J4 011209.pdf
PDF 319 KB Posted
- Attached to
- Utility Privatization Federal contract opportunity
- Solicitation number
- SP0600-09-R-0806
- Issued by
- Defense Logistics Agency Energy
About this file
J4 Wastewater
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2012-05-08 Amd 0009.pdf | ||
| 2011-04-18 Amd 0008.pdf | ||
| 2011-04-18 Amd 0007.pdf | ||
| 2011-02-10 Amd 0006.pdf | ||
| Amend 0005.pdf | ||
| 2009 10 02 Amendment 0005 Solicitation.pdf | ||
| Amd 0004.pdf | ||
| Minot AFB QA 1.pdf | ||
| Amd 0003.pdf | ||
| Amd 0002.pdf | ||
| Amd 0001.pdf | ||
| J42 Bill of Sale.pdf | ||
| Amd 0001.doc | DOC document | |
| W Task List.xls | XLS spreadsheet | |
| E Task List.xls | XLS spreadsheet | |
| J44 | — | |
| J1 011209.pdf | ||
| J41 Subcontracting Plan.pdf | ||
| J43-4 S.pdf | ||
| J43-3 W.pdf | ||
| J38 Federal Equivalents.pdf | ||
| J40_Example_FP-PPR.pdf | ||
| RFP Minot 021209 | — | |
| J3 010709.pdf | ||
| J42 Bill of Sale.pdf | ||
| J45 Legislative Authority.pdf | ||
| J43-1 E.pdf | ||
| J39 Past Perf.pdf | ||
| Synopsis Minot Final 27 Jan 09.doc | DOC document |
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED 17 DEC 08 AIR FORCE UTILITIES PRIVATIZATION
ATTACHMENT J4
Minot AFB Wastewater System
Table of Contents
MINOT AFB WASTEWATER SYSTEM ......................................................................................................... I
J4 MINOT AFB WASTEWATER SYSTEM
J4.1 MINOT AFB OVERVIEW
J4.2 WASTEWATER SYSTEM DESCRIPTION
J4.2.1 Wastewater System Fixed Equipment Inventory J4.2.1.1 Description J4.2.1.2 Inventory
J4.2.2 Wastewater System Non-Fixed Equipment and Specialized Tools J4.2.3 Wastewater System Manuals, Drawings, and Records
J4.3 SPECIFIC SERVICE REQUIREMENTS
J4.4 CURRENT SERVICE ARRANGEMENT
J4.5 SECONDARY METERING
J4.6 MONTHLY SUBMITTALS
J4.7 INFILTRATION AND INFLOW (I&I) PROJECTS
J4.8 SERVICE AREA
J4.9 OFF-INSTALLATION SITES
J4.10 SPECIFIC TRANSITION REQUIREMENTS
J4.11 INITIAL SYSTEM DEFICIENCY CORRECTION
J4.12 RIGHT OF ACCESS TO THE UTILITY SYSTEM
J4.13 REQUEST FOR PROPOSAL (RFP) REQUIREMENTS FOR PRIVATIZATION OF WASTEWATER TREATMENT
PLANTS TO PRIVATE OWNERS
J4.13.1 Demonstration of Process Necessary to Treat the Entire Waste Stream treated at the Wastewater Treatment Facility J4.13.2 Capital Upgrades Necessary to Pretreat or Dispose Wastewater J4.13.3 Ownership of Effluent J4.13.4 Satisfaction of Applicable Licensing and Permitting Requirements
EXHIBIT A—MAP OF PREMISES
EXHIBIT B—DESCRIPTION OF PREMISES
B.1. General Description of the Utility System, Lateral Extent of the Right-of-Access, and Points of Demarcation:
B.2. Description of Restricted Access Areas:
EXHIBIT C—ENVIRONMENTAL BASELINE SURVEY
LIST OF TABLES
Fixed Inventory Spare Parts Specialized Vehicles and Tools Manuals, Drawings, and Records Infiltration and Inflow Projects Service Connections and Disconnections System Deficiencies
J4-I
J4 Minot AFB Wastewater System
J4.1 Minot AFB Overview Minot Air Force Base occupies 5,090 acres, or approximately 8 square miles, of federally owned land. It is located in northwestern North Dakota (ND), in Ward County, about 14 miles north of the City of Minot. Just off U.S. Highway 83, which parallels the eastern installation boundary, MAFB is about 40 miles south of the Canadian border. It is the home base to two wings, Air Combat Command's (ACC) 5th Bomb Wing (5 BW) and the Air Force Space Command's (AFSPC) 91st Space Wing (91 SW). Minot Air Force Base has been a major Air Force installation for more than 50 years. Minot businessmen donated approximately $50,000 to buy the first portions of land for an air base to be located north of the City.
Approximately 5,745 people are employed by the base. Of this total, 4,533 are military personnel and 1,212 are civilian employees.
J4.2 Wastewater System Description J4.2.1 Wastewater System Fixed Equipment Inventory The Minot AFB wastewater system consists of all appurtenances physically connected to the collection system from the point of demarcation defined by the Right of Access. The system may include, but is not limited to, pipelines, manholes, lift stations, valves, controls, and stabilization lagoons. The actual inventory of items sold will be in the bill of sale at the time the system is transferred. The following description and inventory is included to provide the Contractor with a general understanding of the size and configuration of the system.
The Government makes no representation that the inventory is accurate. The Contractor shall base its proposal on site inspections, information in the technical library, other pertinent information, and to a lesser degree the following description and inventory. Under no circumstances shall the Contractor be entitled to any service charge adjustments based on the accuracy of the following description and inventory.
Specifically excluded from the wastewater system privatization are:
• Oil / Water Separators (OWS)
• Grease Traps
• Storm sewers
J4.2.1.1 Description All domestic and industrial wastewater generated at Minot AFB is collected via a network of an estimated 273,364 linear feet of piping constructed of vitrified clay, polyvinyl chloride (PVC), polyethylene (PE), ductile iron, asbestos cement, concrete, and cast iron. The collection system consists of collection mains, precast manholes, and sewage lift stations.
The collection mains range in size from 1.5 to 24 inches in diameter and are buried at a base-
J4-1 wide average depth of 12 feet. Tracer wire is not included with the non-metallic components. A series of sewage lift stations and associated force mains are located throughout the installation to pump wastewater through the collection system where gravity flow is not possible. There is no separate industrial wastewater system. Industrial wastewater effluent from the aircraft and missile operations, maintenance areas and the industrial areas flows into the sanitary sewer system after being processed through oil/water separators. All collected wastewater flows to the sewage treatment lagoons located in the northern part of the base.
Minot AFB operates a series of stabilization lagoons to treat its wastewater. The stabilization lagoons are referred to as the Minot AFB WWTP (wastewater treatment plant). The stabilization system is comprised of two sets of three facultative lagoons each for a total of six lagoons. Wastewater is discharged to the lagoons where it flows by gravity or is pumped through the lagoon cells, and organic matter is allowed to decompose or settle out. The total liner area of the lagoons is approximately 324 acres with a storage capacity of approximately 345 million gallons. To increase capacity, stabilized wastewater is typically released from the final lagoon in each set twice a year, in the spring and fall, as necessary.
The flow from the stabilization lagoons is discharged off base through three permitted outfalls. Minot AFB was issued a North Dakota Pollutant Discharge Elimination System (NDPDES) Permit, No. ND-0020486 by the North Dakota Department of Health (NDDH), Division of Water Quality in July 2004. This permit authorizes Minot AFB to discharge stabilized wastewater from the treatment lagoons to unnamed tributaries of Egg Creek through Outfalls 003, 001, and 011. There are six other outfalls (004, 005, 006, 007, 008, and 009); however, the permit states that there shall be no discharges from these outfalls except for emergency bypasses in accordance with the permit. Minot AFB has approximately 140 Acres of easements associated with the discharge of the lagoons. These easements will be transferred upon sale of the wastewater collection system.
J4.2.1.2 Inventory Table 1 provides a general listing of the major wastewater system fixed assets for the Minot AFB wastewater system included in the sale.
TABLE 1
Fixed Inventory Wastewater Utility System Minot AFB
Component Item Size Quantity Unit Type
Approximate Year of
Construction
Design Life
(Years) Main Base
Asbestos Cement Pipe 8" 272 LF 1959 40 Asbestos Cement Pipe 15" 2,933 LF 1968 40
Concrete Pipe 6" 66 LF 1968 50 Cast Iron Pipe 10" 95 LF 1970 75 Cast Iron Pipe 4" 397 LF 1988 75
Ductile Iron Pipe 2" 259 LF 2002 75 Ductile Iron Pipe 4" 52 LF 2005 75 Ductile Iron Pipe 6" 102 LF 1986 75
J4-2
Component Item Size Quantity Unit Type
Approximate Year of
Construction
Design Life
(Years) Ductile Iron Pipe 12" 154 LF 1986 75
PE Pipe 2" 79 LF 2001 50 PVC Pipe 1.5" 1,624 LF 1995 50 PVC Pipe 2" 981 LF 1990 50 PVC Pipe 3" 4,094 LF 2000 50 PVC Pipe 4" 259 LF 1991 50 PVC Pipe 4" 269 LF 1997 50 PVC Pipe 4" 318 LF 2002 50 PVC Pipe 6" 646 LF 1990 50 PVC Pipe 6" 384 LF 1995 50 PVC Pipe 6" 381 LF 2000 50 PVC Pipe 6" 735 LF 2005 50 PVC Pipe 8" 725 LF 1992 50 PVC Pipe 8" 302 LF 1997 50 PVC Pipe 8" 1,384 LF 2000 50 PVC Pipe 8" 584 LF 2002 50 PVC Pipe 8" 718 LF 2005 50 PVC Pipe 10" 863 LF 1991 50 PVC Pipe 10" 4,137 LF 2001 50 PVC Pipe 12" 5,846 LF 1997 50 PVC Pipe 14" 177 LF 1993 50
Vitrified Clay Pipe 4" 702 LF 1962 50 Vitrified Clay Pipe 4" 1,690 LF 1977 50 Vitrified Clay Pipe 4" 1,801 LF 1982 50 Vitrified Clay Pipe 6" 4,767 LF 1959 50 Vitrified Clay Pipe 6" 1,791 LF 1962 50 Vitrified Clay Pipe 6" 1,024 LF 1968 50 Vitrified Clay Pipe 6" 876 LF 1970 50 Vitrified Clay Pipe 6" 456 LF 1977 50 Vitrified Clay Pipe 6" 121 LF 1985 50 Vitrified Clay Pipe 8" 10,544 LF 1956 50 Vitrified Clay Pipe 8" 11,722 LF 1958 50 Vitrified Clay Pipe 8" 4,485 LF 1962 50 Vitrified Clay Pipe 8" 207 LF 1985 50 Vitrified Clay Pipe 8" 476 LF 1988 50 Vitrified Clay Pipe 10" 2,533 LF 1956 50 Vitrified Clay Pipe 10" 13,235 LF 1958 50 Vitrified Clay Pipe 10" 3,793 LF 1959 50 Vitrified Clay Pipe 12" 1,631 LF 1959 50 Vitrified Clay Pipe 15" 2,782 LF 1956 50 Vitrified Clay Pipe 15" 2,897 LF 1968 50 Vitrified Clay Pipe 18" 39 LF 1970 50
Concrete MH 4' x 6' 29 EA 1956 60 Concrete MH 4' x 8' 28 EA 1956 60 Concrete MH 4' x 12' 15 EA 1956 60 Concrete MH 4' x 16' 17 EA 1956 60 Concrete MH 4' x 20' 19 EA 1956 60
J4-3
Year of
Construction
Design Life
(Years) Concrete MH 4' x 8' 18 EA 1959 60 Concrete MH 4' x 6' 22 EA 1962 60 Concrete MH 4' x 8' 17 EA 1962 60 Concrete MH 4' x 6' 14 EA 1968 60 Concrete MH 4' x 8' 16 EA 1968 60 Concrete MH 4' x 6' 5 EA 1988 60 Concrete MH 4' x 6' 4 EA 1991 60 Concrete MH 4' x 8' 5 EA 1991 60 Concrete MH 4' x 6' 2 EA 1995 60 Concrete MH 4' x 6' 4 EA 2000 60 Concrete MH 4' x 8' 2 EA 2000 60 Concrete MH 4' x 12' 3 EA 2001 60 Concrete MH 4' x 16' 1 EA 2001 60 Concrete MH 4' x 8' 4 EA 2002 60
Lift Station Medium 1 EA Wet Well 1962 75 Lift Station Medium 1 EA Wet Well 1968 75 Lift Station Medium 1 EA Wet Well 1982 75 Lift Station Medium 1 EA Wet Well 1991 75 Lift Station Medium 2 EA Wet Well 1995 75 Lift Station Medium 1 EA Wet Well 2001 75 Lift Station Medium 1 EA Wet Well 2002 75
Lift Station Medium 3 EA Wet Well 2003 75
Pump Station Medium 1 EA 1962 20 Pump Station Medium 1 EA 1968 20 Pump Station Medium 1 EA 1982 20 Pump Station Medium 2 EA 1995 20 Pump Station Medium 2 EA 2001 20
Lagoon Cell 1 Liner 52 Acre 2,265,120 SF 1959 20 Lagoon Cell 1 Rip-Rap 1.4 Acre 3,388 CY 1995 50
Lagoon Cell 2 Liner 48 Acre 2,090,880 SF 1959 20 Lagoon Cell 2 Rip-Rap 1.5 Acre 3,630 CY 1995 50
Lagoon Cell 3 Liner 43 Acre 1,873,080 SF 1959 20 Lagoon Cell 3 Rip-Rap 1.2 Acre 2,904 CY 1995 50
Lagoon Cell 4 Liner 114 Acre 4,965,840 SF 1968 20 Lagoon Cell 4 Rip-Rap 2.2 Acre 5,324 CY 1995 50
Lagoon Cell 5 Liner 52 Acre 2,265,120 SF 1968 20 Lagoon Cell 5 Rip-Rap 1.4 Acre 3,388 CY 1995 50
Lagoon Cell 6 Liner 15 Acre 653,400 SF 1998 20 Lagoon Cell 6 Rip-Rap 0.7 Acre 1,694 CY 1998 50
Gate Valve 12" 5 EA 1968 10 Gate Valve 4" 5 EA 1968 10 Gate Valve 3" 1 EA 1991 10 Gate Valve 12" 1 EA 1993 10 Gate Valve 3" 1 EA 1995 10 Gate Valve 3" 5 EA 2001 10
Cathodic Protection Stations - 10 EA 1968 20 Telemetry - 4 EA 2006 20
J4-4
Year of
Construction
Design Life
(Years)
Flight Line Concrete Pipe 24" 121 LF 1986 50
Cast Iron 3" 1,073 LF 1958 75 Cast Iron 4" 210 LF 1984 75 Cast Iron 6" 72 LF 1984 75
Ductile Iron 1.5" 1,017 LF 2002 75 Ductile Iron 2" 2,162 LF 2002 75 PVC Pipe 2" 1,706 LF 1995 50 PVC Pipe 4" 16 LF 1991 50 PVC Pipe 4" 33 LF 1994 50 PVC Pipe 6" 246 LF 1993 50 PVC Pipe 6" 289 LF 1995 50 PVC Pipe 6" 279 LF 2000 50 PVC Pipe 8" 2,562 LF 1995 50 PVC Pipe 8" 79 LF 1997 50
Vitrified Clay Pipe 4" 558 LF 1958 50 Vitrified Clay Pipe 6" 1,093 LF 1956 50 Vitrified Clay Pipe 6" 433 LF 1957 50 Vitrified Clay Pipe 6" 2,877 LF 1958 50 Vitrified Clay Pipe 6" 856 LF 1959 50 Vitrified Clay Pipe 6" 262 LF 1960 50 Vitrified Clay Pipe 6" 801 LF 1961 50 Vitrified Clay Pipe 6" 249 LF 1975 50 Vitrified Clay Pipe 6" 112 LF 1983 50 Vitrified Clay Pipe 6" 23 LF 1984 50 Vitrified Clay Pipe 8" 3,031 LF 1956 50 Vitrified Clay Pipe 8" 4,350 LF 1958 50 Vitrified Clay Pipe 8" 1,867 LF 1959 50 Vitrified Clay Pipe 8" 1,168 LF 1960 50 Vitrified Clay Pipe 8" 1,181 LF 1961 50 Vitrified Clay Pipe 8" 459 LF 1968 50 Vitrified Clay Pipe 8" 853 LF 1970 50 Vitrified Clay Pipe 8" 669 LF 1982 50 Vitrified Clay Pipe 8" 89 LF 1983 50 Vitrified Clay Pipe 8" 374 LF 1986 50 Vitrified Clay Pipe 8" 135 LF 1989 50 Vitrified Clay Pipe 10" 663 LF 1958 50 Vitrified Clay Pipe 10" 1,270 LF 1959 50 Vitrified Clay Pipe 15" 82 LF 1983 50 Vitrified Clay Pipe 18" 246 LF 1986 50 Vitrified Clay Pipe 24" 203 LF 1986 50
Concrete MH 4' x 6' 20 EA 1956 60 Concrete MH 4' x 8' 21 EA 1956 60 Concrete MH 4' x 12' 12 EA 1956 60 Concrete MH 4' x 8' 17 EA 1959 60 Concrete MH 4' x 8' 5 EA 1961 60
J4-5
Year of
Construction
Design Life
(Years) Concrete MH 4' x 8' 4 EA 1970 60 Concrete MH 4' x 12' 3 EA 1970 60 Concrete MH 4' x 8' 4 EA 1982 60 Concrete MH 4' x 12' 3 EA 1982 60 Concrete MH 4' x 8' 6 EA 1986 60 Concrete MH 4' x 6' 2 EA 1989 60 Concrete MH 4' x 6' 7 EA 1995 60 Concrete MH 4' x 6' 1 EA 2002 60 Concrete MH 4' x 8' 2 EA 2002 60
Lift Station Medium 1 EA Wet Well 1958 75 Lift Station Medium 1 EA Wet Well 1993 75 Lift Station Medium 1 EA Wet Well 1995 75 Lift Station Medium 1 EA Wet Well 2002 75
Pump Station Medium 1 EA 1958 75 Pump Station Medium 1 EA 1993 75 Pump Station Medium 1 EA 1995 75 Pump Station Medium 1 EA 2002 75
WSA
Vitrified Clay Pipe 6" 1,693 LF 1968 50 Vitrified Clay Pipe 8" 1,293 LF 1986 50 Vitrified Clay Pipe 10" 69 LF 1970 50 Vitrified Clay Pipe 15" 328 LF 1986 50
PVC Pipe 8" 2,844 LF 2000 50 Concrete MH 4' x 6' 5 EA 1986 60 Concrete MH 4' x 8' 6 EA 1986 60 Concrete MH 4' x 12' 2 EA 1986 60 Concrete MH 4' x 8' 6 EA 1970 60 Concrete MH 4' x 6' 4 EA 1970 60 Concrete MH 4' x 12' 1 EA 2000 60
Lift Station Medium 1 EA Wet Well 1970 75
East Housing PVC Pipe 4" 7,237 LF 2004 50 PVC Pipe 6" 25,393 LF 2004 50 PVC Pipe 8" 43,513 LF 2004 50 PVC Pipe 10" 814 LF 2004 50 PVC Pipe 12" 2,152 LF 2004 50
Concrete MH 4' x 6' 39 EA 2004 60 Concrete MH 4' x 8' 44 EA 2004 60 Concrete MH 4' x 12' 23 EA 2004 60 Concrete MH 4' x 16' 11 EA 2004 60
Lift Station Medium 3 EA Wet Well 2004 75
West Housing PVC Pipe 4" 4,741 LF 2006 50 PVC Pipe 6" 14,262 LF 2006 50
J4-6
Year of
Construction
Design Life
(Years) PVC Pipe 8" 27,674 LF 2006 50 PVC Pipe 10" 2,890 LF 2006 50 PVC Pipe 12" 3,904 LF 2006 50 PVC Pipe 15" 1,132 LF 2006 50 PE Pipe 4" 1,122 LF 2006 50 PE Pipe 6" 581 LF 2006 50 PE Pipe 8" 1,342 LF 2006 50 PE Pipe 10" 203 LF 2006 50
Concrete MH 4' x 6' 33 EA 2006 60 Concrete MH 4' x 8' 39 EA 2006 60 Concrete MH 4' x 12' 27 EA 2006 60 Concrete MH 4' x 16' 18 EA 2006 60 Concrete MH 4' x 20' 4 EA 2006 60
Lift Station Medium 2 EA Wet Well 2006 75
Pump Station Medium 2 EA 2006 75
Notes:
PVC = Polyvinyl Chloride AC = Asbestos Cement Pipe LF = Linear Feet EA = Each VC = Vitrified Clay Pipe PE = Polyethylene MH = Man Hole
J4.2.2 Wastewater System Non-Fixed Equipment and Specialized Tools Table 2 lists other ancillary equipment (spare parts) and Table 3 lists specialized vehicles and tools included in the purchase. Offerors shall field verify all equipment, vehicles, and tools prior to submitting a bid. Offerors shall make their own determination of the adequacy of all equipment, vehicles, and tools.
J4-7
TABLE 2
Spare Parts Wastewater System Minot AFB
Qty Item Make/Model Description Remarks
None
TABLE 3
Specialized Vehicles and Tools Wastewater System Minot AFB
Description Quantity Location Maker
J4.2.3 Wastewater System Manuals, Drawings, and Records Table 4 lists the manuals, drawings, and records that will be transferred with the system.
TABLE 4
Manuals, Drawings, and Records Wastewater System Minot AFB
Qty Item Description Remarks
1 General Plan
1 Infiltration and Inflow Summary Report Dated: 1997
1 Wastewater and Storm water System Evaluation Dated: July 2006
1 Sanitary Sewer Summary & Recommendations Technical Report Dated: September
O&M Construction / Customer Concept Document for Sanitary Sewer System Rehabilitation
Dated: August 2001
1 Discharge Reports Dated: 1997-2007
1 Sludge Management Technical Report
1 Utility Drawings GIS data, AutoCAD G-tabs, Project As Builts
1 AF 7115 Real Property Records
Legal Descriptions of Easements
Project Listings 1391’s
J4-8
J4.3 Specific Service Requirements The service requirements for the Minot AFB wastewater system are as defined in the Section C, Description/Specifications/Work Statement.
J4.4 Current Service Arrangement Minot AFB owns the sewage collection and treatment system that serves the base. All wastewater is collected in one of six lagoon cells. The flow from the stabilization lagoons is discharged off base through three permitted outfalls. Minot AFB was issued a North Dakota Pollutant Discharge Elimination System (NDPDES) Permit, No. ND-0020486 by the North Dakota Department of Health (NDDH), Division of Water Quality in July 2004. This permit authorizes Minot AFB to discharge stabilized wastewater from the treatment lagoons to unnamed tributaries of Egg Creek through Outfalls 003, 001, and 011. Lagoon 3, which is preceded by Lagoons 1 and 2, discharges through Outfall 003; Lagoon 5 discharges through Outfall 001; and Lagoon 6 discharges through Outfall 011. The permit also authorizes Outfall 010 to receive groundwater and/or lagoon seepage from an interceptor drain that runs along the northern boundary of the northeast lagoon system. There are six other outfalls (004, 005, 006, 007, 008, and 009); however, the permit states that there shall be no discharges from these outfalls except for emergency bypasses in accordance with the permit.
J4.5 Secondary Metering None.
J4.6 Monthly Submittals The Contractor shall provide the Government monthly submittals for the following:
1. Outage Report. The Contractor’s monthly outage report (blockage and overflow information) will be prepared in the format proposed by the Contractor and accepted by the Contracting Officer. Outage reports shall be submitted by the 25th of each month for the previous month. Outage reports shall be submitted to:
Name: Utility COTR Address: 5 CES/CER
211 Missile Road Minot AFB, ND 58705
Phone number: (701) 723-3057
2. Infiltration and Inflow Report. If required by Paragraph C.3, the Contractor shall submit an Infiltration and Inflow report in a format proposed by the Contractor and accepted by the Contracting Officer. System efficiency reports shall be submitted by the 25th of each month for the previous month. System efficiency reports shall be submitted to:
Name: Utility COTR Address: 5 CES/CER
211 Missile Road
J4-9
Minot AFB, ND 58705 Phone number: (701) 723-3057
J4.7 Infiltration and Inflow (I&I) Projects IAW Paragraph C.3, Utility Service Requirement, the following projects have been implemented by the Government for managing and monitoring I&I.
TABLE 5
Infiltration and Inflow Projects Wastewater System Minot AFB
Study Date Project
Infiltration/Inflow Study 1997 Replace 18,782 lf of sewer in MFH
Infiltration/Inflow Study 1997 Replace 1,360 lf of sewer
Infiltration/Inflow Study 1997 Replace sewer on Summit Drive
Infiltration/Inflow Study 1997 Repair 1,500 lf of sewer
Infiltration/Inflow Study 1997 Repair 150 manholes
Infiltration/Inflow Study 1997 Repair sewer lines in MFH
Infiltration/Inflow Study 1997 Replace Lift Station 2111
Infiltration/Inflow Study 1997 Repair LS 1122; replace 5,000 lf of sewer line; eliminate lift station at J.R. Rockers (LS 292)
Infiltration/Inflow Study 1997 Eliminate selected septic tanks and install new gravity lines; Replace collapsed sewer lines, Install new pumps at LS 499, and Replace 2,170 lf of sewer line in DRMO, 2,845 lf in the Weapons Storage Area, and 250 lf near the Pride Building
Infiltration/Inflow Study 1997 Replace LS 2112; and Replace 460 lf of associated sewer line
Infiltration/Inflow Study 1997 Replace and upgrade LS 172; Replace LS 179; Replace 8,000 lf in MFH areas; and replace a sewer line at the Heat Plant
J4.8 Service Area IAW Paragraph C.4, Service Area, the service area is defined as all areas within the Minot AFB boundaries, except as noted in paragraph J4.2.1 (above).
J4.9 Off-Installation Sites No off-installation sites are included in the sale of the Minot AFB wastewater system.
J4-10
J4.10 Specific Transition Requirements IAW Paragraph C.13, Transition Plan, Table 5 provides a listing of service connections and disconnections required upon transfer.
TABLE 6
Service Connections and Disconnections Wastewater System Minot AFB
Location Description
J4.11 Initial System Deficiency Correction Table 7 provides a listing of ISDC projects the Government has planned for this system.
The Government recognizes these projects represent current deficiencies associated with the system. If the system is sold, the Government will not accomplish these projects. The Contractor shall determine the actual need and timing of any and all such projects. ISDC projects shall be proposed in Section B.7.4, Schedule 3 of the RFP.
TABLE 7
System Deficiencies Electric Distribution System Minot AFB
Project Location Project Description
J4.12 Right of Access to the Utility System No leased property was identified with the Wastewater collection system.
J4.13 Request for Proposal (RFP) Requirements for Privatization of Wastewater Treatment Plants to Private Owners The Air Force currently operates the WWTP as a Federally Owned Treatment Works, as defined in Resource Conservation and Recovery Act (RCRA) § 3023(d), 42 United States Code (U.S.C.) § 6939e(d). Proposals from prospective Offerors shall demonstrate whether the Offerors propose to own and operate the WWTP as a Federally/Publicly Owned Treatment Works or as a Privately Owned Treatment Works. Prospective Offerors who propose to own and operate the WWTP as a Federally/Publicly Owned Treatment Works shall obtain a declaratory ruling from an appropriate tribunal showing that such Offerors can own and operate the WWTP as a Federally/Publicly Owned Treatment Works and setting forth any conditions which must be met in order for such Offerors to so operate it.
J4-11
J4.13.1 Demonstration of Process Necessary to Treat the Entire Waste Stream treated at the Wastewater Treatment Facility If the WWTP becomes a Privately Owned Treatment Works neither the Offeror nor the Government will be able to take advantage of the RCRA domestic sewage exclusion set forth in RCRA Section 3023(a), 42 U.S.C. § 6939e. Offerors who propose to own and operate the WWTP as a Privately Owned Treatment Works are required to demonstrate the process they will use to deal with the entire waste stream currently treated by the wastewater treatment facility. The proposal must outline clearly and completely how they propose to mitigate any increased cost of operation resulting from the generation of waste by the Government, which may contain hazardous waste and which must be treated without the benefit of the RCRA domestic waste exclusion. It must be emphasized that the Government will provide such information as is currently available regarding the composition of the waste stream, but does not warrant or represent this information as complete regarding what hazardous waste may be in the waste stream currently treated by the wastewater treatment facility. This is due to the fact that the Government has operated the wastewater treatment facility under the domestic waste exclusion provided by 42 U.S.C. 6939e, which is not available to Privately Owned Treatment Works. Privately owned Offerors must also demonstrate how they propose to accept and process waste without adversely affecting operating permits and licenses which apply to the WWTP. In addition, such Offerors must identify those potential legal responsibilities that it will undertake with a description of the actual and potential economic impacts to the Government of those retained legal responsibilities the Contractor will not or cannot undertake.
J4.13.2 Capital Upgrades Necessary to Pretreat or Dispose Wastewater Offerors who propose owning and operating the WWTP as a Privately Owned Treatment Works, shall fully demonstrate their understanding of this operational risk by including in their proposals a full description of any capital upgrades necessary to pretreat waste before it enters the facility, or other proposed disposition method, as well as the operational changes necessary to ensure the operation of the plant is in compliance with applicable federal, state, and local operating requirements. If any studies are required to evaluate those costs, they shall be included in such proposals, along with a description of the licensing and permitting process that will be required in order for the Offeror to own and operate the WWTP as a Privately Owned Treatment Works.
a) In addition to the requirements of Section C.3.1, “Utility Service Requirement”, the Privately Owned Treatment Works shall also be responsible for the pretreatment and management of all wastes discharged to the Air Force treatment plant.
Responsibility and liability for all costs shall include, but not be limited to any applicable regulatory requirements due to the absence of the RCRA waste exclusion (including any RCRA requirements that may apply to any facilities currently sending waste to the wastewater treatment works). Offerors are on notice that the current wastewater collection system mixes waste from a variety of sources, and the Government cannot specifically identify all potential individual sources of hazardous waste.
b) In addition to the requirements of Section C.3.2, “Performance Standards”, specifically regarding the Quality Management Plan, Offerors proposing to operate
J4-12 the WWTP as a Privately Owned Treatment Works shall address hazardous waste generation, characterization, storage, treatment, reduction, disposal, and management in the Quality Management Plan.
c) In addition to the requirements of Section C.7, “Response to Service Interruptions/Contingencies and Catastrophes”, Offerors proposing to operate the WWTP as Privately Owned Treatment Works shall address hazardous waste monitoring and the impact of, and the planned response to, the receipt of hazardous waste at the WWTP in the Service Interruption/Contingency Plan.
d) In addition to the requirements of Section C.10, “Environmental Compliance”, Offerors proposing to operate the WWTP as Privately Owned Treatment Works shall address the disposition of all RCRA listed wastes currently being discharged to the Air Force treatment plant.
e) Privately Owned Treatment Works shall be responsible for any additional requirements/costs, to include, but not limited to, treatment, operations and waste disposal due to the loss of the domestic sewage exclusion. These processes shall be specifically explained in the proposal and the costs shall be included in the proposal.
J4.13.3 Ownership of Effluent The new owner shall own all effluent, as stipulated by Section C.3.6, “Wastewater Effluent Disposal”, originating at the Points of Demarcation described in Section J4.12, “Right of Access to the Utility System”.
J4.13.4 Satisfaction of Applicable Licensing and Permitting Requirements In addition to the requirements of Sections C specifically regarding the National Pollution Discharge Elimination System (NPDES) permit obtained pursuant to 33 U.S.C. § 1342 (or analogous state law), the Offeror's proposal shall demonstrate how it proposes to satisfy applicable U.S. Environmental Protection Agency (EPA) and state and local licensing and permitting requirements established by federal, state, and local law and whether or not, as a Privately Owned Treatment Works, it will be able to obtain all necessary licensing and operating permits. If not, the Offeror shall describe who will hold the licenses and permits and the impact on operations as well as the potential economic consequences to the Government of the Offeror not holding the licenses and operating permits required for the ownership and operation of the WWTP.
J4-13
Exhibit A—Map of Premises
Exhibit A map or maps from the Base Comprehensive Plan or other drawings show the known locations of the utility system and are available at the Base Civil Engineering Office.
Portions of the utility system may not be fully shown on the map or maps. Any such failure to show the complete utility system on the map or maps shall not be interpreted as that part of the utility system being outside the Premises. The Premises are co-extensive with the entire linear extent of the utility system sold to Grantee, whether or not precisely shown on the map or maps.
Utility system drawings are available for review in the Technical Library
Exhibit B—Description of Premises
B.1. General Description of the Utility System, Lateral Extent of the Right-of- Access, and Points of Demarcation:
UTILITY SYSTEM DESCRIPTION:
The utility system may be composed of, without limitation, collection piping, manholes, final discharge meters, lift stations, treatment plants, supporting emergency generator sets (if any), and electrical controls associated with the lift stations and emergency generator sets on the Installation.
LATERAL EXTENT OF UTILITY SYSTEM RIGHT-OF-ACCESS:
For pipe sizes of 24 inches in diameter and less, 26-feet-wide, extending 13 feet on each side of the utility system, as installed.
For pipe sizes of greater than 24 inches in diameter, 50-feet-wide, extending 25 feet on each side of the utility system, as installed.
For each wastewater treatment lagoon, extending 25 feet on each side of the lagoon, as constructed.
UTILITY SYSTEM POINTS OF DEMARCATION:
J4-14
The point of demarcation is defined as the point on the utility system where ownership changes from the utility system owner to the facility owner. The table below identifies the type and general location of the point of demarcation with respect to the facility for each scenario.
Point of Demarcation
(POD)
Applicable Scenario Sketch
POD is is on the upstream side of the cleanout device.
A sewer system cleanout is located within 10 feet of the building perimeter on the service line.
Structure
Service Line
Sewer System
Pipe Cleanout
Point of Demarcation
Sewer System POD is where the service line enters the structure.
Note: A cleanout device should be installed within 10 feet of the structure during any stoppage or maintenance action.
When this is accomplished, the upstream side of this cleanout device will become the new POD.
No cleanout exists on the service line within 10 feet of the structure.
Sewer System Service
Line
Structure
Point of Demarcation
Sewer System
POD is the outlet side of the Grease Trap, Oil Water Separator, or Pretreatment System.
Any grease trap, oil water separator, or pretreatment system on the service line.
None
POD is at the overhead service line’s connection to the service entrance mast.
Note: If an electric meter is present, or is to be installed, the owner of the electric distribution system on the installation is the owner and maintainer of the electric meter. The POD for the electric meter is at the wastewater utility owner’s conductors to the electric utility owner’s conductors.
This meter POD applies regardless of the location of the electric utility owner’s meter. The wastewater
Electric power is provided to a wastewater facility via an overhead service drop. This configuration could be found at facilities dedicated to the wastewater utility such as a lift station or wastewater treatment plant.
J4-15
Point of Demarcation
(POD)
Applicable Scenario Sketch utility owner will own the service entrance mast, including the can.
POD is at the transformer secondary terminal spade.
Note: If an electric meter is present, or is to be installed, the owner of the electric distribution system on the installation is the owner and maintainer of the electric meter. The POD for the meter is at the wastewater utility owner’s conductors to the electric utility owner’s conductors. This meter POD applies regardless of the location of the electric meters and transformers.
Electric power is provided to a wastewater facility via an underground service connection.
This configuration could be found at facilities dedicated to the wastewater utility such as a lift station or wastewater treatment plant.
UNIQUE POINTS OF DEMARCATION:
The following table lists anomalous points of demarcation that do not fit any of the above scenarios.
Building No. Point of Demarcation (POD) Description
B.2. Description of Restricted Access Areas:
Description Facility # State Coordinates Other Information
Weapons Storage Area (WSA)
Flight Line
Munitions Storage Area
(MSA)
Notification will be required prior to work performed on any exterior portion of the compounds
J4-16
J4-17
Exhibit C—Environmental Baseline Survey The Air Force has determined that it is not required to conduct an EBS in regard to the sale of this utility system.
| Minot AFB Wastewater System |
| J4 Minot AFB Wastewater System |
| J4.1 Minot AFB Overview |
| J4.2 Wastewater System Description |
| J4.2.1 Wastewater System Fixed Equipment Inventory |
| J4.2.1.1 Description |
| J4.2.1.2 Inventory |
| J4.2.2 Wastewater System Non-Fixed Equipment and Specialized Tools |
| J4.2.3 Wastewater System Manuals, Drawings, and Records |
| J4.3 Specific Service Requirements |
| J4.4 Current Service Arrangement |
| J4.5 Secondary Metering |
| J4.6 Monthly Submittals |
| J4.7 Infiltration and Inflow (I&I) Projects |
| J4.8 Service Area |
| J4.9 Off-Installation Sites |
| J4.10 Specific Transition Requirements |
| J4.11 Initial System Deficiency Correction |
| J4.12 Right of Access to the Utility System |
| J4.13 Request for Proposal (RFP) Requirements for Privatization of Wastewater Treatment Plants to Private Owners |
| J4.13.1 Demonstration of Process Necessary to Treat the Entire Waste Stream treated at the Wastewater Treatment Facility |
| J4.13.2 Capital Upgrades Necessary to Pretreat or Dispose Wastewater |
| J4.13.3 Ownership of Effluent |
| J4.13.4 Satisfaction of Applicable Licensing and Permitting Requirements |
| Exhibit A—Map of Premises |
| Exhibit B—Description of Premises |
| B.1. General Description of the Utility System, Lateral Extent of the Right-of-Access, and Points of Demarcation: |
| B.2. Description of Restricted Access Areas: |
Exhibit C—Environmental Baseline Survey
File details come from the government source that posted it. Updated .