Amendment_0004.pdf
PDF 54 KB Posted
- Attached to
- Ft. Drum Renewable Energy Supply Agreement Federal contract opportunity
- Solicitation number
- SP0600-13-R-0401
- Issued by
- Defense Logistics Agency Energy
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
22 Mar 2013
4. REQUISITION/PURCHASE REQ. NO.
SP0600-12-0424
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Defense Logistics Agency Energy 8725 John J. Kingman Road, Suite 4950 Fort Belvoir, VA 22060
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
NO.
SP0600-13-R-0401
9B. DATED (SEE ITEM 11)
December 12, 2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended to Friday, April 12, 2013 at, 3:00pm EST
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
John H. Nelson
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
X
X
SP0600-13-R-0401, Amendment 0004 Fort Drum PPA
The following revisions are hereby incorporated into the solicitation and are highlighted in yellow:
SF 1449
1. Block 8 of the SF 1449 has hereby been modified to change the proposal due date to12 April 2013, at 3:00 EST.
Section B
2. Section B.1.3 has been modified to remove the project size limitation of 28 MW.
Section C
3. Section C.1 has been revised to reflect the following:
The Provider shall be responsible for providing all labor, material and capital to install a Biomass Generation Facility (BGF), to include providing all operations and maintenance for the duration of the contract. At a minimum, the BGF shall deliver 100,000 MWh annually. At a maximum, the Government may satisfy all of Fort Drum’s consumption, which for 2011 was 147,000 MWh with a peak demand of 28 MW. Consumption during 2012 was higher than 2011 and growth is expected to continue. The Provider shall provide a transmission interconnection between the Fort Drum North Substation and the South Substation for all interconnections over 15 MW.
4. Section C.1.3.2, Premises. The following sentence has been revised:
The greyfield site offers enough space to meet the biomass feedstock storage, in accordance with Section C.1.3.1, for a biomass plant of 15 MW or greater.
5. Section C.6.1 has been modified to change the scheduled outage period time to 7 days.
Section H
6. Section H.2 has been modified to reflect availability of the BGF system.
Part III-List of Documents, Exhibits, and Other Amendments
Section J-List of Attachments
7. Q & A Round 2 is hereby added.
Part IV-Representations and Instructions Section L-Instructions, Conditions, and Notices to Providers or Respondents
8. Section L.4.2.9 Submission, Modification, Revision, and Withdrawal of Proposals paragraph (d) the last sentence is hereby revised:
Proposals in response to this solicitation will be valid for 120 days (unless a different period is proposed by the Provider).