0001.pdf
PDF 244 KB Posted
- Solicitation number
- SP0600-14-R-0504
- Issued by
-
Defense Logistics Agency Energy
About this file
SP060014R0504 AMD 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd_0008.pdf | ||
| 14R0504_Amd_0007.pdf | ||
| Amd_0006.doc | DOC document | |
| Attachment_3_-_Hood_Price_Proposal_Worksheets.xlsx | XLSX spreadsheet | |
| Attachment_3_-_Hunter_Price_Proposal_Worksheets.xlsx | XLSX spreadsheet | |
| 0005.pdf | ||
| 0004.pdf | ||
| 0003.pdf | ||
| 0002.pdf | ||
| Attachment_1_-_Performance_Work_Statement.pdf | ||
| Attachment_3_-_Hood_Price_Proposal_Worksheets.xlsx | XLSX spreadsheet | |
| SP060014R0504_Solicitation.pdf | ||
| Attachment_4_-_Wage_Determination_2005-2523_Rev13_Texas.pdf | ||
| Attachment_6_-_Sample_Scenario.pdf | ||
| Attachment_4_-_Wage_Determination_2005-2141_Rev14_Georgia.pdf | ||
| Attachment_5_-_Past_Performance_Questionnaire.xlsx | XLSX spreadsheet | |
| Attachment_3_-_Hunter_Price_Proposal_Worksheets.xlsx | XLSX spreadsheet | |
| Attachment_2_-_52.212_-3.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE J
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
November 1, 2013
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Environmental Doc. Svcs.
6. ISSUED BY CODE
SP0600 7. ADMINISTERED BY (If other than Item 6) CODE SP0600
DLA Energy
8725 JOHN J. KINGMAN RD., ROOM 2945
FT. BELVOIR, VA 22060-6222
BUYER/SYMBOL – Viki Metzger/DLA Energy-FESAC
PHONE - (703) 767-9326 FAX - (703) 767- 9338
Email –Viki.Metzger@dla.mil 6.1
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
9a. AMENDMENT OF SOLICITATION NO.
SP0600-14-R-0504
X
9b. DATED (SEE ITEM 11)
October 28, 2013
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [] Is not, [X] is required to sign this document and return __one_(1)____ copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. Presolicitation Conferences for this solicitation are scheduled as follows: (SEE CONTINUATION SHEET)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER (Type or print)
YUNYOUNG CHO
15B. NAME OF CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C.DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Amendment 0001
Fort Hood, TX
Wednesday, 6 November 2013 8:30 – 11:00 a.m. CST
Building 4622, Engineer Drive, Ft. Hood, TX 76544
Directions from Killeen TX:
On hwy 190 west, come to the main gate visitors center on TJ Mill’s road. The visitor center is on the left. To get a pass for one day proof of insurance, registration or rental agreement and driver’s license are required.
After receiving the pass go back over the bridge and back out the gate stay to your right and continue west on
HWY 190 to the next gate stay to your right it reads 79th street show the guards the pass and ID and proceed to the first street to the right and the building will be on the right.
(Building 4622)
Hunter Army Air Field, GA
Friday, 8 November 2013 8:30 a.m. EST
Departure Arrival Airfield Control Group (DAACG) Building 7920, Conference Room
Directions :
Access Hunter AAF through Montgomery Gate Building 7920, 1843 North Lightning Road, Hunter Army Airfield, GA 31409
Valid photo identification is required to gain access.
B. The Performance Work Statement is revised by adding the following paragraph j. under SPECIAL NOTES:
j. To assure continuity between the Facility, the Contractor’s home office, and DLA Energy, the Contractor shall employ during the life of this contract a Program Manager who can make decisions concerning this contract: who has a complete understanding of the terms and conditions of this contract; and who has experience in the environmental assessment, environmental remediation, and emergency response.
C. The solicitation is revised by adding following two FAR clauses:
52.223-2 Affirmative Procurement of Biobased Products Under Service And Construction
Contracts (Sep 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are
United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR
3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
Amendment 0001
(b) Information about this requirement and these products is available at http://www.biopreferred.gov .
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov , with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report not later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
(End of clause)
52.242-15 -- Stop-Work Order (Aug. 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the
Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the
Contracting Officer shall either --
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for
Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting
Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the
Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(End of Clause) http://www.biopreferred.gov/ http://www.sam.gov/
File details come from the government source that posted it. Updated .