A010 - Monthly Cost Report for CLIN X001- DDDC 9.23.19 Signed.pdf

PDF 622 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA
Solicitation number
SP3300-20-R-5001
Issued by

About this file

This document package includes a federal contract opportunity and related files for warehousing services at the Defense Logistics Agency Distribution facility in San Diego, California. The solicitation seeks proposals for warehouse and distribution support services including receipt, storage, and issue of depot level repairables, electronics, industrial products, medical supplies, general supplies, construction materials, clothing, packaged petroleum, chemicals, metals, and ship and aviation repair parts. The incumbent contractor provides these services across three Defense Logistics Agency Distribution sites in the San Diego area, including a primary wholesale support location at Naval Base San Diego and Naval Air Station North Island, as well as retail support at Naval Base Coronado. Additional services are provided at the Naval Base Point Loma facility. Proposals are due by the date specified in the solicitation for a contract to begin on the date indicated, with the Defense Logistics Agency Distribution as the contracting agency.

View the file

Other files

File Type Posted
Attachment J.38 Staffing Matrix 3-20-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0008 3-20-2020.docx DOCX document
Attachment J.28 TE 5.2 DDDC Projected Workload 3-19-2020.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-12-2020.xlsx XLSX spreadsheet
Amendment 0006.pdf PDF
A007 - 3.13.2020 Customer Service Support (CSS) Procedures-On-Call Response Roster.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
SP330020R5001 Amend 0006 3-12-2020.docx DOCX document
Attachment J.1 DDDC Performance Work Statement 3-12-2020.docx DOCX document
SP330020R5001 Amend 0005 3-9-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-9-2020.xlsx XLSX spreadsheet
Amendment 0005.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.9.2020.docx DOCX document
SP330020R5001 Amend 0004 3-3-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.2.2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-2-2020.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
Attachment J.33_TE 5.6_ Local Delivery and Pick Up Points.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-27-2020.docx DOCX document
Attachment J.39 Training Plan 2-12-2020.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
SP330020R5001 Amend 0003 2-27-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
Attachment J.28 TE 5.2 DDDC Projected Workload 2-5-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 2-5-2020.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-5-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-5-2020.xlsx XLSX spreadsheet
SP330020R5001 Amend 0002 2-5-2020.docx DOCX document
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Amendment 0002.pdf PDF
Attachment J.40 Draft Distribution Training Schedule 2-5-2020.xlsx XLSX spreadsheet
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
A004 - MECSP 1.28.20.pdf PDF
DDDC SP3300-20-R-5001 Questions 1.29.2020.pdf PDF
Attachment J.45, TE 5.13N - MTIS - Process Map.pdf PDF
DLA i6055.01 Aug 10 2018.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.26 TE 5.0 APLs.doc DOC document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update thru FY19.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
SP330020R5001 Amend 0001 (w tracked changes).docx DOCX document
A002 - SOH Plan and Reporting Amend0001.pdf PDF
Show 40 more

Latest 50 of 132 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Attachment 1 Current Month, Cumulative Performance Period Labor Costs and Staffing Data

Contractor: DLA Distribution Performance Period:

Month: - Current Period Costs

CLIN

Cost Category Monthly Target Price Monthly Actual Cost Variance (Target - Actual) % Variance (Target - Actual) Personnel on Board

Hours Dollars Hours Dollars Hours Dollars Hours Dollars Full-Time Part-Time

PRIME LABOR

SUBCONTRACTOR LABOR

SUBTOTAL

OVERHEAD & G&A

SUBTOTAL

FEE

CLIN TOTAL

Contractor: DLA Distribution Performance Period:

As of Month: - Cumulative Costs for Performance Period to Date

CLIN _____

Cost Category

Total Contract Target Price

Total Actual Cost to Date Variance (Target - Actual)

(Cumulative) % Variance (Target - Actual)

(Cumulative) % Variance Personnel on

Board (Cumulative)

Hours Dollars Hours Dollars Hours Dollars Hours Dollars Full-Time Part-Time

PRIME LABOR

SUBCONTRACTOR LABOR

SUBTOTAL

OVERHEAD & G&A

SUBTOTAL

FEE

CLIN TOTAL

Actual Target

DLA DISTRIBUTION _______________

TARGET VERSES ACTUAL COST PERFORMED

CLIN _________

SAMPLE

Dec

C O

ST

REPORT MONTH/YEAR

Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs Hours Costs

October

November

December

January

February

March

April

May

June

July

August

September

Yearly Total

Exempt - Includes exempt labor such as site manager, alternate site manager, safety manager, etc. except for supervisors whose sole role is in direct support of wholesale or retail mission. Contractor to annotate positions which are considered indirect below:

PSNY Support

Building 633

Cost Center 16069

PPP&M - ICP or customer directed actions to meet preservation and packaging specifications or contract requirements. Includes Pre-Packing, Preservation, Remarking, and Repacking of items for storage

MPC San Diego - Functions include: Receiving, Debulking, Detrashing, and Customized sorting IAW customer directions, Temporary Storage, Re-packaging and Delivery and Freight Forwarding functions for the movement of material

MPC Point Loma - Functions include: Receiving, Debulking, Detrashing, and Customized sorting IAW customer directions, Temporary Storage, Re-packaging and Delivery and Freight Forwarding functions for the movement of material

Portsmount Navy Shipyard Support - Functions include receipt control, custody storage, Job Order Key Operations (JOB/KOP) management and distribution functions in support of Portsmouth Naval Shipyard Detachment submarine maintenance

Equipment Maintenance - Functions include preventive and unscheduled maintenance of Government Equipment and other Government owned equipment.

Security - Functions include manifest checkers and sentry gate guard patrol.

Security

Cost Center 16104

Exempt

Cost Center 16100

Business Segments:

Wholesale - Direct Mission, Receipt and Stow Operations, Issue, Pack for Shipment including small boats/landing crafts and Level 1/Subsafe

Retail - Storage and Distribution functions performed at Industrial Sites including small boats/landing crafts and level 1/Subsafe

Storage - Storage and Physical Inventory. Includes: Stock Readiness Inspections / Care of Stock in Storage (non -reimbursable) / Rewarehousing / Physical Inventory Operations. Actions with IONs are to be reported on CDRL A005. AdHoc: 16062A

Current Fiscal Year Contractor Workload Reporting DLA Distribution San Diego FY 2020

Wholesale

Cost Center 16060

Retail

Cost Center 16061

Storage

Cost Center 16062

AdHoc

Cost Center 16062A

PPP&M

Cost Center 16065

MPC San Diego

Cost Center 16066

MPC Point Loma

Cost Center 16068

PSNY Support BLDG 659

Cost Center 16069

Equipment

Maintenance Cost

Center 16101/16103

DDBC.pdf
Business Segments
DDBC.pdf
Business Segments
DDBC.pdf
Business Segments
DDBC.pdf
Business Segments
DDBC.pdf
Business Segments
DDBC.pdf
Business Segments
A010 - Attachment 2.pdf
Business Segments
1_DATA_ITEM_NO: A010
2_TITLE_OF_DATA_ITEM: Monthly Cost Report for CLIN X001
3_SUBTITLE: Labor CLIN
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Section G, Paragraph G-4
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1:
repro1: 1
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3: iRAPT
draft3:
reg3:
repro3: 1
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 2
16_REMARKS: Submit electronically.

IAW Section G-4 - Invoicing Instructions - submitted not later than the tenth (10th) working day of each month covering the previous month's charges inclusive of all final subcontractor billings for the prior month.

For CLIN FPIF - Complete the following attachments:

Attachment 1 - Current Month and Cumulative Performance Period Labor Costs and Staffing Data with graphical representation of Cumulative Performance Period Target Costs and Actual Costs Attachment 2 - Contractor Labor Hour/Cost Reporting by Business Segment

Block 7 - Inspection and acceptance requirements:

The COR will review and accept CDRL A010.

Block 14 - Distribution - Contractor to submit original to COR and copy to the Contract Specialist. Following approval of the CDRL submission, the Contractor shall upload the approved CDRL documents to iRAPT with invoice submission.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page:
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X001
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages:
Reset:
2019-09-23T16:07:35-0400
VANSANT.PATRICK.S.1290159519
2019-09-24T07:39:10-0400
SNAVELY-HOWE.ROSE.M.1228965037

File details come from the government source that posted it. Updated .