ysp5927 Text Box Solicitation SP3300-14-R-0014 Task Order 0001 Specifications
Replace Air Handling Units 52 and 57 Building 54, Bay 1
DLA Distribution Susquehanna PA (DDSP)
Project Specifications
TOC SPECIFICATIONS Defense Distribution Center, Susquehanna Replace AHUs 52 and 57, Building 54, Bay 1 New Cumberland, PA
TABLE OF CONTENTS Page 1 of 2
Replace AHUs 52 and 57, Bldg 54, Bay 1 New Cumberland, PA
TABLE OF CONTENTS
SECTION TITLE
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 45 00.10 20 QUALITY CONTROL FOR MINOR PROJECTS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROL
01 78 00 PROJECT CLOSEOUT
01 78 23 OPERATIONS AND MAINTENANCE DATA
DIVISION 2 – EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 5 - METALS
05 05 23 WELDING, SRUCTURAL
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 22 00 ROOF AND DECK INSULATION
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 9 - FINISHES
09 51 00 ACOUSTICAL TILE
09 90 00 PAINTS AND COATINGS
DIVISION 22 - PLUMBING
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
TOC SPECIFICATIONS Defense Distribution Center, Susquehanna Replace AHUs 52 and 57, Building 54, Bay 1 New Cumberland, PA
TABLE OF CONTENTS Page 2 of 2
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 05 93 TESTING, ADJUSTING, AND BALANCING
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 31 13.00 40 METAL DUCTS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 00.00 10 MCC’S, SWITCHBOARDS, PANELS
-- END OF TABLE OF CONTENTS --
TOC SPECIFICATION Defense Distribution Center, Susquehanna
SECTION 01 11 00 – Summary of Work Page 1 of 7
SECTION 01 11 00
SUMMARY OF WORK
08/11
Table of Contents
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
1.4.2 Location
1.5 WORK RESCHEDULING
1.6 PROJECT ENVIRONMENTAL GOALS
1.6.2 Independent Verification
1.7 OCCUPANCY OF PREMISES
1.8 EXISTING WORK
1.9 ON-SITE PERMITS
1.9.1 Utility Outage Requests and Utility Connection Requests
1.9.2 Welding, and Burning Permits
1.10 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
1.11 SALVAGE MATERIAL AND EQUIPMENT
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 11 00 – Summary of Work Page 2 of 7
GENERAL PART 1
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the
Performance of Buildings
GREEN BUILDING INITIATIVE (GBI)
Green Globes (2004) Green Globes(tm) US Green Building Rating System
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New
Construction Rating System
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 01 11 00 – Summary of Work Page 3 of 7
Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.
Submit the following items to the Contracting Officer:
Utility Outage Requests; G Utility Connection Requests; G Construction Sequence; G Hot Work Permits; G
SD-07 Certificates
Energy Performance Rating; G
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
The work includes individual projects as described in the Request for Proposal (RFP), and individual projects (as issued by Task Order) under the awarded Task Order Contract, and incidental related work.
1.4.2 Location
The work shall be located at Defense Distribution Center Susquehanna in New Cumberland, PA. Refer to the Contract Drawings provided in the RFP and individual projects (as issued by Task Order) for specific location(s) on site for the work.
1.5 WORK RESCHEDULING
Normal duty hours for work shall be from 0700 to 1530, Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer no less than 7 calendar days in advance of the proposed work period.
Additionally, work that will impact existing employee workspaces, vehicle travel routes or parking areas, material storage areas, etc. shall require a minimum additional advance notification not less than (5) working days in advance of the proposed activities. Coordinate all activities through the Contracting Officer.
1.6 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
SECTION 01 11 00 – Summary of Work Page 4 of 7
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended. Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.6.2 Independent Verification
1.6.2.1 US Green Building Council (USGBC) - LEED(tm) Rating System
Provide work consistent with USGBC LEED BD&C(tm) (current version), level silver requirements.
1.6.2.2 EPA Energy Performance Rating
Provide work consistent with drawings in order to meet Energy Star in accordance with design.
1.7 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, the Contractor shall arrange with the Contracting Officer Representative (COR) a Construction Sequence detailing the sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways required to successfully execute the work. This sequence shall be provided in writing and shall be approved by the COR prior to the start of any work.
1.8 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer.
At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.9 ON-SITE PERMITS
SECTION 01 11 00 – Summary of Work Page 5 of 7
1.9.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer at least 72 hours prior to starting excavation work. Contractor is responsible for marking and verifying the location of all utilities. Damage to existing utilities shall be repaired at the contractor’s expense.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed but indicated in locations to be transversed by piping, ducts, and other new work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the execution of work that affect existing systems shall be arranged for through the COR at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends. Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.
Requests for utility outages and connections shall be made in writing to the COR at least 7 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.9.2 Welding, and Burning Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
Burning Permits N/A - Not Permitted N/A
Welding Permits 3 working days prior to the work Hot Work Permit
(attached) Issued by Fire Department
Permits shall be posted at a conspicuous location in the construction area. Burning of trash or rubbish is not permitted on project site.
1.10 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Unless otherwise notified by the Contracting Officer, the Contractor, with his own forces, shall transport all Government furnished equipment / materials described in the Task Order.
The equipment/materials will be transported from the Government storage area to the work site indicated on the Task Order.
1.11 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the COR or the contract documents to be salvaged shall remain the property of the Government. The salvaged property shall be segregated, itemized, delivered, SECTION 01 11 00 – Summary of Work Page 6 of 7 and off-loaded at the Government designated storage area located on the Defense Distribution Center Susquehanna site.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until receipt and acceptance of salvage material by the COR. Salvaged material under the Contractor’s control that is damaged prior to turnover to the Government shall be replaced by the Contractor at Contractor’s expense.
PRODUCTS PART 2
Not Used
EXECUTION PART 3
Not used.
-- End of Section --
SECTION 01 11 00 – Summary of Work Page 7 of 7
Hot Work Permit
01 14 00, Work Restrictions Page 1 of 10
SECTION 01 14 00
WORK RESTRICTIONS
11/11
Table of Contents
GENERAL ..................................................................................................................... 2 PART 1
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SPECIAL SCHEDULING REQUIREMENTS
1.3.1 Materials and Equipment Required Prior to Work
1.3.2 Facility Operations
1.3.3 Interruptions to Activity Services
1.3.4 Special Scheduling and Work Requirements
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
1.4.2 Working Hours
1.4.3 Work Outside Regular Hours
1.4.4 Occupied and Existing Buildings
1.4.5 Utility Cutovers and Interruptions
PRODUCTS ................................................................................................................... 7 PART 2
EXECUTION ................................................................................................................. 7 PART 3
01 14 00, Work Restrictions Page 2 of 10
SECTION 01 14 00
WORK RESTRICTIONS
GENERAL PART 1
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
Defense Logistics Agency
DLA Physical Security Manual
Defense Distribution Center Susquehanna – Installation Access Policy
Defense Distribution Center Susquehanna – Image Capturing Device Policy
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G Completed DLA Form 1818 Visit Notification (attached); G Camera Pass Request Form (attached); G
1.3 SPECIAL SCHEDULING REQUIREMENTS
1.3.1 Materials and Equipment Required Prior to Work
Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work. Specific items of work to which this requirement applies include:
a. Air Handling Units.
b. New structural steel.
c. New roofing material to match existing.
d. Insulation for ductwork and roof curb.
e. New ceiling tile for office area ceilings affected by AHU replacements.
1.3.2 Facility Operations
01 14 00, Work Restrictions Page 3 of 10
Building 54, Bay 1 office area will remain in operation during the entire construction period.
The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
1.3.3 Interruptions to Activity Services
Permission to interrupt any Activity roads, railroads, and/or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3.4 Special Scheduling and Work Requirements
The work under this Contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the Construction Schedule each factor which constitutes a potential interruption to operations.
a. The Installation will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any activity roads, storage areas, parking areas and/or utility services shall be requested in writing a minimum of (7) calendar days prior to the desired date of interruption.
c. The work under this Contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the Construction Schedule each factor which constitutes a potential interruption to operations.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the activity become familiar with and obey activity regulations including Safety, Fire, Traffic and Security Regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials should be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear Hard Hats, Safety Shoes and Eye Protection at all times in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for proper identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Identification Badges and Installation Access
01 14 00, Work Restrictions Page 4 of 10
a. Contractor ID Badges
All badges are the property of the United States government. Badges must be displayed at all times while on the installation unless prohibited by safety concerns. Badges will not be photographed or copied and will not be displayed off the installation. Any lost or stolen badges will be reported to the COR and Installation Security immediately. The Contractor will ensure that all badges are returned to the Pass and ID office upon the termination of the contract or individual employees.
All persons, with the exception of delivery truck drivers and persons possessing valid Government Common Access Cards (CACs), entering the Installation must obtain an Identification Badge from DDSP Security, Pass and ID. All contractors will receive a badge for the duration of the contract. The construction contractor shall follow the below procedures to obtain and renew Identification Badges for all direct hire and subcontractor employees and visitors:
(1) Complete a DLA Form 1818 Visit Notification, available from http://www.dla.mil/dss/forms/fillables/DL1818.pdf. Complete ALL portions of the Form 1818. All questions regarding completion of Form 1818 shall be directed to the COR.
(2) Forward Form 1818 to the COR via email. The COR will in turn forward Form 1818(s) to the Installation Security Pass & ID office.
(3) Contractor personnel shall enter the Installation at Post #3 off of Old Depot Road and go to the Pass & ID Building located just inside the Installation Entrance.
Personnel shall acquire their ID Badges at the Pass & ID Building. Contractor personnel that have not submitted Form 1818(s) through the COR will not be issued ID Badges or granted access to the Installation.
b. Installation Access
(1) Privately Owned Vehicles (POVs)
POVs transporting Contractor personnel may enter the Installation via Post 3 off Old Depot Road, provided they are not transporting tools, equipment, or supplies.
All persons in Contractor vehicles are required to show ID Badges at the ID Check Stations. All vehicles entering the Installation at Post 3 are subject to random vehicle search procedures.
(2) Contractor and Construction Vehicles
Contractors driving any form of vehicle designed to carry tools, equipment, supplies, or materials necessary for the work are required to enter the installation via Post 4 off of Old York Road (at Normandy Drive). All persons in Contractor vehicles are required to show ID Badges at the Vehicle Search Area. All vehicles entering the Installation at Post 4 are subject to vehicle search procedures.
01 14 00, Work Restrictions Page 5 of 10
(3) Material Deliveries
All contractor deliveries shall enter the Installation at Post 4. To avoid delays at Post 4, deliveries should be scheduled to arrive after 8:00 AM whenever possible.
The Construction Contractor shall follow the following procedure for all deliveries (including pick-ups at the construction site):
After being processed by DLA Police in the Post 4 Vehicle Search Area, Delivery Vehicles are directed to proceed onto the Installation and into the vehicle holding area where they must wait for an authorized member of the Construction Contractor to escort them from Post 4 to the construction site. The Construction Contractor’s Site Supervisor is responsible for coordinating all material deliveries and providing all required vehicle escorts. Upon completion of material delivery, the Construction Contractor is responsible for escorting the delivery vehicle back to Post 4 to exit the Installation.
1.4.1.3 Photographs
Cameras may be possessed and operated by authorized persons only. To obtain a Camera Pass, the Contractor must provide the following information to the COR:
a. Camera Pass Request Form (attached);
If MATOC, request duration until end of current option year and explain that they are under contract with us for numerous ongoing projects.
The COR will validate the Contractor’s request information and forward the Camera Pass Request Form to Installation Security. If approved, the COR will notify the Contractor that a Camera Pass can be obtained at the Pass & ID Building. Camera Pass requests shall be kept to a minimum and limited to Prime Contractor personnel only. A Camera Pass must be in the possession of the person taking the photographs at all times and presented whenever requested by Government personnel. Failure to maintain, or loss of Camera Passes must be reported to COR for action, and Installation Security will be notified as necessary. Personnel found to be in the possession of photographic equipment without the proper documentation will have their equipment confiscated, contents reviewed and returned upon their departure of the Installation or other arrangements will be made.
b. Only Digital Still Cameras should be used. Cell phones are NOT authorized under any circumstances for taking photographs.
All images captured on digital cameras must be reviewed by Installation Security prior to removing the Camera from the Installation. Cameras must be brought to the Public Safety Facility, Building 911, on J Avenue at the end of each work day and surrendered to Installation Security Staff for review. Any images found to contain images of unauthorized items or areas will be deleted prior to return to Contractor personnel.
c. Do not take pictures of Contractor or Government Employee ID Badges, identification
01 14 00, Work Restrictions Page 6 of 10 signs, certain stored materials (as clarified by the COR), security hardware, fire suppression systems, utilities fixtures, or other areas, facilities, or improvements unless images of such are specifically required by the project.
1.4.1.4 Employee List
The Contractor must provide to the Contracting Officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract
1.4.1.5 Radioactive Materials and Equipment
All testing equipment, containing a radioactive source, must be operated in accordance with an approved radioactive equipment plan. This plan must be submitted to the Contracting Officer and approved prior to bringing the equipment unto the Installation. A different radioactive equipment plan will be required for each different type of equipment, type of radioactive source, or size of radioactive source. A data sheet of for each piece of new radioactive equipment must be submitted to the Contracting Officer. The data sheet must contain the following information:
a. Name of equipment.
b. Name and address of equipment manufacturer.
c. Type and size of radiation source.
d. The location of the installed radioactive equipment (i.e. building no., floor, code/shop area).
1.4.2 Working Hours
Due to the overhead work required for this project, this project cannot be completed during normal working hours. Regular working hours consist of an 8 1/2 hour period, between 7 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval. Make application 7 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. The Contractor shall coordinate its efforts to make utility cutovers outside normal working hours or on Saturdays, Sundays, and Government holidays to the greatest extent possible to minimize impact to existing operations unless directed otherwise.
1.4.4 Occupied and Existing Buildings
01 14 00, Work Restrictions Page 7 of 10
The Contractor may be working in and around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the work area during the construction period.
The Contractor shall relocate movable furniture away from the Contractor's working areas required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.
1.4.5 Utility Cutovers and Interruptions
1.4.5.1 Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
1.4.5.2 Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
1.4.5.3 Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."
1.4.5.4 Operation of Station Utilities: The Contractor shall be responsible for the operation of control devices in the Installation Utilities System, including water, sewer, electrical, and steam services. The Government will provide supervision and direct which control devices to operate. The Contractor shall not operate control devices except when the COR is present. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.
PRODUCTS PART 2
Not Used
EXECUTION PART 3
Not Used
01 14 00, Work Restrictions Page 8 of 10
DLA Form 1818
01 14 00, Work Restrictions Page 9 of 10
Instructions for DLA Form 1818
01 14 00, Work Restrictions Page 10 of 10
Section 01 32 01.00 10, Project Schedule Page 1 of 18
SECTION 01 32 01.00 10
PROJECT SCHEDULE
08/08
Table of Contents
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SCHEDULE PREPARER
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Approved Project Schedule
3.1.2 Schedule Status Reports
3.1.3 Default Terms
3.2 BASIS FOR PAYMENT AND COST LOADING
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Critical Path Method
3.3.2 Level of Detail Required
3.3.3 Scheduled Project Completion and Activity Calendars
3.3.4 Interim Completion Dates
3.3.5 Default Progress Data Disallowed
3.3.6 Out-of-Sequence Progress
3.3.7 Negative Lags and Start to Finish Relationships
3.3.8 Calculation Mode
3.3.9 Milestones
3.4 PROJECT SCHEDULE SUBMISSIONS
3.4.1 Preliminary Project Schedule Submission
3.4.2 Initial Project Schedule Submission
3.4.3 Design Package Schedule Submission
3.4.4 Periodic Schedule Updates
3.4.5 Standard Activity Coding Dictionary
3.5 SUBMISSION REQUIREMENTS
Section 01 32 01.00 10, Project Schedule Page 2 of 18
3.5.1 Data CD's
3.5.2 Narrative Report
3.5.3 Approved Changes Verification
3.5.4 Schedule Reports
3.5.5 Network Diagram
3.6 PERIODIC SCHEDULE UPDATE MEETINGS
3.6.1 Update Submission Following Progress Meeting
3.6.2 Status of Activities
3.7 REQUESTS FOR TIME EXTENSIONS
3.7.1 Justification of Delay
3.7.2 Submission Requirements
3.7.3 Additional Submission Requirements
3.8 DIRECTED CHANGES
3.9 WEEKLY PROGRESS MEETINGS
3.10 OWNERSHIP OF FLOAT
Section 01 32 01.00 10, Project Schedule Page 3 of 18
SECTION 01 32 01.00 10
PROJECT SCHEDULE
GENERAL PART 1
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Schedule; G
1.3 SCHEDULE PREPARER
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating (activity status) and preparation of reports. The authorized representative shall have prior hands-on experience in the development, creation, and maintenance of electronic schedules for projects similar in nature and complexity to this project for a period of no less than 2 years and shall be experienced in the use of the scheduling software that meets the requirements of this specification.
PRODUCTS PART 2
Not Used
EXECUTION PART 3
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to the Contract Clause, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the sequence in which the Contractor proposes to perform the work and dates on which the Contractor contemplates starting and completing all schedule activities. The scheduling of the entire project, including the design (as applicable) and construction sequences, is required. The scheduling of (design and) construction is the responsibility of the Contractor.
Contractor management personnel shall actively participate in its development.
Section 01 32 01.00 10, Project Schedule Page 4 of 18
Subcontractors and suppliers, Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool.
Approved Project Schedule 3.1.1
Use the approved Project Schedule to measure the progress of the work and to aid in evaluating time extensions. Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments. If the Contractor fails to submit any schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
Schedule Status Reports 3.1.2
Provide a Schedule Status Report on at least a monthly basis. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, take steps necessary to improve its progress including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
Default Terms 3.1.3
Failure of the Contractor to comply with the requirements of the Contracting Officer shall be grounds for a determination, by the Contracting Officer, that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of the contract.
3.2 BASIS FOR PAYMENT AND COST LOADING
Use the schedule as the basis for determining contract earnings during each update period and therefore the amount of each progress payment. Lack of an approved schedule update, or qualified scheduling personnel, will result in the inability of the Contracting Officer to evaluate contract earned value for the purposes of payment. Failure of the Contractor to provide all required information will result in the disapproval of the preliminary, initial and subsequent schedule updates. In the event schedule revisions are directed by the Contracting Officer and those revisions have not been included in subsequent revisions or updates, the Contracting Officer may hold retainage up to the maximum allowed by contract, each payment period, until such revisions to the Project Schedule have been made.
Activity cost loading shall be reasonable, as determined by the Contracting Officer. The aggregate value of all activities coded to a contract CLIN shall equal the value of the CLIN on the Schedule.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
Section 01 32 01.00 10, Project Schedule Page 5 of 18
The computer software system utilized to produce and update the Project Schedule shall be capable of meeting all requirements of this specification. Comply with PRIMAVERA P6 - USACE MANDATORY REQUIREMENTS. Failure of the Contractor to meet the requirements of this specification will result in the disapproval of the schedule.
Critical Path Method 3.3.1
Use the Critical Path Method (CPM) of network calculation to generate the Project Schedule. Prepare the Project Schedule using the Precedence Diagram Method (PDM).
Level of Detail Required 3.3.2
Develop the Project Schedule to an appropriate level of detail. Failure to develop the Project Schedule to an appropriate level of detail, as determined by the Contracting Officer, will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.3.2.1 Activity Durations
Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods. Less than 2 percent of all non-procurement activities shall have Original Durations (OD) greater than 20 work days or 30 calendar days.
Procurement activities are defined herein.
3.3.2.2 Design and Permit Activities
Include design and permit activities with the necessary conferences and follow-up actions and design package submission dates. Include the design schedule in the project schedule, showing the sequence of events involved in carrying out the project design tasks within the specific contract period. This shall be at a detailed level of scheduling sufficient to identify all major design tasks, including those that control the flow of work. The schedule shall include review and correction periods associated with each item.
3.3.2.3 Procurement Activities
The schedule must include activities associated with the submittal, approval, procurement, fabrication and delivery of long lead materials, equipment, fabricated assemblies and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days. A typical procurement sequence includes the string of activities: submit, approve, procure, fabricate, and deliver.
3.3.2.4 Mandatory Tasks
The following tasks must be included and properly scheduled:
Submission and approval of O & M manuals. a.
Submission and approval of as-built drawings. b.
Section 01 32 01.00 10, Project Schedule Page 6 of 18
Submission and approval of 1354 data and installed equipment lists. c.
Submission and approval of testing and air balance (TAB). d.
Submission of TAB specialist design review report. e.
Submission and approval of fire protection specialist. f.
Submission and approval of HVAC testing and balancing and Building Commissioning g.
Plan, test data and reports: Prepare a schedule with integrated logic associated for testing and commissioning of building systems. The schedule shall be at a level of detail which identifies activities and integrates specific activity durations and interdependencies of tasks related to all building testing and commissioning of systems. The logic shall be tied to the overall project schedule and it shall be shown that all tasks associated with all building testing and commissioning will be completed prior to submission of building commissioning report and subsequent contract completion. Refer to Figures 1 and 2 as an example of level of detail and associated schedule logic.
Air and water balancing. h.
HVAC commissioning. i.
Controls testing plan submission. j.
Controls testing. k.
Performance Verification testing. l.
Other systems testing, if required. m.
Contractor's pre-final inspection. n.
Correction of punchlist from Contractor's pre-final inspection. o.
Government's pre-final inspection. p.
Correction of punch list from Government's pre-final inspection. q.
Final inspection. r.
3.3.2.5 Government Activities
Show Government and other agency activities that could impact progress. These activities include, but are not limited to: approvals, approvals, design reviews, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.
3.3.2.6 Activity Responsibility Coding (RESP)
Section 01 32 01.00 10, Project Schedule Page 7 of 18
Assign responsibility Code for all activities to the Prime Contractor, Subcontractor or Government agency responsible for performing the activity. Activities coded with a Government Responsibility code include, but are not limited to: Government approvals, Government design reviews, environmental permit approvals by State regulators, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements. Code all activities not coded with a Government Responsibility Code to the Prime Contractor or Subcontractor responsible to perform the work. Activities shall not have more than one Responsibility Code. Examples of acceptable activity code values are:
DOR (for the designer of record); ELEC (for the electrical subcontractor); MECH (for the mechanical subcontractor); and GOVT (for USACE). Unacceptable code values are abbreviations of the names of subcontractors.
3.3.2.7 Activity Work Area Coding
Assign Work Area code to activities based upon the work area in which the activity occurs.
Define work areas based on resource constraints or space constraints that would preclude a resource, such as a particular trade or craft work crew, from working in more than one work area at a time due to restraints on resources or space. Examples of Work Area Coding include different areas within a floor of a building, different floors within a building, and different buildings within a complex of buildings. Activities shall not have more than one Work Area Code. Not all activities are required to be Work Area coded. A lack of Work Area coding will indicate the activity is not resource or space constrained.
3.3.2.8 Contract Changes/Requests for Equitable Adjustment (REA) Coding (MODF)
Assign Activity code to any activity or sequence of activities added to the schedule as a result of a Contract Modification, when approved by the Contracting Officer, with a Contract Changes/REA Code. Key all Code values to the Government's modification numbering system. Any activity or sequence of activities added to the schedule as a result of alleged constructive changes made by the Government may be added to a copy of the current schedule, subject to the approval of the Contracting Officer. Assign Activity codes for these activities with a Contract Changes/REA Code. Key the code values to the Contractor's numbering system. Approval to add these activities does not necessarily mean the Government accepts responsibility and, therefore, liability for such activities and any associated impacts to the schedule, but rather the Government recognizes such activities are appropriately added to the schedule for the purposes of maintaining a realistic and meaningful schedule. Such activities shall not be Responsibility Coded to the Government unless approved. An activity shall not have more than one Contract Changes/REA Code.
3.3.2.9 Contract Line Item (CLIN) Coding (BIDI)
Code all activities to the CLIN on the Contract Line Item Schedule to which the activity belongs. An activity shall not contain more than one CLIN Item Code. CLIN Item code all activities, even when an activity is not cost loaded.
3.3.2.10 Phase of Work Coding (PHAS)
Section 01 32 01.00 10, Project Schedule Page 8 of 18
Assign Phase of Work Code to all activities based upon the phase of work in which the activity occurs. Code activities to either a Design Phase or a Construction Phase. Code fast track design and construction phases proposed by the Contractor to allow filtering and organizing the schedule by fast track design and construction packages. If the contract specifies construction phasing with separately defined performance periods, identify a Construction Phase Code to allow filtering and organizing the schedule accordingly. Each activity shall be identified with a single project phase and have only one Phase of Work code.
3.3.2.11 Category of Work Coding (CATW)
Assign Category of Work Code to all Activities based upon the category of work to which the activity belongs. Category of Work Code must include, but is not limited to: design, design submittal, design reviews, review conferences, permits, construction submittals, construction submittal approvals, Acceptance, Procurement, Fabrication, Delivery, Weather Sensitive Installation, Non-Weather Sensitive Installation, Start-Up, Test and Turnover.
Assign a Category of Work Code to each activity. Each activity shall have only one Category of Work Code.
3.3.2.12 Definable Features of Work Coding (FOW1, FOW2, FOW3)
Assign a Definable Feature of Work Code to appropriate activities based on the definable feature of work to which the activity belongs. Definable Feature of Work is defined in Specification Section 01 45 00.00 10 QUALITY CONTROL. An activity shall not have more than one Definable Feature of Work Code. Not all activities are required to be Definable Feature of Work Coded.
Scheduled Project Completion and Activity Calendars 3.3.3
The schedule interval shall extend from NTP date to the required contract completion date.
The contract completion activity (End Project) shall finish based on the required contract duration in the accepted contract proposal, as adjusted for any approved contract time extensions. The first scheduled work period shall be the day after NTP is received by the Contractor. Schedule activities on a calendar to which the activity logically belongs.
Activities may be assigned to a 7 day calendar when the contract assigns calendar day durations for the activity such as a Government Acceptance activity. If the Contractor intends to perform physical work less than seven days per week, schedule the associated activities on a calendar with non-work periods identified including weekends and holidays.
Assign the Category of Work Code - Weather Sensitive Installation to those activities that are weather sensitive. Original durations must account for anticipated normal adverse weather. The Government will interpret all work periods not identified as non-work periods on each calendar as meaning the Contractor intends to perform work during those periods.
3.3.3.1 Project Start Date
The schedule shall start no earlier than the date on which the NTP was acknowledged.
Include as the first activity in the project schedule an activity called "Start Project"( or NTP).
Section 01 32 01.00 10, Project Schedule Page 9 of 18
The "Start Project" activity shall have an "ES" constraint date equal to the date that the NTP was acknowledged, and a zero day duration.
3.3.3.2 Schedule Constraints and Open Ended Logic
Constrain completion of the last activity in the schedule by the contract completion date.
Schedule calculations shall result in a negative float when the calculated early finish date of the last activity is later than the contract completion date. Include as the last activity in the project schedule an activity called "End Project". The "End Project" activity shall have an "LF" constraint date equal to the contract completion date for the project, and with a zero day duration or by using the "project must finish by" date in the scheduling software. The schedule shall have no constrained dates other than those specified in the contract. The use of artificial float constraints such as "zero fee float" or "zero total float" are typically prohibited. There shall only be 2 open ended activities: Start Project (or NTP) with no predecessor logic and End Project with no successor logic.
3.3.3.3 Early Project Completion
In the event the Preliminary or Initial project schedule calculates an early completion date of the last activity prior to the contract completion date, identify those activities that it intends to accelerate and/or those activities that are scheduled in parallel to support the Contractor's "early" completion. The last activity shall have a late finish constraint equal to the contract completion date and the schedule will calculate positive float. The Government will not approve an early completion schedule with zero float on the longest path. The Government is under no obligation to accelerate activities for which it is responsible to support a proposed early contract completion.
Interim Completion Dates 3.3.4
Constrain contractually specified interim completion dates to show negative float when the calculated early finish date of the last activity in that phase is later than the specified interim completion date.
3.3.4.1 Start Phase
Include as the first activity for a project phase an activity called "Start Phase X" where "X" refers to the phase of work. The "Start Phase X" activity shall have an "ES" constraint date equal to the date on which the NTP was acknowledged, and a zero day duration.
3.3.4.2 End Phase
Include as the last activity for a project phase an activity called "End Phase X" where "X" refers to the phase of work. The "End Phase X" activity shall have an "LF" constraint date equal to the specified completion date for that phase and a zero day duration.
3.3.4.3 Phase "X" Hammock
Section 01 32 01.00 10, Project Schedule Page 10 of 18
Include a hammock type activity for each project phase called "Phase X" where "X" refers to the phase of work. The "Phase X" hammock activity shall be logically tied to the earliest and latest activities in the phase.
Default Progress Data Disallowed 3.3.5
Do not automatically update Actual Start and Finish dates with default mechanisms that may be included in the scheduling software. Activity Actual Start (AS) and Actual Finish (AF) dates assigned during the updating process shall match those dates provided from Contractor Quality Control Reports. Failure of the Contractor to document the AS and AF dates on the Daily Quality Control report for every in-progress or completed activity, and failure to ensure that the data contained on the Daily Quality Control reports is the sole basis for schedule updating shall result in the disapproval of the Contractor's updated schedule and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes. Updating of the percent complete and the remaining duration of any activity shall be independent functions. Disable program features which calculate one of these parameters from the other.
Out-of-Sequence Progress 3.3.6
Activities that have progressed before all preceding logic has been satisfied (Out-of- Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Contracting Officer. Propose logic corrections to eliminate all out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule. Correct out of sequence progress that continues for more than two update cycles by logic revision, as approved by the Contracting Officer.
Negative Lags and Start to Finish Relationships 3.3.7
Lag durations contained in the project schedule shall not have a negative value. Do not use Start to Finish (SF) relationships.
Calculation Mode 3.3.8
Schedule calculations shall retain the logic between predecessors and successors even when the successor activity starts and the predecessor activity has not finished. Software features that in effect sever the tie between predecessor and successor activities when the successor has started and the predecessor logic is not satisfied ("progress override") will not be allowed.
Milestones 3.3.9
The schedule must include milestone activities for each significant project event including but not limited to: milestone activities for each fast track design package released for construction; design complete; foundation/substructure construction complete;
superstructure construction complete; building dry-in or enclosure complete to allow the initiation of finish activities; permanent power complete; and building systems commissioning complete.
Section 01 32 01.00 10, Project Schedule Page 11 of 18
3.4 PROJECT SCHEDULE SUBMISSIONS
Provide the submissions as described below. The data CD, reports, and network diagrams required for each submission are contained in paragraph SUBMISSION REQUIREMENTS.
Preliminary Project Schedule Submission 3.4.1
Submit the Preliminary Project Schedule, defining the Contractor's planned operations for the first 90 calendar days for approval within 15 calendar days after the NTP is acknowledged. The approved Preliminary Project Schedule will be used for payment purposes not to exceed 90 calendar days after NTP.