Amendment_0005_Final.pdf

PDF 53 KB Posted

Attached to
Ft. Drum Renewable Energy Supply Agreement Federal contract opportunity
Solicitation number
SP0600-13-R-0401
Issued by
Defense Logistics Agency Energy

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Ft. Drum Renewable Energy Supply Agreement, newest first.
File Type Posted
Amendment_0011.pdf PDF
Amendment_0010_Final.pdf PDF
Amendment_0008_SP0600-13-R-0401_Final.docx DOCX document
Amendment_0007.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0007.pdf PDF
Attachment_22_Q A_Round_3.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0006.pdf PDF
Amendment_0006.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0005.pdf PDF
Amendment_0004.pdf PDF
RFI_Attachment_21_03222013.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0004.pdf PDF
Amendment_0003.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0003.pdf PDF
Attachment_20_--Fort_Drum_PPC_Presentation.pdf PDF
Attachment_19_Q A.pdf PDF
DrumPPA_Attachment_10_kWh_Rate_Utility_Payment.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0002.pdf PDF
Amendment_0002.pdf PDF
Attachment_13--CLIN_0002_Pricing.xls XLS spreadsheet
Attachment_15-CLIN_0002_Past_Performance.pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_Amd_0001.pdf PDF
Amendment_0001.pdf PDF
Attachment_17_CLIN_0002_Attestation_Forms.pdf PDF
Attachment_14-CLIN_0002_Technical_Proposal.pdf PDF
Attachment_16_CLIN_0002_Supply_Plan_Submission.pdf PDF
DrumPPA_Attachment_9_-_Past_Performance_Information.pdf PDF
DrumPPA_Attachment_12_Initial_Scope_of_Work_Planning_Package_(ISOWPP)_Environmental_Assessment.pdf PDF
DrumPPA_Attachment_4_Site_Maps.pdf PDF
DrumPPA_Attachment_8_Renewable_Project_Experience_-_Copy.pdf PDF
DrumPPA_Attachment_6_Early_Termination_Fees_Schedule_-_Copy.pdf PDF
DrumPPA_Attachment_4_Site_Maps_(2).pdf PDF
DrumPPA_Attachment_1_Historical_Consumption_usage.xlsx XLSX spreadsheet
DrumPPA_Attachment_11_-_Small_Business_Subcontracting_Plan.pdf PDF
DrumPPA_Attachment_10_kWh_Rate_Utility_Payment.pdf PDF
DrumPPA_Attachment_2_Outgrant_Agreement_(Sample).pdf PDF
Fort_Drum_RFP_SP0600-13-R-0401_final.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

28 Mar 2013

4. REQUISITION/PURCHASE REQ. NO.

SP0600-12-0424

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Defense Logistics Agency Energy 8725 John J. Kingman Road, Suite 4950 Fort Belvoir, VA 22060

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

NO.

SP0600-13-R-0401

9B. DATED (SEE ITEM 11)

December 12, 2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended to

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

John H. Nelson

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

X

X

SP0600-13-R-0401, Amendment 0005 Fort Drum PPA

The following revisions are hereby incorporated into the solicitation and are highlighted in yellow:

Section H

1. Section H.4.2 Availability has hereby been updated to the following.

H.4.2. Availability. The Provider shall maintain a system uptime performance that is in the top 25% of the industry in the United States for the technology being implemented. Provider shall define the BGF availability specification for the BGF.

If at any time the BGF fails to generate and deliver energy in accordance with this section, or a scheduled outage exceeds 7 days, the Provider shall use commercially reasonable efforts to restore the BGF, and to replace the energy requirements in accordance with Section C, Description/specifications/statement of work. Scheduled outages shall not exceed 7 days.

Scheduled outages shall be coordinated through installation personnel and the Contracting Officer at times that minimize the costs to the installation. However, the Provider shall note that the Government desires to maximize the quantity of BGF energy purchased in accordance with Sections C1.3.1 and L5.1.1.

Unless the BGF is down for maintenance, Contractors are required to supply power to one (15 MW, 100,000 MWh annually) or both (28 MW, 147,000 MWh annually) of the Fort Drum substations. If the system is temporarily off line, the utility, National Grid, will deliver power to Fort Drum under a standby agreement, National Grid Tariff Service Classification No 7. The cost of the standby charges shall be borne by the Contractor. Additionally, the contractor will be responsible for the price differential between the contract price in effect at the time of the maintenance and the National Grid supply price.

Section M

2. Section M.3.1.1 Technical Scope has hereby been updated to the following.

M.3.1.1 Subfactor 1 – Technical Scope

Providers who provide sufficient detail to meet the stated requirements within the defined scope of work, to include specific uptime capabilities of their designed BGF, scheduled maintenance and proposed output generation will receive an acceptable rating.

Economic considerations shall include net present value evaluations of offers. Higher quantities, up to maximum specifications and higher levels of availability, will be considered a strength.

File details come from the government source that posted it. Updated .