About this file

Amendment 0009

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300-11-B-5003

Amendment 0009

Amendment 0009 is hereby incorporated into solicitation SP3300-11-B-5003 and shall become part of any resulting contract.

Amendment 0009 is being issued to provide an answer to a vendor question and revise drawings M-111, M-112, M-113 & M-114.

Question 1: The controls for the unit heaters call for occupancy sensors, yet none are shown of either the M or E drawings.

Who is to provide them, and how many are needed?

Answer 1: Electric or hot water unit heaters located in sprinkler rooms, electrical rooms, mechanical rooms and utility rooms will be controlled by integrated or locally mounted thermostats and be mounted no higher than 9Ft above the finished floor.

For hot water unit heaters in the bays and corridor of bldg 87 follow the revised specification below and attached drawings.

Revise Specification section 15951 paragraph 3.4.4.2 Unit Heater and Cabinet Unit Heater to:

Contractor shall install DDC to perform this Sequence of Operation and to provide inputs, outputs and alarms as specified.

a. Off-Auto Switch

(1) OFF: With the thermostat/sensor OFF-AUTO switch in the OFF position, the unit heater fans associated with the thermostat will be off.

(2) AUTO: With the thermostat/sensor OFF-AUTO switch in the AUTO position, the space sensor shall control the units in accordance with its Occupancy Mode.

b. Occupancy Modes

(1) Occupied: The unit heater shall be indexed to the occupied mode when the input from the System Scheduler is occupied, local override shall be provided for up 4 hours (adjustable).

(2) Unoccupied: The unit heater shall be in the Unoccupied Mode when the input from the System Scheduler is unoccupied.

c. Safeties: The unit shall run subject to the unit manufacturer's safeties.

d. Space Temperature Control

(1) In the Occupied Mode the fan will energize to maintain space occupied temperature at the configured set point 65F (adjustable).

(2) In the Unoccupied Mode the fan will energize to maintain space unoccupied temperature at the configured set point 55F (adjustable).

All other terms and conditions remain unchanged.

END OF AMENDMENT 0009

ADP21A.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
ADP10.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
ADP1D.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
08330 Overhead Rolling Doors.pdf
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION
1.2.1 Wind Load Requirements
1.2.2 Operational Cycle Life
1.3 SUBMITTALS
1.4 DELIVERY AND STORAGE
1.5 WARRANTY
1.6 OPERATION AND MAINTENANCE MANUALS
PART 2 PRODUCTS
2.1 OVERHEAD ROLLING DOORS
2.1.1 Curtains
2.1.1.1 Insulated Curtains
2.1.2 Endlocks and Windlocks
2.1.3 Bottom Bar
2.1.4 Guides
2.1.5 Barrel
2.1.6 Springs
2.1.7 Brackets
2.1.8 Hoods
2.1.9 Weatherstripping
2.1.10 Slat Openings
2.1.10.1 Vision Lites
2.1.11 Operation
2.1.11.1 Manual Hand-Chain Operation
2.1.11.2 Electric Power Operator With Auxiliary Chain Hoist Operation
2.1.12 Inertia Brake
2.1.13 Locking
2.1.14 Finish

2.2 FIRE DOORS

PART 3 EXECUTION
3.1 INSTALLATION
3.2 FIELD PAINTED FINISH
3.3 TESTS
13080 Seismic Protection.pdf
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
1.2.2 Miscellaneous Equipment and Systems
1.3 SUBMITTALS
1.4 EQUIPMENT REQUIREMENTS
1.4.1 Rigidly Mounted Equipment
1.4.2 Nonrigid or Flexibly-Mounted Equipment
PART 2 PRODUCTS
2.1 BOLTS AND NUTS
2.2 SWAY BRACING
PART 3 EXECUTION
3.1 BRACING
3.2 BUILDING DRIFT
3.3 ANCHOR BOLTS
3.3.1 Cast-In-Place
3.3.2 Expansion or Chemically Bonded Anchors
3.3.2.1 General Testing
3.3.2.2 Torque Wrench Testing
3.3.2.3 Pullout Testing
3.4 RESILIENT VIBRATION ISOLATION DEVICES
3.4.1 Resilient and Spring-Type Vibration Devices
3.4.2 Multidirectional Seismic Snubbers
3.5 SWAY BRACES FOR PIPING
3.5.1 Longitudinal Sway Bracing
3.5.2 Anchor Rods, Angles, and Bars
3.5.3 Maximum Length for Anchor Braces
3.5.4 Bolts
3.6 EQUIPMENT SWAY BRACING
3.6.1 Suspended Equipment and Light Fixtures
3.6.2 Floor or Pad Mounted Equipment
3.6.2.1 Shear Resistance
3.6.2.2 Overturning Resistance
15070 Seismic Control.pdf
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 DEFINITIONS
1.3.1 Decibels dB
1.3.2 Machinery
1.3.3 Manufacturer
1.3.4 Micropascal uPa
1.3.5 Picowatt pW
1.4 SYSTEM DESCRIPTION
1.4.1 Spring Isolator Data
1.4.2 Machinery Manufacturer's Sound Data
1.4.3 Machinery
1.4.4 Machinery Over 300 Pounds
1.4.5 Machinery Vibration Criteria
1.4.6 Machinery Airborne Sound Level Criteria
1.4.6.1 Basic Criteria
1.4.6.2 Sound Data Schedule

1.4.7 Welding

1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Vibration Isolator Procurement
1.6.2 Unitized Machinery Assemblies
PART 2 PRODUCTS
2.1 CORROSION PROTECTION FOR STEEL PARTS
2.2 NEOPRENE
2.3 FLOOR-MOUNTED ISOLATORS
2.3.1 Neoprene Isolation Pads
2.3.2 Neoprene Isolators
2.4 SPRING ISOLATORS AND PROTECTED SPRING ISOLATORS
2.4.1 Springs
2.4.2 Mounting and Adjustment
2.5 SUSPENSION ISOLATORS
2.5.1 Suspension Neoprene Isolators
2.5.2 Suspension Spring Isolators
2.6 MACHINERY BASES, PLATFORMS, RAILS SADDLES
2.7 INERTIA BASES
2.8 FLEXIBLE CONNECTORS FOR PIPING
2.8.1 Elastomeric Flexible Connectors
2.8.2 Metal Flexible Connectors
2.9 FLEXIBLE DUCT CONNECTORS
2.10 SEISMIC SNUBBERS FOR EQUIPMENT
2.11 PIPE GUIDES
2.12 THRUST RESTRAINTS
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Vibration and Noise Isolation Components
3.1.2 Suspension Vibration Isolators
3.1.3 Vertical Stops
3.1.4 Thrust Restraints
3.1.5 Flexible Pipe and Duct Connectors
3.1.6 Seismic Snubbers
3.1.7 Machinery
3.1.7.1 Stability
3.1.7.2 Lateral Motion
3.1.7.3 Unbalanced Machinery
3.1.7.4 Nonrotating Machinery
3.1.7.5 Unitized Machinery Assemblies
3.1.7.6 Roof and Upper Floor Mounted Machinery
3.1.8 Piping
3.1.8.1 Piping Connected to Vibration Isolated Machinery
3.1.8.2 Steam Pressure Reducing Valves
3.1.8.3 Condenser Water
3.1.8.4 Chilled, Hot, and Dual Temperature Piping
3.1.9 Water and Steam Distribution Piping Application
3.1.10 Pipe Hanger and Support Installation
3.1.10.1 Pipe Hangers
3.1.10.2 High Temperatures
3.1.10.3 Valves
3.1.10.4 Machinery Without Flexible Connections
3.1.10.5 Twelve Inch and Larger Pipe
3.1.10.6 Pipe Risers
3.1.10.7 Supports at Base of Pipe Risers
3.1.10.8 Pipe Anchors
3.1.11 High Pressure Ductwork Hanger and Support Installation
3.1.11.1 Duct Risers
3.1.11.2 Supports at Base of Duct Risers
3.1.11.3 Duct Anchors
3.1.12 Equipment Room Sound Isolation
3.1.12.1 Pipe Penetrations
3.1.12.2 Duct Penetrations
3.1.12.3 Ducts Passing Through Equipment Rooms
3.1.13 Machinery Foundations and Subbases
3.1.13.1 Machinery Subbases
3.1.13.2 Common Machinery Foundations
3.1.13.3 Foundation and Subbase Concrete
3.1.13.4 Anchor Bolts and Grout
3.1.14 Inertia Bases
3.1.15 Suspended Machinery Platforms
3.1.16 Electrical Connections
3.1.17 Systems Not To Be Vibration Isolated
3.2 FIELD QUALITY CONTROL
3.2.1 Field Inspections
3.2.2 Spring Isolator Inspection
3.2.3 Tests
3.2.3.1 Equipment Vibration Tests
3.2.3.2 Equipment Sound Level Tests
16070 Seismic Protection.pdf
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SYSTEM DESCRIPTION
1.3.1 General Requirements
1.3.2 Electrical Equipment
1.3.3 Electrical Systems
1.3.4 Contractor Designed Bracing
1.3.5 Conduits Requiring No Special Seismic Restraints
1.4 EQUIPMENT REQUIREMENTS
1.4.1 Rigidly Mounted Equipment
1.4.2 Nonrigid or Flexibly-Mounted Equipment
PART 2 PRODUCTS
2.1 LIGHTING FIXTURE SUPPORTS
2.2 SWAY BRACING MATERIALS
PART 3 EXECUTION
3.1 SWAY BRACES FOR CONDUIT
3.2 LIGHTING FIXTURES IN BUILDINGS
3.2.1 Pendant Fixtures
3.2.2 Ceiling Attached Fixtures
3.2.2.1 Recessed Fluorescent Fixtures
3.2.2.2 Surface-Mounted Fluorescent Fixtures
3.2.3 Assembly Mounted on Outlet Box
3.2.4 Wall-Mounted Emergency Light Unit
3.2.5 Lateral Force
IDCode:
Page: 1
Pages: 2
AmendNo: 0009
EffDate: 02SEP2011
ReqNo:
ProjNo:
IssCode: SP3300
IssuedBy: DLA DISTRIBUTION

ACQUISITION OPERATION J7-AB

J AVENUE BUILDING 404

NEW CUMBERLAND PA 17070-5001

AdmCode: DAKADM
AdminBy: DONNA KAUTZ

717-770-6563 FX 717-770-7591

donna.kautz@dla.mil

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo: SP3300-11-B-5003
AmendDate: 18JUL2011
ModNo:
ModDate: 05 JUL 20
NoCopies: 1
Amended: Yes
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: See Page 2.
SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
SolChgYs: Yes
SolChgNo: Off
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off

File details come from the government source that posted it. Updated .