Notice of Opportunity (NOO) for Energy Savings Performance Contract (ESPC) - Maxwell Air Force Base and Gunter Annex, Alabama
Solicitation number
SP060424R0401
Issued by

About this file

This amendment provides responses to requests for information (RFIs) related to the Notice of Opportunity (NOO) for an Energy Savings Performance Contract (ESPC) at Maxwell Air Force Base and Gunter Annex in Alabama. The Defense Logistics Agency Energy issued the NOO and is seeking an energy service company to conduct energy assessments and implement energy conservation measures across facilities at both installations. The amendment addresses twenty RFIs pertaining to building energy usage details, existing energy infrastructure like meters and controls, planned projects, and clarification on the scope of the microgrid and reference project requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Previous Edition Unusable STANDARD FORM 30 (REV. 11-2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

PAGE OF PAGES

1 4

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

20 OCT 2023

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE SP0604 7. ADMINISTERED BY (If other than Item 6) CODE SP0604

DEFENSE LOGISTICS AGENCY ENERGY

DLA Energy–FEA

8725 JOHN J. KINGMAN ROAD, STP 3950

FORT BELVOIR, VA 22060-6222

BUYER/SYMBOL: Felicia Hightower /DLA Energy-FEAGA

PHONE: (804)638-8728

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

DUNS# Cage Code:

(X) 9A. AMENDMENT OF SOLICITATION NUMBER

Notice of Opportunity/SP0604-24-R-0401

9B. DATED (SEE ITEM 11)

5 OCT 2023

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

Choose an item

10B. DATED (SEE ITEM 13)

Click or tap to enter a date. CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

☒The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ☐ is extended. ☒ is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) See Section G

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A. ☐

☐ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

☐ C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

☐ D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor ☐ is not ☒ is required to sign this document and return 01_ copies to the issuing office

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MAXWELL AIR FORCE BASE, MONTGOMERY, AL NOTICE OF OPPORTUNITY-SP0604-24-R-0401

Amendment 0002 addresses RFI’s 01-16 for solicitation SP0604-24-R-0401 received from industry.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Charlene B. Woods

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

SP0604-24-R-0401

Amendment 0002

FIRST: The following RFIs have been received from industry for solicitation SP0604-24-R-0401 and are addressed by the Government:

RFI 01: Which buildings in Attachment 1 "Facilities" tab are in Maxwell AFB and which are in Gunter Annex?

RFI 01 RESPONSE: Building numbers with a “G” at the beginning are located on Gunter Annex.

RFI 02: What are the general occupancy rates and schedules for building types listed in the "Facilities" tab in Attachment 1?

RFI 02 RESPONSE: The information requested is not readily available, and due to the quantity of facilities in the NOO cannot be obtained in a reasonable timeframe. The information request can generally be obtained during the IGA phase of the project.

RFI 03:Are there demand charges in the electric billing? Please provide demand data if possible.

RFI 03 RESPONSE: No. Maxwell – ~15,264 KW Gunter-Annex - ~8,004 KW

RFI 04: What is the total electrical load of each Maxwell AFB and Gunter Annex in terms of annual peak kW for a typical year?

RFI 04 RESPONSE: Maxwell – ~15,264 KW Gunter-Annex - ~8,004 KW

RFI 05: Can the Government provide gas and electricity data by building where available?

RFI 05 RESPONSE: The information requested is currently not available and/or not available for dissemination at this time.

RFI 06: Are electric meters installed at any buildings at Maxwell of Gunter Annex? Is there a working centralized submetering system in place?

RFI 06 RESPONSE: As part of the Preliminary Assesment, the ESCO shall conduct a meter survey and metering plan, per the AF ESPC Playbook.

RFI 07: Is an emergency back-up electrical generation plant or systems on site? Are there already identified critical loads being fed by existing generation assets?

RFI 07 RESPONSE: Critical facilities requiring generators are present on the installations per AF guidance documents.

RFI 08: Are there central heating water or chilled water plants and associated distribution systems serving the facility?

RFI 08 RESPONSE: There are central chilled water plants.

RFI 09: Please indicate predominant types of mechanical equipment on installation, including equipment age, condition, and efficiency. For example, are there building based packaged HVAC units, air-cooled or water-cooled chiller systems, gas-fired hot water boilers, etc.?

RFI 09 RESPONSE: The information requested is not readily available, and due to the

RFI 10: Are any major equipment replacement projects planned?

RFI 10 RESPONSE: A review of the existing Repair, Replacement, and Moderation projects planned by the Base can be reviewed/discussed during the PA/IGA phases of the project.

RFI 11: Is there a central EMCS with an ATO (Authority to Operate) at either Maxwell AFB or Gunter Annex?

RFI 11 RESPONSE: Yes. Both Maxwell and Gunter-Annex. They are on COINE.

RFI 12: If there is an EMCS, what equipment does it control and does it turn equipment on and off? What is the status of the EMCS. Operational, failed, needs replacement, etc.

RFI 12 RESPONSE: The EMCS typically controls HVAC equipment. The EMCS does turn the equipment on and off. The EMCS is operational. There are many buildings that need an EMCS upgrade due to End of Life components.

RFI 13: If there is an EMCS, please provide sequence of operations for buildings currently in place.

RFI 13 RESPONSE: The information requested is not readily available, and due to the

RFI 14: Please provide information on compressed air plants and systems - is there a central compressed air plant serving multiple buildings? Or are there compressed air systems in separate buildings?

RFI 14 RESPONSE: There aren’t any central compressed air plants. There are some compressed air systems.

RFI 15: Please describe lighting technologies installed and if lighting is from fluorescent or LED technologies. Are lighting controls installed in buildings?

RFI 15 RESPONSE: There are a variety of lighting technologies present (LED, fluorescent, incandescent, etc.) along with a variety of control systems for interior and exterior.

RFI 16: Are there steam systems installed on site?

RFI 16 RESPONSE: There are a few steam systems.

RFI 17: Can the government please clarify and add more specificity to what is meant by building monitoring and controls, i.e. can that be interpreted to mean building energy submetering and/or BAS expansion?

RFI 17 RESPONSE: Building monitoring and controls relates to EMCS/BAS type ECMs.

RFI 18: Can the government please elaborate on the UESC project presented in the data sent with this ESPC Task Order? Specifically, we would like to know if this stated UESC project scope is happening concurrently with this planned ESPC, or if scope will be complete by the time this ESPC commences.

RFI 18 RESPONSE: UESC project is in performance phase which is expected to reach full term in Mid-2026. The Government is looking to include the UESC facilities within the new ESPC project if timelines correlate (i.e. ESPC Award / Expiration of UESC).

RFI 19: Can the government please clarify what critical loads and operational requirements would be supported and required by the microgrid?

RFI 19 RESPONSE: Generally the critical loads would relate to facilities and facility infrastructure, higher fidelity should/will be developed during the IGA portion of the project.

RFI 20: Can the government please clarify if ESCOs may reference non-ESPC/UESC energy projects if they are relevant to the scope of this NOO?

RFI 20 RESPONSE: Non-ESPC/UESC projects are not acceptable. The NOO requests references illustrating the ESCO’s past performance as the prime contractor or prime subcontractor on any ESPC or Utility Energy Service Contracting (UESC) project.

SECOND: All other terms and conditions remain as previously stated.

END OF AMENDMENT