Attachment 35 - LMIS IDIQ -AMHE and Systems sample TO CDRL DD Form 1423.pdf
PDF 913 KB Posted
- Attached to
- Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution Federal contract opportunity
- Solicitation number
- SP3300-20-R-5002
- Issued by
- Defense Logistics Agency Distribution
About this file
This Contract Data Requirements List (CDRL) outlines 22 data items required under a Logistics Modernization Integration Support (LMIS) contract for the Defense Logistics Agency (DLA) Distribution. Key deliverables include an Integrated Master Schedule, Project Management Plan, Layout Drawings, Operating/Maintenance Manuals, Training Materials, Power Requirements, Design Data Calculations, Testing/Verification Plans, Software/Firmware Inventories, Architecture Documentation, Hardware Inventories, Certificates of Compliance, GFE/GFP Reports, In-Progress Review Reports, DoDM 8570 Reports, Software Access Controls, Network Infrastructure Protocols, Coding Integrity Affirmations, Physical/Cybersecurity Features. Delivery dates vary from 30 days after award to monthly, and copies must be submitted electronically and on CD-ROM in specified formats like MS Office, PDF and AutoCAD. Prices for developing each data item are to be estimated according to four groups based on related effort and conforming to requirements.
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
AWOS w/ Auto Labeling
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
INTEGRATED MASTER SCHEDULE (IMS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00011
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 20 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/ MANUFACTURE.
* COPIES ELECTRONICALLY IN MS PROJECT AND PDF FORMAT
DLA INFO OPS - J62B 1 2
DLA DIST SERV - FD 1 2
15. TOTAL 2 4 0
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
PROJECT MANAGEMENT PLAN (PMP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00012
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 20 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/ MANUFACTURE
* COPIES ELECTRONICALLY IN MS OFFICE AND PDF FORMAT
DLA INFO OPS - J62B 1 2
DLA DIST SERV - FD 1 2
15. TOTAL 2 4 0
1. DATA ITEM NO.
A003 & A004
2. TITLE OF DATA ITEM
LAYOUT DRAWINGS & AS BUILT DRAWINGS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMISC-00001
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA DIST SERV - FD
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO CONTRACT COMPLETION
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY AND ON CD IN AUTOCAD AND PDF FORMAT
DLA INFO OPS - J62B 1 2
DLA DIST SERV - FD 1 5
CD 3
15. TOTAL 2 10 0
1. DATA ITEM NO.
A005 & A006
2. TITLE OF DATA ITEM
OPERATING & MAINTENANCE MANUALS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMISC-00002
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA DIST SERV - FD
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO INSTALLATION COMPLETION
* APPROVAL REQUIRED PRIOR TO TESTING START DATE
* COPIES ELECTRONICALLY AND ON CD IN MS OFFICE AND PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 5
CD 2
15. TOTAL 0 9 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page 1 of 5 Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
AWOS w/ Auto Labeling
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
WARRANTY INFO AND TECH REP LIST
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMISC-00003
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA DIST SERV - FD
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO INSTALLATION COMPLETION
* COPIES ELECTRONICALLY IN MS PROJECT AND PDF FORMAT
DLA DIST SERV - FD 2
DLA INFO OPS - J62B 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
TRAINING BASELINE (TB) & TRAINING MAT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMISC-00004
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA DIST SERV - FD
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO INSTALLATION COMPLETION
* COPIES ELECTRONICALLY AND ON CD IN MS OFFICE AND PDF FORMAT
DLA DIST SERV - FD 2
DLA INFO OPS - J62B 2
CD 2
15. TOTAL 0 6 0
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
POWER REQUIREMENTS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMISC-00005
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA DIST SERV - FD
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY AND ON CD IN MS OFFICE AND PDF FORMAT
DLA DIST SERV - FD 1 2
CD 2
15. TOTAL 1 4 0
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
DESIGN DATA CALCULATION
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMISC-00006
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA DIST SERV - FD
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO MANUFACTURE
* COPIES ELECTRONICALLY AND ON CD IN MS OFFICE AND PDF FORMAT
DLA DIST SERV - FD 1 2
CD 2
15. TOTAL 1 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page 2 of 5 Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
AWOS w/ Auto Labeling
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
TESTING AND VERIFICATION PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00003
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO TESTING START DATE
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA DIST SERV - FD 1 2
DLA INFO OPS - J62B 1 2
15. TOTAL 2 4 0
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
SOFTWARE, FIRMWARE, AND CODING INV
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00002
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA DIST SERV - FD 1 2
DLA INFO OPS - J62B 1 2
15. TOTAL 2 4 0
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
DOD ARCHITECTURE FRAMEWORK DOC
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00005
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO INSTALLATION COMPLETION
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 1 2
DLA DIST SERV - FD 1 2
15. TOTAL 2 4 0
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
HARDWARE INVENTORY REQUIREMENTS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00001
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 1 2
DLA DIST SERV - FD 1 2
15. TOTAL 2 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page 3 of 5 Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
AWOS w/ Auto Labeling
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
CERTIFICATE OF COMPLIANCE
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00013
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 5 DAYS PRIOR TO CONTRACT COMPLETION
* COPIES ELECTRONICALLY IN PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
GFE / GFP REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00008
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MONTHLY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER AWARD AND REOCCURING MONTHLY THEREAFTER
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
IN-PROGRESS REVIEW (IPR) REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00014
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MONTHLY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER AWARD AND REOCCURING MONTHLY THEREAFTER
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
DoDM 8570 REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00010
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MONTHLY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
NO
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER AWARD AND AS NEEDED THEREAFTER
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 2
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 4 of 5 Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
DLA INFO OPS - J62B
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
AWOS w/ Auto Labeling
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
SOFTWARE - FIRMWARE ACCESS CONTROLS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00004
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
NETWORK INFRASTRCTURE COMM PROTOCOLS
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00006
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS AFTER CONTRACT AWARD
* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE
* COPIES ELECTRONICALLY IN MS OFFICE OR PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
AFFIRM OF CODING INTEGRITY
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00007
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
DLA INFO OPS - J62B
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO INSTALLATION COMPLETION
* COPIES ELECTRONICALLY AND ON CD IN MS OFFICE AND PDF FORMAT
DLA INFO OPS - J62B 2
DLA DIST SERV - FD 2
15. TOTAL 0 4 0
1. DATA ITEM NO.
A022
2. TITLE OF DATA ITEM
PHYSICAL & CYBERSECURITY FEATURES
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-DLAMGMT-00009
5. CONTRACT REFERENCE
SPEC. PARA 4.4
6. REQUIRING OFFICE
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
YES
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 DAYS PRIOR TO INSTALLATION COMPLETION
* COPIES ELECTRONICALLY AND ON CD IN MS OFFICE AND PDF FORMAT
DLA INFO OPS - J62B 2
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 5 of 5 Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
DLA INFO OPS - J62B
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK), AUG 96
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg1 |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg2 |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg3 |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg4 |
| DD FORM 1423, AUG 96 |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423 (BACK), AUG 96
| 1.pdf |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg1 |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg2 |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg3 |
| LMIS IDIQ -AMHE and Systems Sample TO DD Form 1423 Pg4 |
| DD FORM 1423, AUG 96 |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423 (BACK), AUG 96
File details come from the government source that posted it. Updated .