SOW_R38 Equipment Inspection.pdf
PDF 5 MB Posted
- Solicitation number
- N4008526R0270
About this file
This is a Project Scope of Work document issued by NAVFAC MIDLANT PWD Earle dated May 28, 2026, for inspection and testing services at Naval Weapons Station Earle in Leonardo, New Jersey.
The contractor must provide comprehensive inspection and operational testing of fire protection equipment located in a 31ft x 41ft fire pump room at Building R38, Pier 3A. Work scope includes: (1) visual and fire damage assessment of diesel pumps, electric pumps, motors/engines, controllers, and associated piping for physical damage, corrosion, and heat degradation; (2) electrical and controller pre-start diagnostics including insulation resistance testing and battery system inspection; (3) mechanical pre-start inspection of pump shafts, bearings, and alignment; (4) engine and fuel system inspection; (5) no-flow and full-flow operational testing at 0%, 100%, and 150% of rated capacity with vibration analysis and thermal imaging; (6) controller operational testing including pressure drop simulation and alarm verification; and (7) inspection and maintenance of the oil/water separator including Phase 1 comprehensive inspection and conditional Phase 2 cleaning and servicing. All work must comply with NFPA 20, NFPA 25, UFC 3-601-02, UFC 3-460-01, EPA Clean Water Act, RCRA, and OSHA standards. The contractor shall submit comprehensive written reports within ten business days including inspection forms, performance curves, deficiency reports, fuel quality results, and corrective action recommendations. The project must be completed within eight weeks of award. The building must remain operational during work, and the contractor must coordinate daily access with the Contracting Officer. A Project Superintendent, Quality Control Manager, and Site Safety & Health Officer with specified qualifications are required, and a pre-work conference must be scheduled with the Contracting Officer's Representative at least five business days in advance.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 28, 2026
From: NAVFAC MIDLANT PWD Earle FEAD To: Regional Comptroller Office
Subj: PROJECT SCOPE OF WORK
Project Title: Inspection and Testing of Electric Fire pump and Motor/Engine, Diesel Fire Pumps, Controllers, and Oil/Water Separator at Building R38
Work Location: All work is located inside a room at building R38 in Naval Weapons Station Earle, 801 Hwy 36, Leonardo, New Jersey.
The room is a 31ftx41ft fire pump room located at Pier 3A in Naval Weapons Station Earle in Leonardo, NJ. The building must remain operational during the project. The contractor shall coordinate daily access to the building with the Contracting Officer prior to entry.
1. Objective and Scope
The contractor shall provide all labor, materials, equipment, and supervision to perform a complete inspection, operational test of the designated electric fire pump and motor, diesel fire pump, controllers and Oil/Water separator. All work must comply with the most current editions of all applicable regulations and standards. The objective is to ensure operational readiness, life safety compliance, and adherence to National Fire Protection Association (NFPA) and Unified Facilities Criteria (UFC) standards. All work shall conform to the safety requirements set forth in the most recent version of the Occupational Safety and Health Administration (OSHA), and Army Corps of Engineering EM 385-1-1 unless specified otherwise.
2. Reference Standards
All testing, inspection and disposal activities shall adhere to the following regulatory standards:
NFPA 20: Standard for the Installation of Stationary Pumps for Fire Protection NFPA 25: Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection
Systems UFC 3-601-02: Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection
Systems UFC 3-460-01: Design: Petroleum Fuel Facilities EPA Clean Water Act (CWA) Resource Conservation and Recovery Act (RCRA) Occupational Safety and Health Administration (OSHA) standards
3. Scope of Work: Diesel Fire pump, Electric Fire Pumps and Motor/Engines, controllers, and associated assemblies: The inspection and testing shall include, but is not limited to, the following: Due to the fire-damaged, the diesel equipment and the prolonged inactivity of the electric equipment, the contractor must complete all Pre-Start Diagnostics prior to energizing or operating the pumps. If critical faults are found during pre-start checks, the contractor shall notify the COR immediately and proceed to the required inspection method based on discovered findings. The Inspection and Testing shall include but not limited to:
3.1. Visual and Fire Damage Assessment:
3.1.1. Inspect the diesel pump, the electric pump and motor/engine, controllers, and piping for physical damage, corrosion, or leaks.
3.1.2. Inspect all rubber components including but not limited to belts, hoses, seals, gaskets for heat degradation, melting, or brittleness.
3.1.3. Conduct a borescope inspection to ensure no soot, ash, or debris was ingested during the recent fire.
3.1.4. Verify all valves are in the correct open/closed position and secured.
3.2. Electrical & Controller Pre-Start Diagnostics:
3.2.1. Inspect the internal contacts of the electric fire pump controller for corrosion, pitting, or seizing due to prolonged inoperativeness.
3.2.2. Conduct an insulation resistance test on the electric motor windings and feeder cables prior to energizing the equipment to verify insulation integrity after prolonged inactivity.
3.2.3. Inspect the dual battery starting system, clean terminals, check electrolyte levels, and verify the operation and charging rate of the battery chargers.
3.2.4. Confirm the engine block heater is functioning.
3.3. Mechanical Pre-Start Inspection and Diagnostics:
3.3.1. Manually inspect both the electric and diesel pump shafts to ensure bearings are free-moving and impellers are not seized prior to applying power. Remove and inspect both diesel and electric pumps shaft as required. The shafts are at least 25ft deep from R38 floor level into the Bay. It is strongly recommended that the contractor should verify all equipment and dimensions in field prior to bidding the contract to avoid unforeseen site conditions.
3.3.2. Inspect shaft alignment, coupling, and guards.
3.3.3. Check lubrication of pump and motor bearings.
3.3.4. Verify the cooling water line to the engine is unobstructed.
3.4. Engine & Fuel System Inspection:
3.4.1. Inspect fuel lines, hoses, and filters. Check engine oil and coolant levels.
3.4.2. Inspect exhaust system for leaks or damage.
3.4.3. Conduct a visual inspection of the fuel quality and check for water in the fuel system. Verify the fuel tank is at least two-thirds (2/3) full.
3.5. No-Flow Operational Test:
3.5.1. Ensure a qualified technician is stationed directly at the controllers with an emergency stop plan during initial start-up, given the unknown internal condition of the equipment.
3.5.2. Run the pump under no-flow conditions for the minimum duration required by NFPA 25.
3.5.3. Perform baseline vibration analysis on the pump and motor/engine bearings during operation to identify internal wear, misalignment, or bearing degradation.
3.5.4. Utilize an infrared thermal camera during the test to monitor the electric motor casing, engine block, bearings, and electrical switchgear for abnormal hot spots.
3.5.5. Record starting pressure, churn pressure, motor voltage and amperage, engine RPM, oil
3.5.6. Pressure, and coolant temperature.
3.5.7. Verify packing gland performance and check for unusual noise or vibration.
3.6. Flow Operational Test:
3.6.1. Conduct a full flow test at 0%, 100%, and 150% of the pump's rated capacity using approved flow meters or hose streams.
3.6.2. Continue thermal imaging and vibration monitoring during peak load testing.
3.6.3. Plot the test results against the manufacturer's original pump curve. The fire pump shall be considered to have failed the test if it cannot deliver at least 95% of the flow and pressure showed on the original, unadjusted manufacturer's certified pump curve, as per NFPA 25.
3.7. Controller Operational Test:
3.7.1. Simulate a pressure drop to verify automatic start capabilities.
3.7.2. Test manual start/stop functions.
3.7.3. Verify the operation of all alarms and supervisory signals to the fire alarm control panel
(FACP).
3.8. Upon completion of the inspection and testing, the contractor shall provide a comprehensive written report within ten (10) business days. The report shall include:
3.8.1. Completed Inspection Forms: Standardized NFPA 25 or DoD-equivalent inspection and testing forms.
3.8.2. Performance Curve: A plotted graph comparing the current flow test results against the original factory pump curve.
3.9. Deficiency Report: A detailed list of any discrepancies, degraded components, or critical failures discovered during the inspection.
3.9.1. Fuel Quality Report: Results of any required diesel fuel testing, noting the presence of water, microbes, or degradation.
3.9.2. Corrective Action Recommendations: Proposed solutions and cost estimates for required repairs to restore the system to full operational readiness.
4. Scope of Work: Inspection and Maintenance of Oil/Water Separator (OWS): The Inspection and
Testing shall include but not limited to:
4.1. Phase 1: Comprehensive Inspection
4.1.1. The contractor shall perform a thorough inspection to assess the operational status and waste accumulation levels of the OWS.
4.1.2. Secure the work area with appropriate barricades and signage.
4.1.3. Conduct a visual site assessment of the area surrounding the OWS for any signs of leaks, spills, or structural issues.
4.1.4. Implement Lockout/Tagout (LOTO) procedures for any associated electrical pumps or automated sensors before opening the OWS vault.
4.1.5. Internal Assessment:
4.1.5.1. Measure and document the depth of the free-floating oil layer and the accumulated bottom sludge/sediment layer.
4.1.5.2. Inspect the condition of the coalescing media (plates or tubes) for fouling or sediment buildup.
4.1.5.3. Clean and test all electronic level sensors, float switches, and visual/audible alarms to ensure they accurately report high-oil or high-water levels.
4.1.6. Reporting and Decision:
4.1.6.1. The contractor shall provide an immediate report of inspection findings to the Contracting Officer's Representative (COR).
4.1.7. The contractor shall execute Phase 2 if:
4.1.7.1. The accumulated bottom sludge exceeds 50% of the separator's design capacity.
4.1.7.2. The free-floating oil layer exceeds 80% of the separator's design capacity.
4.1.7.3. The inspection reveals a critical malfunction or fouling that impedes proper operation.
4.1.7.4. The service is required for the operation of the Oil-Water separator.
4.2. Phase 2: Cleaning and Servicing
4.2.1. Cleaning and Inspection:
4.2.1.1. Perform high-pressure washing of the OWS interior walls, baffles, and coalescing media. Care must be taken not to damage the equipment.
4.2.1.2. Extract all residual wash water and dislodged solids.
4.2.1.3. Conduct a thorough visual inspection of the now-empty OWS. Check for cracks, structural degradation, corrosion, or leaks. Inspect internal baffles and piping for damage.
4.2.2. System Recharge:
4.2.2.1. Upon completion of cleaning, refill the OWS with clean water to re-establish the proper operating level and water seal.
4.2.2.2. Verify the system is ready to receive normal effluent.
4.3. Upon completion of the service, the contractor must provide a comprehensive written report to the Contracting Officer Representative (COR) and the Environmental (EV) Office within ten (10) business days. The submission shall include:
4.3.1. Waste Manifests: Legible copies of all non-hazardous or hazardous waste manifests (e.g., EPA Form 8700-22) documenting the volume of waste removed, the transport entity, and the final authorized disposal or recycling facility.
4.3.2. Service Report: A detailed log of the cleaning process, including the date, time, volume of liquids/sludge removed, and the condition of the coalescing media.
4.3.3. Deficiency Report: A list of any structural defects, compromised baffles, or failing sensors identified during the inspection, accompanied by photographic evidence.
4.3.4. Corrective Action Recommendations: Proposed solutions and cost estimates for required repairs to restore the OWS to optimal condition.
4.3.5. The contractor must coordinate with the Contracting Office’s Representative (COR) prior to the removal of any waste to ensure manifest sign-off procedures are followed correctly.
4.3.6. If personnel must enter the OWS vault for inspection, all work must strictly adhere to OSHA regulations, including continuous atmospheric monitoring and retrieval systems.
4.3.7. The contractor must maintain adequate spill response materials on-site during pumping/removal operation
5. Safety and Coordination
5.1 The Contractor shall coordinate with the Contracting Officer’s Representative (COR) prior to taking the fire pump offline or initiating tests that may trigger facility alarms.
5.2. Appropriate Lockout/Tagout (LOTO) procedures must be followed during electrical and mechanical inspections. Hearing protection shall be used during engine operation.
5.3. Proper procedures must be followed for the handling and disposal of any hazardous materials, including diesel fuel, engine oil, coolant, and battery acid, in accordance with installation environmental policies.
6. All contaminated materials, including used absorbents, and recovered oil, coolant, and potentially contaminated fuel or cleaning materials shall be placed in clearly labeled, sealed containers. Contractor will be responsible for the transportation and disposal of all waste in accordance with all applicable regulations. The project is complete upon receipt of a successful clearance report and final approval from the Contracting Officer. The contractor shall include photo- as-found conditions in all reports.
7. The government strongly recommends that prior to submitting a proposal the Contractor should make a site visit and become familiar with the field conditions, scope of the work, and all requirements for completing the contract scope. The Contractor should examine the site with respect to the work to be performed to ascertain all factors that would affect the cost of the work to the extent that such information is reasonably obtainable.
8. The Contractor is responsible for initiating, maintaining, and supervising all safety precautions in connection with the Scope of Work. The Contractor shall coordinate with the Contracting Officer for utility supply disconnect. Requests shall be sent to the Contracting Officer three business days prior to the start of work.
9. Any damage to existing features to remain and new work shall be repaired or replaced in-kind at the Contractor’s expense. All waste shall be disposed of in accordance with New Jersey Department of Environmental Protection’s regulations.
10. Contractor’s staging area is to be designated by Contracting Officer. Sidewalks area shall be kept clear of debris and open for use at all times. At the end of each workday, the Contractor shall clean the affected area so as not to pose a safety hazard.
11. The Contractor shall submit any/all submittals as required by the contracting officer for government approval, prior to the start of activities in this scope of work.
12. This project requires a Project Superintendent, a Quality Control (QCM) Manager and a Site Safety & Health Officer (SSHO). The same individual may be the Project Superintendent/Quality Control (QCM) Manager/ and Site Safety & Health Officer. However, that individual shall meet the qualification requirements of each position. The Contractor shall have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, the Quality Control (QC) representative shall also have fluent English communication skills.
SSHO shall meet the qualifications as outlined in EM 385-1-1 Appendix A, Section 1 and shall demonstrate a minimum of two years of experience as a project Safety Representative with no loss time incidents on assigned projects. Contractor shall provide the COR with a statement of qualifications in a letter to the Government for the SHHO.
13. Prior to the start of work, conference shall be attended by the Contractor’s project manager/ the site superintendent. Coordinate the conference with the Contracting Officer’s representative a minimum of five (5) business days in advance. The conference is required to discuss various aspects of the project and specific security and safety regulations at Naval Weapons Station Earle.
14. The Contractor shall submit labor hour’s log for the Contracting officer’s review and record. The Log can be submitted from start to end of the project.
15. The Contractor and his employees shall become acquainted with and obey all Government regulations as posted, or as requested by the Contracting Officer. Smoking is prohibited unless it is designated as smoking area.
16. The Government's regular (normal) working hours are from 0700 to 1530 (7:00 a.m. to 3:30 p.m.)
Mondays through Fridays except on (a) federal holidays and (b) other days specifically designated by the Contracting Officer. Federal holidays are New Year's Day, Martin Luther King, Jr. Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.
The Contractor will not be allowed to escort deliveries and workers into base. All Contractors entering the Base will need a badge. The Contractor shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS), or by obtaining passes each day from the Base Pass and Identification Office. There is no cost for obtaining passes through the DBIDS. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge. The contractor shall submit all paperwork required by security for the employee access to the COR. The process of have a person cleared for access may take 14 business days. DBIDS Program: DBIDS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. Under the DBIDS program, commercial vehicle inspection is required, including situations of Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on requirements to participate and enroll in DBIDS is available at http://dbids.dmdc.mil/ or by calling 1-800-372-7437. One-Day Passes:
Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS. Work outside regular working hours requires Contracting Officer approval. Project shall be completed 8 weeks from the date of award.
17. Attachment:
17.1. Pictures
17.2. Existing drawings: Supplementary for reference only
Azeb Hailu, P.E.
Engineering Tech.
Public Works Department Earle
201 State Highway 34, Bldg. C-9, Colts Neck, NJ 07722 Office: 732-866-2396, Cell: 617-943-7796 Email azeb.a.hailu.civ@us.navy.mil
17.1. Pictures:
Picture-1: Deisel Pump system after fire damage
Picture-2: Electric pump system
17.2. Existing Drawings: All existing drawings are supplementary for reference only
D
C
B
I
I
O') co IO')
500kW
DIESEL
GENERATOR
SET
Ll) "<I" "<I"
AIR
COMPRESSOR
�I q I
STEAM/WATER
HEAT EXCHANGER
40� _/ CONDENSATE 860kPa TO 35 kPa
COOLER
PRV STEAM STATION
I\
0 co
1220 I / CONTROL UNIT
"I o
DIESEL
ENGINE
y r<) N
JOCKEY PUMP
[7 815
(P-1)
ELECTRIC
PUMP
(P-2) ,,--DIESEL
PUMP 1120
r<)
'-----I 1-_J _--/'----_,_ (P-3) I
OIL WATER
SEPARATOR
(Q) N --
�'----I----'
WASTE OIL STORAGE
TANK
I
I
0r-co
I I
BOILER AND FUEL
TANK ROOM
JOCKEY PUMP
CONTROLLER
r l
1PANEL PR-2
���=,i
, ---'-1'--J § �rL......./lf-----1 ,ll
'll-+
------1-
DIESEL 1 _____J
j i- /--=8-=-85=----i
PUMP_/
�suMP
TP-1
TRANSFER PUMP
1770 /
I I I
(2) VERTICAL 1/RECIRCULATION /
PUMPS (P4&P5)_v
920/
I N "<I"
TANK
FIRE PUMP ROOM PLAN
1 :40
__J /200A PUMP ROOM
PANEL
I I
FIRE PUMP
CONTROLLER
PANEL
DETAIL 1
1 :20 M341 M341
SP-1
SUPPORT DETAIL
4 REQ'D
(TYP.)
20mm PLATE
(TYP.)
12mm PLATE
(TYP.)
..J 6
16¢ ANCHOR BOLTS
(TYP.)
DETAIL 2
1 :5 t.4341 M341
II
Ll) l I
SUMP
j
SECTION A SECTION B
1 :5
1 :20 t.4341 M341 t.4341 t.1341
NOTE
1. FOR PUMP CONTROLLERS SEE DWG. NO. E-344.
2. FOR EQUIPMENT SCHEDULE SEE DWG. NO. M-347.
3. CONTRACTOR TO VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION.
4. FINAL CONNECTIONS TO SELECTED EQUIPMENT IS RESPONSIBILITY OF CONTRACTOR.
0 100 1 5 �----: ____ _
0 500 1 :20 �- i::::::-
0 1000 1 :40 �- i::::::-
I
I
I
GRAPHIC SCALES
CHECK BEFORE USE
500mm
2000mm I
4000mm I
GHPA
HAN-PADRON ASSOCIATES
ENGINEERS
APPROVED
AClMlY - SATISFACTORY TO
DAlE
APPROVED
FOR EFD FOR COMMANDER NAVFAC
DAlE
A/E EFD
A.M. DESIGN
T.B. DRAWN
S.M. REl<EW
B.P. QC
Y.G. CHIEF ARCH./ ENGR.
PROJECT MANAGER G.R.
FIRE PROTECTION
BRANCH MANAGER
DESIGN DIRECTOR
:,; --, " z z
_J � 1--:> (ii 0 u z z w wz z � � r-� � ffi (/) (/) z w
� c., 0 w z u
� <( w :r: 0::
� I-w 0::
- 0:::
;i 0 u
�z
<( 1--� l""JZ " ....J w
�� a..
o::�
W CL
I-w CL ::J u e:::: ,8 <( 0 X
<( c., ....J w
I") z w w ....J wo LL _J_j
_J a.. 1---0:: (/) ::J c.., c5 � wen z z
0::
_J
0::: 0 t--o w � u 0::
w f-' 1--jz (/) z
(/) e::::
w c.., z u ec Z 0 w ls w o_ - � c5 a.. !z s: _J w 1--::, 0:: _J ::J he w � 11:
f-w 1:l " _J z
CODE ID. NO. 80091 SIZE D
SCALE: AS NOTED
EFD NO.
STA. PROJ. NO.
SPEC. NO. 04-02-0018
CONSTR. CONTR. NO.
N62472-02-C-0018
NAVFAC DRAWING NO.
2220930
SHEET 450 OF 673
M-341 DRAWFORM REVISION �y 2000
D
C
B
A azeb.hailu Polygon azeb.hailu Polygon azeb.hailu Polygon azeb.hailu Polygon
D
C
B
0, :::l c
I :'!
A :'!
I
G:
c I
G:
UTILITY CONTROL BUILDING
50¢ CIR
SALT WATER SUPPLY
TO GALLERY
EL. +5.500
ST WITH 80mm
INSULATION
150w PW fr
ST t EL. +4.21 D •
SW t EL. +3.820
BW t
V3127
300¢ i--::::::::::...-i
P-2
;J VARIES
EL. +4.015
SEW INV. EL.
EL. +1.750
MLW EL. 0.000
�-t,�
1067¢ PIPE PILE
(TYP.)
SECTION A
1 :40 M342 t.1343
V3135
300x250 REDUCER V3131
V3140
V3129
V3123
SEE DET.1
50¢ FROM
HEAT EXCHANGER
CAISSON
750x500 REDUCER
750¢ PIPE
EL. -6.630
<;iii' 2700 2000 1 870 1-------='--=-"------i------==::__ __ _,__ __ ---'--".�---'
50¢ CIR HOT
300¢ SALT WATER 50¢ P.W.
FROM PUMP ROOM TO P MP ROOM
V3045 0 r--
V3047
SALT WATER RETURN
TO HEAT EXCHANGER
50¢ CIR HOT SALT
WATER SUPPLY FROM
HEAT EXCHANGER
SECTIONAL PLAN
1 :40
DETAIL E
1 :40 M303 t.1343
E M343 t.1343
300¢ SALT WATER
WITH 80mm
INSULATION
3 4 5
150x1 OD REDUCING TEE
V3125 VENT TO ATMOSHPERE
V3131 V3135
PV3001
P-1
250¢
FROM BOILER SLOWDOWN
(PIPED DIRECT TO SEPARATOR)
CONDENSATE COOLER
COLD WATER SUPPLY
TEMPERATURE
REGULAR VALVE
AIR
COMPRESSOR
V3137
50¢
DR IN
CONNECT 80w CONDENSATE
PIPE TO THE SEWER MAIN. SEE HEAT EXCHANGER
DWG M-303 fu
(8) 20¢ ANCHOR BOLTS ON
PLATE EMBEDDED IN CONCRETE
OPENING DIA "D" SEE NOTE 1
D = PUMP SUCTION HEAD
SCREEN DIA + 50mm
I 11 I
BUBBLER CONNECTION
25 ALL
-l-1--- AROUND
N I')
BASE PLATE (SEE NOTE 1)
15¢ CAISSON
PUMP COLUM;J
TURBINE PUMP SUPPORT BASE
1 :20 TYPICAL FOR P-1, P-2 AND P-3
15x100 BAR WELDED TO PIPE CLAMP PROVIDE 50mm
CHAMFER BOTH ENDS 120·
15¢ PIPE FOR BUBBLER SYSTEM
SEE DWG. M-6, NOTE 12
PV3002
P-2
DIESEL
TANK V3129
V3133
/ PV3003
V3150
FOR CONTINUATION
SEE SECTION 'C'
SECTION B
1 :40 M342 M343
750x500 REDUCER
750¢ PIPE
6.630
SUMP
PUMP
MLW EL. 0.000
750x500 REDUCER
750¢ PIPE
EL. -6.630
OIL WATER SEPARATOR
SUPPORT STAND
WASTE OIL STORAGE TANK
CURB
600x350 REDUCER 10mm MAX RADIUS
MORE
1 □¢ BOLT EL. +5.500 fr
600¢ PIPE
TO BE UP TIGHT
PUMP SHAFT
50¢ WITH 50mm
INS SALTWATER
SUPPLY
2�CTION@�
CAISSON SPIDER
FOR CONTINUATION
SEE SECTION 'B'
NOTE 1
CONTRACTOR SHALL PROVIDE
BASE PLATE OF APPROPRIATE
DIMENSIONS AND OPENING AT
CENTER FOR ALL TURBINE
PUMPS SELECTED.
-- • 1 •
FIN 1 ST FL.
EL. +5.500
� .// ,,/ I h----------,. " h----------h---
______________j
I
300x300x300 TEE
(TYP.)
SECTION D
1 :40 M343 t.1343
V3045
EL. +3.820
1�:
ST EL. +4.210
L()
SUMP
PW EL. +4.370
// BW t EL. VARIES
----+-'---I--� @ _/
SW EL. +3.820
0) //
1------------f'J-+--I/•
EL. + 1.750
MLW EL. 0.000
� ---� 1 - _/ ---
SECTION C
1 : 40 M342 M343
1 :20
1 :40
0 500 1000 ���-"rl.-�---�---1
0 1000 2000 ���-"il.-�---�--�1
GRAPHIC SCALES
CHECK BEFORE USE
3 4 5
2000mm I
4000mm I cj ,.
>' t
C s z
C
®HPA
HAN-PADRON ASSOCIATES
ENGINEERS
APPROVED
ACTIVTTY - SATISFACTORY TO
DATE
APPROVED
FOR EfD FOR COMMANDER NAVFAC
DATE
A/E EFD
S.R. DESIGN
T.B. DRAWN
S.M. REVIEW
B.P. QC
Y.G. CHIEF ARCH./ ENGR.
PROJECT MANAGER G.8.
FIRE PROTECTION
BRANCH MANAGER
DESIGN DIRECTOR
C z z (fJ � :;; _J "' __J �
"' &i u z z z � � r-� 0 ffi en (/) z � 0 � � 0 w z u � <( w :r:
i:l I-w (fJ
- 0:::
;j 0 u z
�z
<(o J nl-<
....J u
�� 0:: w a.. w (fJ
I- w [L <..?
0:::: z u ,-
<( [L
X <( [L w w w ....J Wz
LL _J-___J
a..
1-0
L:'i (fJ _J
0 � w-0:: ::,z z
1-m 0:::
u _J w 0 w iZ (/) 0::
0::::
I-
(/) z w0 z w 0 i!cZ 0 ls w (L - u L:'i a.. !z s: � w _J "' "' ___J
Ir w � I-� f--w I{] <( C ..J z
CODE ID. NO. 80091 SIZE D
SCALE, AS NOTED
EFD NO.
STA. PROJ. NO.
SPEC. NO. 04-02-0018
CONSTR. CONTR. NO.
N6 2472-02-C-0018
NAVFAC DRAWING NO.
2220932
SHEET 452 OF 673
M-343
DRAWFORN REVISION MAY 2000
D
C
B
A
File details come from the government source that posted it. Updated .