Electric Master Task List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2012-05-08 Amd 0009.pdf | ||
| 2011-04-18 Amd 0008.pdf | ||
| 2011-04-18 Amd 0007.pdf | ||
| 2011-02-10 Amd 0006.pdf | ||
| Amend 0005.pdf | ||
| 2009 10 02 Amendment 0005 Solicitation.pdf | ||
| Amd 0004.pdf | ||
| Minot AFB QA 1.pdf | ||
| Amd 0003.pdf | ||
| Amd 0002.pdf | ||
| Amd 0001.pdf | ||
| J42 Bill of Sale.pdf | ||
| Amd 0001.doc | DOC document | |
| W Task List.xls | XLS spreadsheet | |
| J38 Federal Equivalents.pdf | ||
| J40_Example_FP-PPR.pdf | ||
| RFP Minot 021209 | — | |
| J3 010709.pdf | ||
| J44 | — | |
| J1 011209.pdf | ||
| J41 Subcontracting Plan.pdf | ||
| J42 Bill of Sale.pdf | ||
| J45 Legislative Authority.pdf | ||
| J43-1 E.pdf | ||
| J39 Past Perf.pdf | ||
| J43-4 S.pdf | ||
| J43-3 W.pdf | ||
| J4 011209.pdf | ||
| Synopsis Minot Final 27 Jan 09.doc | DOC document |
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J43 Task
| MASTER TASK LIST (3E0X1 Electrical) Minot AFB-ND | ||||||||||
| OFFERORS NOTES: | ||||||||||
| 1. This document corresponds to the 3E0X1 CFETP. | ||||||||||
| 2. It is not the government user’s intent that an individual course be developed for each listed task. Conversely, it is strongly suggested that the offeror logically group similar-type tasks into a series of course instructional blocks. A typical course instructional block example can be found in Exhibit A. | ||||||||||
| 3. A variety of references may be used to develop course instructional block curriculum (to include identified Air Force standards and reference material). Regardless of the choice, any curriculum developed shall reflect only those approved standards/techniques used throughout the industry. Questions relating to the description of a particular task requirement (to include queries on proposed training standards, methods, and instructional block composition) shall be forwarded to the contracting officer for consultation and clarification. | ||||||||||
| 4. Training identified in the following task numbers with an oblonged circle () will be accomplished with conductors/circuits "de-energized". Note: Some tasks will require energizing a conductor/circuit to train on test equipment and to ensure circuits are operational. Contractors are responsible for providing training identified on this Master Task List which contains task relevant to safety and electrical distribution equipment/components for installing, maintaining and repairing utilities that were awarded in the privatization contract. | ||||||||||
| * | This is a mandatory core task that must be met and signed off by the trainer, certifier & trainee in order for upgrade to the 5-skill Level. | |||||||||
| ** | This is a mandatory core task, that must be met and signed off by the trainer, certifier & trainee in order for upgrade to the 7-skill Level. | |||||||||
| TASK #11 - AF OCCUPATIONAL SAFTEY AND HEALTH (AFOSH) PROGRAM | ||||||||||
| Task # | Task Title/Performance Objective | AF Standards/ References | Student Required Frequency | QT Qty/Hours | UGT Qty/Hours | |||||
| 11.2.2.1 & 11.2.2.2 | Task Title: Safety Standards for AFSs, Confined space, safe entry procedures, test and ventilate for safe entry. | AFOSH 91-25; Confined Spaces | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Students will open the access point to an enclosed space, test, and then ventilate the air within that space, re-test the air following ventilation, and then enter the space. | ||||||||||
| 11.3.1 | Task Title: Safety Standards for AFSs, Perform rescue, Pole top | Lineman’s & Cableman’s Handbook (L&C HB) | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Given an overhead line rescue situation, understand and implement procedures associated with pole top rescue operations. | ||||||||||
| 11.4.1.1 & 11.4.1.2 | Task Title: Maintenance of distribution system. | (L&C HB) | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Maintenance of distribution system over and under 600 volts. | ||||||||||
| 11.3.2 | Task Title: Safety Standards for AFSs, Perform rescue, manhole. | AFOSH 91-25; Confined Spaces | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Given a manhole rescue situation, understand and implement procedures associated with man hole rescue operations. | ||||||||||
| 11.4.2.1 & 11.4.2.2 | Task Title: Work on de-energized circuits | (L&C HB | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Work on de-energized circuits over and under 600 volts. | ||||||||||
| 11.5.1 & 11.5.2 | Task Title: Hotline tools and Rubber protective equipment. | AFOSH 91-25; Confined Spaces | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Conduct safety inspections of hotline tools and rubber. | ||||||||||
| TASK 16 – SUBSTATION EQUIPMENT | ||||||||||
| 16.2.1 | Task Title: Substation equipment, Install, Potential transformers | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr. | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures safely install potential transformers. | ||||||||||
| 16.2.2 | Task Title: Substation equipment, Install, Current transformers | |||||||||
| Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures safely install current transformers. | Annual | 22 | 2 | 6 | 8 | |||||
| 16.4 | Task Title: Substation equipment, Inspect/Troubleshoot substation equipment. | Annual | 22 | / | 2 | 6 | / | 8 | ||
| Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures inspect/troubleshoot substation equipment to restore correct operations. | ||||||||||
| TASK #17 – OVERHEAD DISTRIBUTION SYSTEMS | ||||||||||
| 17.1.1 * | Task Title: Overhead distribution systems, Climb poles, using gaffs. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Use approved methods to safely ascend and descend a wooden utility pole. Accomplish this task using required climbing equipment without falling. | ||||||||||
| 17.1.2 * | Task Title: Overhead distribution systems, Climb poles, working on pole components. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using approved methods, safely belt-in and un-belt using a safety strap to circle, hitchhike up & down, and obtain a correct work position on a wooden utility pole. Accomplish this task using required climbing equipment without falling. | ||||||||||
| 17.1.3 * | Task Title: Overhead distribution systems, Climb poles, traversing obstacles. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using approved methods, safely traverse a single crossarm, double crossarm or clevis to obtain a work position on a wooden utility pole. Accomplish this task using required climbing equipment without falling. | ||||||||||
| 17.2.1 | Task Title: Overhead distribution systems, Handle poles, Load/Unload poles. | L&C HB | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using approved industry standards, safely handle, load, and unload poles. Accomplish this task without damaging the pole. | ||||||||||
| 17.2.2 | Task Title: Overhead distribution systems, Handle poles, Transport poles. | L&C HB | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using approved industry standards safely transport pole to and from work sites. Accomplish this task without damaging the pole. | ||||||||||
| 17.2.3 | Task Title: Overhead distribution systems, Handle poles, Frame poles | L&C HB | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using approved industry standards safely frame a three-phase wood pole on the ground. | ||||||||||
| 17.2.4 * | Task Title: Overhead distribution systems, Handle poles, Set utility poles. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using all necessary equipment, safely install a 40 ft wooden pole. | ||||||||||
| 17.3.1 () | Task Title: Overhead distribution systems, Install, Guys. | L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using a variation of gauged wires, properly install guys such as Sidewalk, Overhead, Span, Down, and Stub guys. | ||||||||||
| 17.3.2 * () | Task Title: Overhead distribution systems, Install, Overhead line conductors. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Given various scenarios, use necessary equipment to safely install, sag, secure, and energize overhead line conductors. | ||||||||||
| 17.3.3 () | Task Title: Overhead distribution systems, Install, Anchors | L&C HB | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Given various scenarios, properly calculate anchor installation points/depths and install anchors. | ||||||||||
| 17.3.4.1 * () | Task Title: Overhead distribution systems, Install, Pole equipment, Conductor support devices. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Given various scenarios, use necessary equipment to safely install conductor support devises such as Wooden crossarms, epoxy arms, pin insulators, suspension insulators, and spool insulators. | ||||||||||
| 17.3.4.2 * () | Task Title: Overhead distribution systems, Install, Pole equipment, Transformers. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Given various scenarios, use necessary equipment to safely and properly install transformers using three approaches; installation manually (using a tagline, block & tackle, and transformer gin) directly to utility pole, installation manually using cluster brackets, and installation mechanically (no block & tackle or transformer gin) using a derrick truck winch. | ||||||||||
| 17.3.4.3 * | Task Title: Overhead distribution systems, Install, Pole equipment, Protective devices. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Given various scenarios, use necessary equipment to safely and properly install over voltage/current protective devises such as lightning arresters and fuse cutouts. | ||||||||||
| 17.3.7 * | Task Title: Overhead distribution systems, Install, Grounding set | Module #17; Overhead Distribution Systems | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Using all necessary equipment, properly determine grounding set requirements and install on overhead lines. | ||||||||||
| 17.3.8.1 * () | Task Title: Overhead distribution systems, Install, Service, Drops. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using all necessary equipment, accurately determine service drop wire dimension and distance. Use acquired information to safely install drop from the service entrance to the transformer. | ||||||||||
| 17.3.8.2 () | Task Title: Overhead distribution systems, Install, Service, Laterals | L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using all necessary equipment, safely install service lateral. | ||||||||||
| 17.4 * | Task Title: Overhead distribution systems, Inspect poles and installed equipment | Module #17; Overhead Distribution Systems | Annual | 22 | / | 3 | 6 | / | 10 | |
| Performance Objective: Given equipment, safely perform an inspection of an overhead distribution system pole and installed equipment. | ||||||||||
| 17.6 | Task Title: Overhead distribution systems, Perform recurring maintenance on overhead distribution equipment | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using handtools, test equipment, and blocking and tagging procedures perform recurring maintenance on overhead distribution equipment. | ||||||||||
| 17.7 () | Task Title: Overhead distribution systems, Isolate system faults. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using test equipment, safety equipment, and blocking and tagging procedures isolate system faults for repair or replacement. | ||||||||||
| 17.8 () | Task Title: Overhead distribution systems, Splice de-energized overhead conductor. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Given various scenarios, use necessary equipment to safely and properly install a compression sleeve splice and an automatic tension splice on de-energized overhead conductors. | ||||||||||
| 17.9 () | Task Title: Overhead distribution systems, Splice non-energized overhead conductor | |||||||||
| Performance Objective: Given various scenarios use necessary safety and hot line equipment to safely and properly splice non-energized overhead conductors. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | ||
| Performance Objective: Given various scenarios use necessary safety and hot line equipment to safely and properly splice non-energized overhead conductors | ||||||||||
| 17.10 () | Task Title: Overhead distribution systems, Transfer de-energized conductors from old pole to new pole | Annual | 22 | / | 2 | 6 | / | 6 | ||
| Performance Objective: After reaching a working position on the pole, use necessary safety and hotline equipment to properly transfer de-energized conductors from an old pole to an adjacent new pole. | ||||||||||
| 17.11 * () | Task Title: Overhead distribution systems, Perform transformer connections. | Module #17; Overhead Distribution Systems | Annual | 22 | / | 11 | 6 | / | 12 | |
| Performance Objective: Given various scenarios, select the proper method to make internal and external connections to a de-energized pole mounted transformer. | ||||||||||
| TASK #18 – UNDERGROUND DISTRIBUTION SYSTEMS | ||||||||||
| 18.1.1 * | Task Title: Underground distribution systems, Install, Direct burial cable. | Module #18; Underground Distribution Systems | Annual | 22 | / | 3 | 6 | / | 10 | |
| Performance Objective: Using necessary equipment, properly install direct burial cable. | ||||||||||
| 18.1.2 | Task Title: Underground distribution systems, Install, Underground duct systems. | L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using necessary equipment, properly select and install earthen buried plastic duct systems. | ||||||||||
| 18.1.3 | Task Title: Underground distribution systems, Install, Underground cable in duct | L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using necessary equipment, properly install direct buried cable through a plastic duct system. | ||||||||||
| 18.1.4.1 * | Task Title: Underground distribution systems, Install, Transformers, On pads. | Module #18; Underground Distribution Systems | Annual | 22 | / | 4 | 6 | / | 12 | |
| Performance Objective: Using necessary equipment, properly position, place, anchor (if required), connect and energize a transformer on a concrete or equivalent type pad. | ||||||||||
| 18.1.4.2 | Task Title: Underground distribution systems, Install, Transformers, In Vaults. | L&C HB | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using lifting equipment such as forklift or line truck and working in a two or three man team, install a transformer in a vault. | ||||||||||
| 18.1.5 * | Task Title: Underground distribution systems, Install, Transformers, Grounding set. | Module #18; Underground Distribution Systems | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Using necessary equipment, properly install a grounding set on a pad mounted transformer. | ||||||||||
| 18.2.1 * | Task Title: Underground distribution systems, Splice high voltage underground cable, Using tape. | Module #18; Underground Distribution Systems | Annual | 22 | / | 3 | 6 | / | 10 | |
| Performance Objective: Using necessary equipment, properly apply the correct layers of rubber, plastic, semi conductive, and conductive tape to perform a tape splice on a single conductor, jacketed primary cable. | ||||||||||
| 18.2.2 | Task Title: Underground distribution systems, Splice high voltage underground cable, Using pre-form kits. | L&C HB | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using necessary equipment, properly apply a Slip-On Splice and a Heat Shrink Spice to a single conductor, jacketed primary cable. | ||||||||||
| 18.3 * | Task Title: Underground distribution systems, Terminate high voltage underground cable. | Module #18; Underground Distribution Systems | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using necessary equipment, fabricate a cold shrink type termination and a tape termination to a single conductor, jacketed primary cable. | ||||||||||
| 18.4.1 | Task Title: Underground distribution systems, Inspect, Termination. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using necessary equipment, properly check terminations for serviceability and maintenance. | ||||||||||
| 18.4.2 | Task Title: Underground distribution systems, Inspect, Underground splices. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using necessary equipment, properly check underground splices for serviceability and maintenance. | ||||||||||
| 18.5 ** | Task Title: Underground distribution systems, Perform High Potential DC Test on Underground Cable. | Module #18; Underground Distribution Systems | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using a high potential test set (hy-pot) and a high voltage fault locator (thumper), perform a high potential DC Test on an underground cable. | ||||||||||
| 18.6 * | Task Title: Underground distribution systems, Troubleshoot underground cables for faults. | Module #18; Underground Distribution Systems | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using necessary equipment, troubleshoot duct housed and direct burial cable for opens, shorts and grounds; conduct locates using a megohmmeter in conjunction with a cable tracer/fault locator. | ||||||||||
| 18.7 * | Task Title: Underground distribution systems, Trace underground cables with a cable test set. | Module #18; Underground Distribution Systems | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using industry accepted trace equipment, trace the location and direction of direct burial cable. | ||||||||||
| 18.8 | Task Title: Underground distribution systems, Isolate system faults | L&C HB | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Use approved industry standards to properly and safely isolate (remove voltage from) a system fault. | ||||||||||
| 18.9 * | Task Title: Underground distribution systems, Fabricate load break elbow. | Module #18; Underground Distribution Systems | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using applicable load break elbow kit instructions, properly prepare for and install a load break elbow. | ||||||||||
| TASK #21 – LIGHTING SYSTEMS (STREET, SECURITY, RECREATIONAL) | ||||||||||
| 21.1.2 | Task Title: Lighting Systems (Street, Security, Recreational), Install, Quartz fixtures. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using applicable manufactures manuals and instructions, properly prepare for and install a Quartz Light Fixture. | ||||||||||
| 21.1.3 | Task Title: Lighting Systems (Street, Security, Recreational), Install, Lighting control components | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using necessary equipment, properly install per manufacture guidance a Central “type” lighting control (i.e. Time switch with an astronomical dial and Contactors controlled by a photo cell) and a Integral “type” control (i.e. Photo cells on each luminaire) on a designated lighting system. | ||||||||||
| 21.2.1 | Task Title: Lighting Systems (Street, Security, Recreational), Adjust, Controls. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Using applicable manufactures manuals and instructions, properly adjust time switch, contactor, and photo cell lighting system controls. | ||||||||||
| 21.2.2 | Task Title: Lighting Systems (Street, Security, Recreational), Adjust, Fixtures. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using applicable manufactures manuals and instructions, properly adjust street, security, and recreational light fixtures. | ||||||||||
| 21.3 | Task Title: Lighting Systems (Street, Security, Recreational), Re-lamp lighting system | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Using applicable manufactures manuals and instructions, properly re-lamp street, security, and recreational light fixtures. | ||||||||||
| 21.4 | Task Title: Lighting Systems (Street, Security, Recreational), Troubleshoot lighting system. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Using applicable manufactures manuals and instructions, properly troubleshoot and repair street, security, and recreational lighting systems. | ||||||||||
| TASK #23 – ELECTRICAL GROUND SYSTEMS | ||||||||||
| 23.2.1 | Task Title: Electrical ground systems, Install, Primary distribution system grounds. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | 22 | / | 2 | 6 | / | 8 | |
| Performance Objective: Using all necessary equipment, properly determine ground requirements and install on primary distribution systems. | ||||||||||
| 23.3.2 | Task Title: Electrical ground systems, Maintain, Primary distribution grounds. | Annual | 22 | / | 2 | 6 | / | 8 | ||
| Performance Objective: Using all necessary equipment, properly maintain the permanent grounds on a primary distribution system. | ||||||||||
| 23.4.2 | Task Title: Electrical ground systems, Test, Primary distribution system grounds | Annual | 22 | / | 2 | 6 | / | 6 | ||
| Performance Objective: Use portable ground testing equipment or the three-point method to determine the maximum permissible resistance for grounds and grounding systems. Resistance requirements will be predicated on departmental standards, ANSI C2 requirements, or the national electric code. | ||||||||||
| 23.5.1 | Task Title: Electrical ground systems, Troubleshoot, Primary distribution system grounds. | Annual | 22 | / | 2 | 6 | / | 8 | ||
| Performance Objective: Using all necessary equipment, troubleshoot the permanent grounds on a primary distribution system. | ||||||||||
| 23.5.1 | Task Title: Electrical ground systems, Troubleshoot, Primary distribution system grounds. | Annual | 22 | / | 2 | 6 | / | 8 | ||
| Performance Objective: Using all necessary equipment, troubleshoot the permanent grounds on a primary distribution system. | ||||||||||
| TASK #25 – TOOLS AND EQUIPMENT | ||||||||||
| 25.1.1 ** | Task Title: Tools & Equipment, Maintain, Hotline tools. | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 4 | |
| Performance Objective: Given appropriate hotline tools and Personal Protective Equipment (PPE), use materials such as dry tarpaulins, clean rags, hot-stick nonconductive pole cleaner, hot-stick wax, methyl ethyl kettle (MEK) or acetone, Epoxyglas Bond, and a DC hi-pot test set to inspect, maintain, and test hotline tools. Tested Hotline tools IAW American National Standards Institute/American Society for Testing Materials (ANSI or ASTM) standards. | ||||||||||
| 25.1.2 ** | Task Title: Tools & Equipment, Maintain, Rubber Personal Protective Equipment (PPE) | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given appropriate Personal Protective Equipment (PPE), use American National Standards Institute/American Society for Testing Materials (ANSI or ASTM) standards to properly inspect, maintain, and test rubber PPE. | ||||||||||
| 25.1.5 | Task Title: Tools & Equipment, Maintain, Reel jacks.. | Use agreed upon standards | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain reel jacks. | ||||||||||
| 25.1.7 | Task Title: Tools & Equipment, Maintain, Handline. | Use agreed upon standards | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain handlines. | ||||||||||
| 25.1.8 | Task Title: Tools & Equipment, Maintain, Block & tackle. | Use agreed upon standards | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain a block and tackle assembly. | ||||||||||
| 25.1.9 | Task Title: Tools & Equipment, Maintain, Chain hoist | Use agreed upon standards | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain a chain hoist. | ||||||||||
| 25.1.10 * | Task Title: Tools & Equipment, Maintain, Climbing equipment. | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given appropriate climbing equipment, use materials such as neutral soap, neatsfoot oil, a gaff gauge, a file and a cleaning cloth to properly inspect and maintain climbing equipment. | ||||||||||
| 25.4 | Task Title: Tools & Equipment, Test hotline tools. | L&C HB | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Use manufactures manuals and an industry approved portable hot stick tester to test hot line tools. | ||||||||||
| 25.5.12 | Task Title: Tools & Equipment, Use test equipment, Gas detector | Mfg Manual/Instr. | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given various scenarios, use manufacturer’s manuals and an industry approved gas detector to inspect confined spaces for combustible /toxic gases. | ||||||||||
| 25.5.14 * | Task Title: Tools & Equipment, Use test equipment, High voltage phase tester | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given various distribution and transmission circuits, use the high voltage phase tester to measure varying levels of AC voltage. | ||||||||||
| 25.5.18 | Task Title: Tools & Equipment, Use test equipment, Cable locator | Mfg Manual/Instr. | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given various scenarios, use manufacturer’s manuals and an industry approved cable locator to properly locate direct buried cable. | ||||||||||
| 25.5.20 | Task Title: Tools & Equipment, Use test equipment, High voltage audible indicator Performance Objective: Given various scenarios, use manufacturer’s manuals and an industry approved high voltage audible indicator to locate direct buried cable. | Mfg Manual/Instr. | Annual | 22 | / | 1 | 6 | / | 2 | |
| 25.6 * | Task Title: Tools & Equipment, Perform operator’s maintenance on aerial lift truck with insulated bucket Performance Objective: Given any commercially approved aerial lift truck with an insulated bucket, use manufacturer’s manuals & periodic maintenance standards to conduct pre, during, and post operational checks. | Module #25; Tools and Equipment | ||||||||
| 25.7 * | Task Title: Tools & Equipment, Perform operator’s maintenance on line maintenance truck | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given any commercially approved Line maintenance truck, use manufacturer’s manuals and periodic maintenance standards to conduct pre, during, and post operational checks. | ||||||||||
| 25.8 * | Task Title: Tools & Equipment, Operate aerial lift truck controls | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given any commercially approved aerial lift truck with insulated bucket, apply manufacturer’s guidance and safety precautions to transport, position, operate aloft, and reposition the aerial lift truck. Operational procedures should stress before and during bucket raising, working aloft, and ground operations. | ||||||||||
| 25.9 * | Task Title: Tools & Equipment, Operate line maintenance truck controls | Module #25; Tools and Equipment | Annual | 22 | / | 1 | 6 | / | 2 | |
| Performance Objective: Given any commercially approved line maintenance truck, apply manufacture guidance and safety precautions to transport, position, operate, and reposition the line maintenance truck. Operational procedures should stress boom use, power winch, and capstan use. |
&L&10XXXX AFB, XX
Attachment J43-1, Section 2&RContract # (TBD) &L&9* - Denotes 5-level UGT core tasks ** - Denotes 7-level UGT core tasks
&L&10XXXX AFB, XX
Attachment J43-1, Section 2&RContract # (TBD) &L&9* - Denotes 5-level UGT core tasks ** - Denotes 7-level UGT core tasks
&L&10XXXX AFB, XX
Attachment J43-1, Section 2&RContract # (TBD) &L&9* - Denotes 5-level UGT core tasks ** - Denotes 7-level UGT core tasks
&L&10XXXX AFB, XX
Attachment J43-1, Section 2&RContract # (TBD) &L&9* - Denotes 5-level UGT core tasks ** - Denotes 7-level UGT core tasks
Extracted tasked
| 17.9 | Task Title: Overhead distribution systems, Splice energized overhead conductor. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | / | / |
| Performance Objective: Given various scenarios use necessary safety and hot line equipment to safely and properly splice energized overhead conductors. | |||||
| 17.10 | Task Title: Overhead distribution systems, Replace conductor supports on energized conductors | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | / | / |
| Performance Objective: Use necessary safety and hot line equipment to properly replace a crossarm supporting energized conductors. | |||||
| 17.12 | Task Title: Overhead distribution systems, Transfer energized conductors from old pole to new pole. | AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities L&C HB | Annual | ||
| Performance Objective: After reaching a working position on the pole, use necessary safety and hotline equipment to properly transfer energized conductors from an old pole to an adjacent new pole. | |||||
| 17.13 | Task Title: Overhead distribution systems, Transfer energized conductors from old pole to new pole. | ||||
| Performance Objective: After reaching a working position on the pole, use necessary safety and hotline equipment to properly transfer energized conductors from an old pole to an adjacent new pole. |