Attachment_3_-_Hood_Price_Proposal_Worksheets.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
South East Environmental assessment, remediation, and emergency response services
Solicitation number
SP0600-14-R-0504
Issued by

About this file

FT. HOOD PRICE PROPOSAL WORKSHEET - UPDATED

View the file

Other files

File Type Posted
Amd_0008.pdf PDF
14R0504_Amd_0007.pdf PDF
Amd_0006.doc DOC document
Attachment_3_-_Hunter_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
0005.pdf PDF
0004.pdf PDF
0003.pdf PDF
0002.pdf PDF
0001.pdf PDF
Attachment_1_-_Performance_Work_Statement.pdf PDF
Attachment_3_-_Hood_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
SP060014R0504_Solicitation.pdf PDF
Attachment_4_-_Wage_Determination_2005-2523_Rev13_Texas.pdf PDF
Attachment_6_-_Sample_Scenario.pdf PDF
Attachment_4_-_Wage_Determination_2005-2141_Rev14_Georgia.pdf PDF
Attachment_5_-_Past_Performance_Questionnaire.xlsx XLSX spreadsheet
Attachment_3_-_Hunter_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
Attachment_2_-_52.212_-3.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ft. Hood

NOTE: Total estimate for each CLIN is for the full five-year term of the contract. Period of performance. June 1, 2014 through May 31, 2019

CLINReference #ServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
00010001Lump Sum price for work plan2$ - 0
00010002Unit Price per hour in excess of those included in work plan40$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
00010003Price per unit (10 points/unit) - 4 feet depth1$ - 0
00010004Price per unit (10 points/unit) - 14 feet depth1$ - 0
00010005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
00010006Price per unit (10,000 linear feet) to include in report of findings1$ - 0
0001Locate, install, and sample soil borings IAW Task 4 of the PWS
00010007Price per boring up to 10 feet5$ - 0
00010008Cost per foot from 11 to 20 feet20$ - 0
00010009Cost per foot 21 to 60 feet1$ - 0
00010010Cost per foot 61 to 150 feet1$ - 0
00010011Mobilization cost for soil boring1$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
00010012Price per 2" Monitoring Well up to 10 feet2$ - 0
00010013Cost per foot of 2" monitoring well from 11 to 20 feet160$ - 0
00010014Cost per foot of 2" monitoring well from 21 to 60 feet40$ - 0
00010015Cost per foot of 2" monitoring well from 61 to 150 feet1$ - 0
00010016Price per 4" monitoring well up to 10 feet1$ - 0
00010017Cost per foot of 4" monitoring well from 11 to 20 feet1$ - 0
00010018Cost per foot of 4" monitoring well from 21 to 60 feet1$ - 0
00010019Cost per foot of 4" monitoring well from 61 to150 feet1$ - 0
00010020Cost per foot to Close/Decommission 2” dia. well200$ - 0
00010021Cost per foot to Close/Decommission 4” dia. well1$ - 0
00010022Mobilization cost for monitoring well installation2$ - 0
Conduct well development IAW Task 6 of the PWS
00010023Price for well development2$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
00010024Cost per unit of DPT (5 bores per unit)10$ - 0
00010025Mobilization for DPT Testing1$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
00010026Price of (10 soil borings/unit)1$ - 0
0001Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
000100276010 (Individual metal)1$ - 0
000100286020 (Individual metal)1$ - 0
000100297470 (Mercury)1$ - 0
000100308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)1$ - 0
000100318015 (TPH as Gasoline [C6-12])1$ - 0
000100328021 (Aromatic Volatile Organic Compounds)1$ - 0
000100338041 (Phenols)1$ - 0
000100348081 (Organochlorine Pesticides)1$ - 0
000100358121 (Chlorinated Hydrocarbons)1$ - 0
000100368151 (Chlorinated Herbicides)1$ - 0
000100378260 (Full List Volatile Organic Compounds)25$ - 0
000100388260 (BTEX/MTBE/Naphthalene)25$ - 0
000100398270 (Full list Semi-Volatile Organic Compounds)1$ - 0
000100408270-SIM (Polyaromatic Hydrocarbons)25$ - 0
000100418310 (Polyaromatic Hydrocarbons)1$ - 0
000100428440 (Total Petroleum Hydrocarbons)1$ - 0
00010043601 (Prugeable Halocarbons)1$ - 0
00010044602 (Purgeable Aromatics)1$ - 0
00010045604 (Phenols)1$ - 0
00010046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
00010047610 (Polynuclear Aromatic Hydrocarbons)1$ - 0
00010048612 (Chlorinated Hydrocarbons)1$ - 0
00010049624 (Purgeables)1$ - 0
00010050625 (Semivolatile Organic Compounds)1$ - 0
00010051TCLP Metals1$ - 0
000100529045 (pH)1$ - 0
000100531010 (Ignitability)1$ - 0
00010054CCR Title 22 Metals (6010/7470)1$ - 0
000100559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
000100569023 (Total Organic Halides)1$ - 0
000100579030 or SM 4500-S (Sulfide)1$ - 0
00010058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
00010059SM 2320 (Alkalinity)1$ - 0
000100605520B (Oil & Grease)1$ - 0
000100612130 (Turbidity)1$ - 0
000100622540 (Total Suspended Solids & Seatable Solids)1$ - 0
000100635540 (Surfactant)1$ - 0
000100645210 (BOD)1$ - 0
00010065TO-151$ - 0
00010066Fixed Gases1$ - 0
00010067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
00010068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
00010069Price per 6" recovery well from 11 to 20 Feet1$ - 0
00010070Price per 6" recovery well from 21 to 60 Feet1$ - 0
00010071Price per 6" recovery well from 61 to 120 Feet1$ - 0
00010072Mobilization cost for 6" recovery well1$ - 0
00010073Monthly price for 6" recovery well system O&M1$ - 0
00010074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
00010075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
00010076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
00010077Lump sum price for pump test1$ - 0
0
00010078Lump sum price for annual monitoring and reporting11$ 1.00
Report preparation, duplication, and distribution IAW Task 13 of the PWS
00010079Lump sum price for report preparation, duplication, and distribution5$ - 0
00010080Unit price per hour in excess hours for report preparation800$ - 0
Miscellaneous services IAW Task 14 of the PWS
00010081Project Manager price per hour400$ - 0
00010082Engineer I price per hour40$ - 0
00010083Engineer II price per hour80$ - 0
00010084Engineer III price per hour80$ - 0
00010085Chemist price per hour50$ - 0
00010086Environmental Scientist I price per hour40$ - 0
00010087Environmental Scientist II price per hour20$ - 0
00010088Environmental Scientist III price per hour100$ - 0
00010089Geologist I price per hour40$ - 0
00010090Geologist II price per hour40$ - 0
00010091Geologist III price per hour200$ - 0
00010092Hydrogeologist I price per hour40$ - 0
00010093Hydrogeologist II price per hour40$ - 0
00010094Hydrogeologist III price per hour40$ - 0
00010095Toxicologist I price per hour1$ - 0
00010096Toxicologist II price per hour1$ - 0
00010097Toxicologist III price per hour40$ - 0
00010098Drafter price per hour50$ - 0
00010099Traffic Control Engineer price per hour20$ - 0
00010100Cost Accountant price per hour100$ - 0
00010101Secretary price per hour1$ - 0
00010102Buyer1$ - 0
00010103Site Labor Foreman price per hour100$ - 0
00010104Remediation System Operator price per hour1$ - 0
00010105Heavy Equipment Operator price per hour80$ - 0
00010106Laborer price per hour80$ - 0
00010107Drill Rig Operator price per hour80$ - 0
00010108Environmental Technician price per hour80$ - 0
00010109Utility Truck price per day20$ - 0
0001011002/Explosimeter price per day5$ - 0
00010111Groundwater Sampling Pump price per day5$ - 0
00010112Flame Ionization OCA price per day5$ - 0
00010113Air Velocity Meter price per day1$ - 0
00010114Field GC price per day5$ - 0
00010115Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum25$ - 0
00010116Furnish and fill with soil roll off bin, price per bin1$ - 0
00010117Shipping of soil and water samples for analytical testing price per 25lb shipping container5$ - 0
00010118Disposable Bailers price per unit1$ - 0
00010119Tedlar Bags price per dozen1$ - 0
00010120Pickup Truck (1/2 ton) price per day10$ - 0
00010121Air Compressor (7 cfm) price per day5$ - 0
00010122Generator (4000 watt) price per day5$ - 0
00010123CAD Equipment Use Charge price per day5$ - 0
00010124Photoionization Detector price per day1$ - 0
00010125Groundwater Multimeter price per day5$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
00010126Percent mark-up for overhead and profit
Background Review IAW Task 16
00010127Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ 1.00

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level.

Solicitation No. SP0600-14-R-0504 Price Proposal Worksheet Location: DFSP Ft. Hood, TX

&P

File details come from the government source that posted it. Updated .