.DWG).pdf PDF
Attachment 34 - AMHE Drawings (AMHE Drawings).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00002 Software, Firmware, and Coding Inventory Requirements).pdf PDF
Attachment 6 - CDRLs (CDRL A001 - Monthly Contractor Employee CAC Report).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00010 DoDM 8570 Report Requirements).pdf PDF
Attachment 10 - EDC Modernization Compliance Checklist.xlsx XLSX spreadsheet
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00007 Affirmation of Coding Integrity and Unused Software Services).pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_EX_R-.DWG).pdf PDF
Attachment 7 - Schedule Page (Pool 1).xlsx XLSX spreadsheet
Show all 50

Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form Approved OMB No. 0704-0188

Page ___ of ___ Pages

PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)

DATA ITEM DESCRIPTION

1. TITLE 2. IDENTIFICATION NUMBER

3. DESCRIPTION/PURPOSE

4. APPROVAL DATE

(YYYYMMDD)

5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE

7. APPLICATION/INTERRELATIONSHIP

8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER

10. PREPARATION INSTRUCTIONS

11. DISTRIBUTION STATEMENT

Distribution Statement A: Approved for public release; distribution is unlimited.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.

Page ___ of ___ Pages

PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)

DATA ITEM DESCRIPTION

1. TITLE 2. IDENTIFICATION NUMBER

3. DESCRIPTION/PURPOSE

4. APPROVAL DATE

(YYYYMMDD)

5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE

7. APPLICATION/INTERRELATIONSHIP

8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER

10. PREPARATION INSTRUCTIONS

11. DISTRIBUTION STATEMENT

Distribution Statement A: Approved for public release; distribution is unlimited.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.

Page ___ of ___ Pages

PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)

DATA ITEM DESCRIPTION

1. TITLE 2. IDENTIFICATION NUMBER

3. DESCRIPTION/PURPOSE

4. APPROVAL DATE

(YYYYMMDD)

5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE

7. APPLICATION/INTERRELATIONSHIP

8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER

10. PREPARATION INSTRUCTIONS

11. DISTRIBUTION STATEMENT

Distribution Statement A: Approved for public release; distribution is unlimited.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.

DI-LMIS-00009 System Test and Verification Plan
DI-LMIS-00003 Drawings, Engineering, and Associated Lists
Untitled

DD Form 1664 (BLANK)

DD Form 1664 (BLANK)

1 TITLE: Testing and Verification Plan
2 IDENTIFICATION NUMBER: DI-DLAMGMT-00003
3 DESCRIPTIONPURPOSE: 3.1 This plan identifies the technical and capability requirements which are to be satisfied by the contract as well as the methodology by which satisfaction is achieved. It provides the Government with the necessary planning information to execute solution and system verification activities.
4 APPROVAL DATE YYYYMMDD: N/A
5 OFFICE OF PRIMARY RESPONSIBILITY OPR: DLA Information Operations - J62B
6a DTIC APPLICABLE: N/A
6b GIDEP APPLICABLE: N/A
7 APPLICATIONINTERRELATIONSHIP: 7.1 This Data Item Description (DID) is applicable to a system procurement when a general test and verification plan is required on all contractor performance and work actions necessary to comply with the SOW or PWS. It specifies format and content of data developed during contract performance.

7.2 This DID may be applied to programs or projects during Material Solution Analysis (MSA), Technology Maturation & Risk Reduction (TMRR), Engineering & Manufacturing Development (EMD), Production & Deployment (P&D), and Operations & Support (O&S) phases of the Defense Acquisition Life Cycle.

8 APPROVAL LIMITATION: N/A
9a APPLICABLE FORMS: N/A
9b AMSC NUMBER: N/A
1010 PREPARATION INSTRUCTIONS: 10.2.b.4 Buy-off Basis: The basis for the acceptance of the solution and its system, subsystems, and components.

10.2.c Concept Verification: The combination of analyses or simulation(s) employed to provide early verification the solution, its systems, subsystems and components.

10.2.d Verification at the Contractor's Site: If applicable, the means by which the solution and its systems, subsystems, and components will be verified at the Contractor's location and the standards to be used.

10.2.e Verification at the Government Site: If applicable, the means by which the solution and its systems, subsystems, and components will be verified at the Government installation site and the standards to be used.

10.2.f Computer System and Data Collection Testing: The means by which the solution's computer systems, subsystems, software, and data collection(s) will be tested. This must include any applicable software integration in accordance with any project schedule (such as an Integrated Master Schedule (IMS)) as well as identification of all test documentation (such as test scripts, protocols, graphics, models, flow charts, etc) associated with each phase or activity. This must also include consideration of all hardware and equipment integrating with off-the-shelf and/or customized software.

10.2.g Verification Steps: Definition on what entity(ies) will be responsible for verification activities and the approximate length those activities.

(Continued)

PAGE NUMBER 11: 2
PAGE NUMBER 2: 3
10 PREPARATION INSTRUCTIONS: 10.1 Format: The plan must be in the Contractor's design unless otherwise specified on the Contract Data Requirements List (CDRL / DD Form 1423). Unless stated otherwise on the CDRL, the deliverable to the Government must be provided in digital format and viewable using the latest version of Microsoft Office or Adobe software products as applicable.

10.2 Content: The plan must contain a table of contents; page numbering; general planning information on the solution / system verification activities; identification of any specific requirements which are to be satisfied through testing; and the methodologies which must be incorporated to verify satisfaction of those requirements. Additionally, the plan must also contain the following:

10.2.a Introduction: A brief description of the plan and its relationship to the entire project.

10.2.b Verification Objectives: A detailed description for each of the following specific verification objectives:

10.2.b.1 Verification: That the solution and its system, subsystems, and component yield the specified performance desired.

10.2.b.2 Confidence: That the defects, marginal designs, marginal components are detected early in the testing sequence for the solution and its system, subsystems, and components.

10.2.b.3 Compatibility: That the solution and all of its systems, subsystems, and components as built and installed are capable of performing the required function(s) and are compatible / integrated with each other as well as existing Government systems.

(Continued)

PAGE NUMBER 1: 1
101010 PREPARATION INSTRUCTIONS: 10.2.h Government Furnished Equipment (GFE) and Government Furnished Material (GFM): If applicable, the GFE and GFM resources testing must be addressed as to the specification(s) and/or standards identified for the solution and its systems, subsystems, and components.

10.2.i. Technical Support: A description of any significant technical support required to implement each part of the testing and verification effort.

10.2.j References: A listing of any documents upon which the plan is based or which relate significantly to any portion of the testing and verification effort.

10.3 Revisions: Unless otherwise indicated by revision and date, the plan submitted by the Contractor to the Government as cited within this DID will be considered the most up to date iteration. Revisions to the plan must be provided by the Contractor with an accompanying summary that clearly identifies to the Government all changes at the time of submission.

PAGE NUMBER 111: 3