A004 - Surge, Sustainment, and Disaster Recovery Plan (SSDRP).pdf

PDF 278 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA
Solicitation number
SP3300-20-R-5001
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) for a Surge, Sustainment, and Disaster Recovery Plan (SSDRP) to be provided by a contractor supporting warehousing and distribution services at Defense Logistics Agency (DLA) Distribution sites in San Diego, California. The CDRL requires the contractor to submit a SSDRP addressing potential impacts, primary issues, response strategies, and processes for recovery from adverse situations at minimum. It also outlines requirements for maintaining critical skills and knowledge, developing a contingent workforce, and ensuring workforce familiarity in the event of a disruption to normal operations. The SSDRP must be submitted at contract award and annually thereafter, with updates submitted within 30 days of any plan revisions. The contracting officer will review and accept the initial SSDRP and any updates after coordination with the contracting officer's representative and DLA Distribution operations reviews.

View the file

Other files

File Type Posted
Attachment J.38 Staffing Matrix 3-20-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0008 3-20-2020.docx DOCX document
Attachment J.28 TE 5.2 DDDC Projected Workload 3-19-2020.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-12-2020.xlsx XLSX spreadsheet
Amendment 0006.pdf PDF
A007 - 3.13.2020 Customer Service Support (CSS) Procedures-On-Call Response Roster.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
SP330020R5001 Amend 0006 3-12-2020.docx DOCX document
Attachment J.1 DDDC Performance Work Statement 3-12-2020.docx DOCX document
SP330020R5001 Amend 0005 3-9-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-9-2020.xlsx XLSX spreadsheet
Amendment 0005.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.9.2020.docx DOCX document
SP330020R5001 Amend 0004 3-3-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.2.2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-2-2020.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
Attachment J.33_TE 5.6_ Local Delivery and Pick Up Points.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-27-2020.docx DOCX document
Attachment J.39 Training Plan 2-12-2020.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
SP330020R5001 Amend 0003 2-27-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
Attachment J.28 TE 5.2 DDDC Projected Workload 2-5-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 2-5-2020.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-5-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-5-2020.xlsx XLSX spreadsheet
SP330020R5001 Amend 0002 2-5-2020.docx DOCX document
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Amendment 0002.pdf PDF
Attachment J.40 Draft Distribution Training Schedule 2-5-2020.xlsx XLSX spreadsheet
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
A004 - MECSP 1.28.20.pdf PDF
DDDC SP3300-20-R-5001 Questions 1.29.2020.pdf PDF
Attachment J.45, TE 5.13N - MTIS - Process Map.pdf PDF
DLA i6055.01 Aug 10 2018.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.26 TE 5.0 APLs.doc DOC document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update thru FY19.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
SP330020R5001 Amend 0001 (w tracked changes).docx DOCX document
A002 - SOH Plan and Reporting Amend0001.pdf PDF
Show 40 more

Latest 50 of 132 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

DD FORM 1423-1, FEB 2001 Page 2of 2

The Contractor’s SSDRP shall address at a minimum the following:

1. Potential impacts caused by each type of adverse situation.

2. Primary issues.

3. Strategy for response.

4. Primary and alternate points of contact.

5. Communication and coordination with the Government.

6. Process to achieve recovery and resumption of full service.

7. Approach to recruitment and hiring of personnel (i.e., temporary labor) on short notice.

8. Assessment of the local labor market and the Contractor’s ability to hire qualified personnel.

9. Process to be used to hire personnel to include timing of offers, length the offer remains open, any contingencies and start dates. Critical skills and transactional systems knowledge required to maintain performance and contingency for immediate loss of skills and knowledge.

10. Development of a contingent workforce (both management and labor) that has the requisite knowledge, skills, abilities, and applicable licenses and qualifications to perform the workload.

11. Strategy for maintaining a trained workforce in Distribution Operations, DSS and all other transactional data systems required for contingency operations.

12. Strategy for ensuring the contingent workforce is familiar and shall address the Contractor's methodology and processes for assessing the situation, determining the appropriate response, achieving recovery, and meeting performance standards when there is a disruption in normal workload I.A.W.

PWS Paragraph C-1.9.2

1_DATA_ITEM_NO: A004
2_TITLE_OF_DATA_ITEM: Surge, Sustainment, and Disaster Recovery Plan (SSDRP)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.1, Paragraph C-1.9.2
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS:

Tailored to permit contractor's format. Submit electronically

The SSDRP shall be submitted NLT 30 days prior start of full performance and be complimentary to the distribution sites Continuity of Operations (COOP) and Emergency Action (EAP) Plans.

Submit the information identified in the table on page 2 as changes occur to the COOP and EAP or at minimum on a annual basis.

Subsequent submissions shall be submitted when the Contractor updates or revises the SSDRP within 30 calendar days of the change.

Block 7 - Inspection and acceptance requirements:

The KO will review and accept the SSDRP and updates after coordination with COR and J-3 Depot Operations review and comments.

Block 14 - Distribution - Contractor to submit original to Contract Specialist and copy to the COR.

Block I - Approved By - Signature of Government official accepting the Contractor's reporting requirements of this CDRL will be the the KO.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 2
Reset:
2018-10-29T15:47:59-0400
CRUSEY.SHANE.M.1287981151
2019-02-13T13:52:28-0500
POWERS.CULLEN.MARTIN.1093893227

File details come from the government source that posted it. Updated .