11. CONTRACT ID CODE OF PAGESAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT rAG~ 3I

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REOUISITION/PURCHASE REO. NO. 15. PROJECT NO. (If applicble) 0003 18-Aug-2011

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODESP3300 IDAKADM

DLA DISTRIBUTION DONNA KAUTZ

ACQUISITION OPERATION J7-AB 717-770-6563 FX 717 770-7591

J AVENUE BUILDING 404 donna.kautz@dla.mil

NEW CUMBERLAND PA 17070 5001

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Codel SA. AMENDMENT OF SOLICIATION NO. (X)

SP3300 11-B-5003X

SB. DATED (SEE ITEM 111

18-Jul-2011 lOA. MODIFICATION OF CONTRACT/ORDER NO.

lOB. DATED (SEE ITEM 111

CODE IFACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[&] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of otfers D is extended, ug lS not extended.

otfers must acknowledge receipt of this amendment prior to the hour and date specified In the solicitation or as amended, by one of the following methods:

(alBy completing items 8 and 15, and returning __l __copies of the amendment; (bl By acknowledging receipt of this amendment on each copy of the offer submitted;

or (cl By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authorityl THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.! SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103{b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authorityl

E. IMPORTANT: Contractor D is not, D is required to sign this document and return ---- copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Page 2.

Except as provided herein all terms and conditions of the document referenced in Item 9A or 10A as heretofore changed, remains unChanged and in full force and effect.

STANDARD FORM 30 (REV. 10-831NSN 7540-01-152-8070

Prescribed by GSA FAR (48 CFAI 53.243Previous edition unusable

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

1 5C. DATE SIGNED

leA. NAME AND TITLE OF CONTRACTING OFFICER !Type or printl

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of Contracting Officer) mailto:donna.kautz@dla.mil

SP3300-11-B-5003

Amendment 0003

Amendment 0003 is hereby incorporated into solicitation SP3300-11-B-5003 and shall become part of any resulting contract.

Amendment 0003 is being issued to provide answers to vendor questions.

Questions/Answers

Question 1: At our walk-thru we saw that all the equipment on roof has lightning protection but there is no mention of it on the drawings or specs.

Is it required?

Answer 1: Yes, lightening protection is required on any new equipment that is being added to the roof.

Question 2: The core sample does not indicate the existing Gypsum sheathing - are we to assume they stopped at the "existing" vapor barrier? - Detail 3 calls for field match of existing sheathing. Just want to make sure that existing sheathing and vapor barrier exists.

If in fact there is no existing vapor barrier or gypsum sheathing; do you still want vapor barrier and sheathing over the areas scheduled for deck replacement?

Answer 2: As mentioned above, No, we do not need to have these items added.

Question 3: The specifications for this project as delivered, however, do not make it clear what fresh air ventilation requirements are required for Bldg. 87, a key element in the solar air heating design for this building. The specified surface area of approximately 4,600 ft2, however, suggests that 20,000 to 30,000 CFM is required in solar pre-heated air for Bldg. 87.

Answer 3: Solar wall requirements are listed on drawing A-202 and total ventilation is listed in the Makeup air unit schedule.

Question 4: The specifications for Bldg 87 also refer to the polycarbonate panel product being promoted by Conserval as a generic design feature, but there is no indication of the purpose of this panel. which in our view would not offer any performance benefit to alternate heating system design.

We would hesitate to offer this particular product, as we are unaware that is has been certified by CSA international or SRCC standards organizations, tested by Exova or recognized by the NREL (National Renewalble Energy Lab, the U.S. Department of Energy's agency for renewable energy and energy efficiency research, development and deployment).

Given that the effectiveness of the panel is undocumented and therefore experimental, could you please provide information on what performance specifications are required that would justify its addition to the project?

Answer 4: The 2 stage (glazed) product has been independently tested by the National Solar Test Facility which is an SRCC (Solar Rating &Certification Corporation) accredited laboratory and shows a 30-35% increase over standard unglazed products. the reference to "see how it works" is to verify that under our actual site conditions we see the claimed increase in efficiency over a standard unglazed product. The product specified is currently installed at multiple sites and is not experimental. The product characteristics for the successful product must be able to

SP3300-11-8-5003

Amendment 0003 produce a 49.4 degree temperature rise at 2CFM/ft2, with a 7.6 MPH wind and 900 watts/m2 radiation.

Question 5: We are aware that Conserval Engineering's top collector solar air heating patent expired several years ago, but we believe that the idea of adding the polycarbonate panel may be one of the Canadian company's current patents.

Can you confirm for us that the supply of the specified non-patented solar-air heating system is open to all qualified suppliers and their certified products, and that - with respect to Conserval's polycarbonate add-on panel - it is not required by the project's mechanical and technical specifications?

Please confirm also that as an uncertified product, the supply of the polycarbonate panel is optional, and not specifically tied in any way to the supply of the solar air heating system itself.

An alternate Air Heating product qualifies for this tender in every respect, including ARRA requirements. In our view, however, requiring the use of an uncertified, proprietary panel in combination with an industry- standard product - for which no proprietary claim exists - could be interpreted as a means of constraining competition in the context of this bid.

Finally, I would like to formally request authorization to substitute Conserval's solar air heating system (and add-on panel) with that of the product designed and developed by an alternate source.

Answer 5: The glazed (2 stage) product system as described above has been certified by an independent testing agency(see question 4 response) and is required where indicated on the drawings or similar products with the same operating characteristics. The use of unglazed (single stage) panels is also open to similar product with the same operating characteristics.

All other terms and conditions remain unchanged.

END OF AMENDMENT 0003