W Task List.xls

XLS spreadsheet 31 KB Posted

Attached to
Utility Privatization Federal contract opportunity
Solicitation number
SP0600-09-R-0806
Issued by
Defense Logistics Agency Energy

About this file

Water Master Task List

View the file

Other files for this federal contract opportunity

Other files attached to Utility Privatization, newest first.
File Type Posted
2012-05-08 Amd 0009.pdf PDF
2011-04-18 Amd 0008.pdf PDF
2011-04-18 Amd 0007.pdf PDF
2011-02-10 Amd 0006.pdf PDF
Amend 0005.pdf PDF
2009 10 02 Amendment 0005 Solicitation.pdf PDF
Amd 0004.pdf PDF
Minot AFB QA 1.pdf PDF
Amd 0003.pdf PDF
Amd 0002.pdf PDF
Amd 0001.pdf PDF
J42 Bill of Sale.pdf PDF
Amd 0001.doc DOC document
E Task List.xls XLS spreadsheet
J44 —
J1 011209.pdf PDF
J41 Subcontracting Plan.pdf PDF
J43-4 S.pdf PDF
J43-3 W.pdf PDF
J4 011209.pdf PDF
J42 Bill of Sale.pdf PDF
J45 Legislative Authority.pdf PDF
J43-1 E.pdf PDF
J39 Past Perf.pdf PDF
J38 Federal Equivalents.pdf PDF
J40_Example_FP-PPR.pdf PDF
RFP Minot 021209 —
J3 010709.pdf PDF
Synopsis Minot Final 27 Jan 09.doc DOC document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Utilities Master Task List

MASTER TASK LIST
OFFERORS NOTES:
1. This document corresponds to the CFETP.
2. It is not the government user’s intent that an individual course be developed for each listed task. Conversely, it is strongly suggested that the offeror logically group similar-type tasks into a series of course instructional blocks. A typical course instructional block example can be found in Exhibit A.
3. A variety of references may be used to develop course instructional block curriculum (to include identified Air Force standards and reference material). Regardless of the choice, any curriculum developed shall reflect only those approved standards/techniques used throughout the industry. Questions relating to the description of a particular task requirement (to include queries on proposed training standards, methods, and instructional block composition) shall be forwarded to the contracting officer for consultation and clarification.
UTILITIES SYSTEMS
Task #Task Title/Performance ObjectiveAF Standards/ ReferencesStudent Required FrequencyQT Qty/HoursUGT Qty/Hours
TASK #11 - AF OCCUPATIONAL SAFETY AND HEALTH (AFOSH) PROGRAM
11.5.10Task Title: Safety Standards for AFSs, . Confined space entries.AFOSH 91-25; Confined SpacesAnnual7/418/4
Performance Objective: Students will open the access point to an enclosed space, test, and then ventilate the air within that space, re-test the air following ventilation, and then enter the space.
11.5.12 & 11.5.13Task Title: Excavations and shoringAFOSH 91-10; Safety (CE), OSHA 29 CFR 1926 Subpart PAnnual7/418/4
Performance Objective: Given all proper PPE and shoring equipment properly set-up and employ shoring during excavation.
TASK 14 – UTILITIES FUNDAMENTALS
14.4. & 14.5Task Title: Water and wastewater treatmentAFI 1067; Water Systems, Ken Kerri; water & wastewater manualsAnnual7/818/8
Performance Objective: Students will be given the plant or special equipment fundamentals and will perform basic operations such as, but not limited to; backwashing filters, taking/testing samples and equipment maintenance
TASK 15 – WATER SYSTEMS
15.3.1., 15.3.2., 15.3.3., 15.3.4. & 15.3.5.Task Title: Operation of waters systemsAFI 1067; Water Systems, UPC, Ken Kerri; water distribution manualsAnnual7/4018/720
Performance Objective: Familiarize on system with utility maps, inspect, operate and perform maintenance as needed on; wells, booster stations, storage tanks, chemical feeders, pressure regulators, altitude valves and metering equipment.
15.4.1., 15.5.5., 15.5.6. 15.7.2 & 24.2.Task Title: Install, repair, inspect and flow test a fire hydrantAFI 1067; Water Systems, UPC, Ken Kerri; water distribution manualsAnnual7/818/8
Performance Objective: Properly install a fire hydrant, isolation valve, valve box, bridle rods and thrust block. Dissemble/reassemble hydrant components, replace parts as needed to make operational. Familarize maintenance concepts and conduct hydrant flow test.
15.4.2.,Task Title: Tap water mainAFI 1067; Water Systems, UPC, Ken Kerri; water distribution manualsAnnual7/418/8
Performance Objective: Properly size and tap water main, ensure water-tight connection.
15.4., 15.5 & 15.7Task Title: Install, inspect and repair exterior pipeAFI 1067; Water Systems, UPC, Ken Kerri; water distribution manualsAnnual7/418/8
Performance Objective: Properly grade, compact and backfill trench. Ensure approved materials used and all safety and disinfection procedures are followed.