SOW.pdf

PDF 664 KB Posted

Attached to
Bulk Fuel Delivery Services
Solicitation number
375739
Issued by

About this file

This Statement of Work (SOW) details bulk diesel fuel delivery services for the Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The subcontractor will be responsible for delivering #2 ultra-low sulfur off-road diesel fuel (summer and winter blends), diesel exhaust fluid (DEF), and lithium grease tubes, with specific requirements including delivering fuel via metered trucks, providing winter blend mix from October 15th through April 15th, and ensuring fuel meets A.N.S.I./A.S.T.M. D975 standards.

Key deliverables include providing delivery tickets for each shipment, maintaining DOT Hazardous Material Certification, and ensuring staff are licensed to operate fuel delivery trucks in South Dakota. The subcontractor must follow strict environmental safety and health protocols, provide personal protective equipment, and perform deliveries on a regularly scheduled basis as determined by the FFDG Technical Representative. Emergency deliveries must be completed within 12 hours of request, and the subcontractor will be responsible for all transportation requirements associated with the service. The contract is managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science.

View the file

Other files

File Type Posted
EXHIBI1.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
SARC_Subcontractor Annual RepsCerts Rev 4.pdf PDF
Pricing_Sheet_SD_Diesel_1002_2025.xlsx XLSX spreadsheet
PR 375739 Bulk Fuel Delivery Service.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US

October 20th, 2025

Document Number: DocDB 35071

FDC Bulk Diesel Fuel Delivery Services Statement of Work (SOW)

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page ii

Signatures Required Signature & Date Approved

Originator: Michael Pfaff, LBNF/DUNE-US I&I Services Manager

Approver: Michael Andrews, LBNF/DUNE ES&H Manager

Approver: Kevin Fahey, LBNF/DUNE Quality Assurance Manager

Approver: Charles Dougherty, Senior Procurement Officer

Approver: Kurt Vetter, LBNF/DUNE-US Project Manager

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page iii

This document can be identified by the revision date as indicated in the Version Control Table below.

The current FFDG storage location for this document is also included in the table below.

Author Revision Date Description of Changes

Steve Whiteaker 08/27/2025 Original DRAFT

Steve Whiteaker 09/25/2025 Collaborative edits

Michael Pfaff 10/20/2025 Content updates

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page iv

Document Approvals .................................................................................................................................... ii

Revision History ........................................................................................................................................... iii

Table of Contents ......................................................................................................................................... iv

List of Figures ................................................................................................................................................ v

List of Tables ................................................................................................................................................. v

Acronyms and Abbreviations ....................................................................................................................... vi

1 Introduction ....................................................................................................................................... 1-1

1.1 Background .................................................................................................................................... 1-1

1.2 Purpose of SOW ............................................................................................................................. 1-1

1.3 Assumptions ................................................................................................................................... 1-2

1.4 Timeline .......................................................................................................................................... 1-2

2 Applicable Documents ....................................................................................................................... 2-2

3 SOW Performance Requirements ...................................................................................................... 3-2

3.1 General Requirements ................................................................................................................... 3-3

3.2 Non-Labor Scope ............................................................................................................................ 3-3

4 Required Tasks ................................................................................................................................... 4-4

4.1 Task 1: Environmental Safety and Health (ESH) ............................................................................ 4-4

4.2 Task 2: Quality Assurance / Quality Control .................................................................................. 4-6

4.3 Task 3: Project Schedule ................................................................................................................ 4-7

4.4 Task 4: Bulk Diesel Fuel, DEF & Lithium Grease Tube Delivery ..................................................... 4-7

4.5 Training and Supplies ..................................................................................................................... 4-8

5 Deliverables ........................................................................................................................................ 5-8

5.1 ......................................................................................................... 5-8

5.2 Format for Documentation and Deliverables ................................................................................ 5-8

6 Periodic Communication .................................................................................................................... 6-9

7 Transportation ................................................................................................................................... 7-9

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page v

Figure 1: DOE Underground Leased Space at SURF ................................................................................... 1-1

Table 1. Deliverables .................................................................................................................................. 5-8

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page vi

Acronym Definition

DUNE Deep Underground Neutrino Experiment

LBNF Long Baseline Neutrino Facility

SURF Sanford Underground Research Facility

FFDG Fermi Forward Discovery Group, LLC

FDC Far Detector & Cryogenics

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 1-1

1.1 Background

The Deep Underground Neutrino Experiment (DUNE) at the Long Baseline Neutrino Facility (LBNF) was borne out of the 2014 U.S. Particle Physics Project Prioritization Panel (P5) recommendations. The recommendations called for formation of a truly international collaboration for constructing a US-based long-baseline neutrino oscillation experiment with a powerful neutrino beam (~MW scale), a massive liquid argon TPC (40 kt) sited several hundred kilometers downstream of the neutrino source and deep underground, and a smaller detector just downstream of the beamline. Together these elements will have the capability to unambiguously determine the neutrino mass ordering, search for CP violation in the lepton sector, search for proton decay, and observe neutrinos from core collapse supernovae.

The LBNF/DUNE-US Project is the DOE-funded construction project to create the facility and contribute US scope to the international DUNE Collaboration. The major participants in the overall LBNF/DUNE enterprise are the international DUNE collaboration, the LBNF/DUNE-US construction project, the DOE, international funding agencies, Fermilab (in Batavia, Illinois) as the host laboratory, and the Sanford Underground Research Facility (SURF, in Lead, South Dakota), where the far detector will be located.

Figure 1 illustrates the general underground work area at the SURF (far) site.

1.2 Purpose of SOW

FDC Bulk Diesel Fuel Delivery to supply diesel fuel, diesel exhaust fluid (DEF), lithium grease tubes and the associated delivery services in support of the required equipment needed for cryostat installation.

This SOW covers the delivery of #2 ultra-low sulfur off-road diesel fuel (summer and winter blends), lithium grease tubes and diesel exhaust fluid (DEF) suitable for use in compression ignition internal

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 3-2 combustion engines, which includes fork trucks and heavy equipment operated at the SURF site in Lead, South Dakota.

1.3 Assumptions

The Subcontractor shall be responsible to the Laboratory for the acts and omissions of their employees, agents or sub-tier Subcontractors.

The SURF delivery location for the aboveground fuel storage tank is located at Ross Yard, 100 Ross Rd, Lead SD 57754.

FFDG will provide the above ground fuel tank(s), located on the surface at the SURF site. The Subcontractor will not be required to provide a tank.

The FFDG FDC Technical Representative is the point of contact for this subcontract.

The FFDG FDC Technical Representative shall ensure Subcontractor compliance with all ESH safety regulations during the delivery of the product and shall oversee the unloading of diesel fuel into the storage tank.

1.4 Timeline

An official Kick-off Meeting (KOM) will be scheduled at a mutually agreed upon date, time, and location as soon as practical after award of subcontract. The primary purpose for this meeting is to confirm that the project participants understand the terms and conditions of the subcontract, the SOW, the specifications, the safety and the quality assurance requirements, and the work activities involved with each task.

Estimated annual usage for diesel fuel, DEF, lithium grease tubes and deliveries can be found in the FFDG provided pricing list.

The Subcontractor shall furnish all properly qualified management, personnel, facilities, materials, supplies, tools, transportation, and equipment with appropriate accessories (except as provided by FFDG) and shall plan and coordinate with FFDG FDC Technical Representative to assure effective performance of all services described in this SOW.

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 3-3

3.1 General Requirements

Off-road diesel fuel shall be delivered to the SURF site in metered trucks. Subcontractor shall also deliver grease tubes and DEF. All deliveries shall be in accordance with U.S. Department of Transportation and all state/local regulations as required by the State of South Dakota.

3.2 Non-Labor Scope

Diesel Blend

The diesel fuel oil classification is to be grade number 2D and shall contain less than 0.5% sulfur.

The Subcontractor shall supply winter blend mix from October 15th through April 15th of each contract year. Any adjustments to this schedule shall be initiated and coordinated by the FFDG FDC Technical Representative.

The winter blend mix shall be a blend of fuel oil #1 (kerosene) and fuel oil #2D (ultra-low sulfur diesel) and the Subcontractor shall be responsible to blend the two fuels prior to delivery.

The diesel fuel shall be clear hydrocarbon oil free from suspended water and free from sediment or suspended foreign matter. Analyses shall be in accordance with currently recognized testing procedures in compliance with the most current version of A.N.S.I./A.S.T.M. D975.

The diesel fuel shall be dyed in compliance with all federal and state regulations for off-road use diesel fuel.

Diesel Exhaust Fluid (DEF)

Provided in 2.5-gallon containers.

Product temperature shall not be allowed to fall below manufactures recommendations.

Must meet ISO 22241 specification

Grease Tubes

NLGI #2 lithium grease

Provided in 10-tube cases.

Diesel Fuel Delivery Vehicle

Subcontractor shall conduct thorough pre-trip and post-trip inspections. Regularly check the condition of hoses and couplings, replacing any that are worn or damaged.

Subcontractor shall ensure all hazardous material placards and vehicle markings are clean and legible.

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 4-4

FFDG has the right to refuse delivery on metered trucks with broken calibration seals.

The Subcontractor can be charged the added cost of obtaining #2 ultra-low sulfur diesel fuel from an emergency source until the defective metering device has received the necessary certification.

The fill hose/nozzle from the tank truck to the storage tank shall have a static wire or its equivalent to prevent static discharge and shall be equipped with a non-ferrous nozzle or tight connection nipple.

The fill hose, when attached to the tank vehicle, shall be considered part of the tank vehicle.

Fuel delivery truck shall be equipped with a water separator and filter, to ensure clean fuel delivery and prevent water contamination.

Each tank truck or tank wagon shall carry a fire extinguisher suitable for extinguishing oil fires.

Such fire extinguisher shall carry a testing and listing label giving the extinguisher a rating for Class A and B fires.

4.1 Task 1: Environmental Safety and Health (ESH)

A part of the Exhibit A For Supply and/or Services Subcontracts the Environmental, Safety, and Health Certification (ESHC) form will be provided to the Subcontractor for signature, indicating that the Subcontractor understands the requirement to comply with the following:

10 CFR Part 851, DOE Worker Safety and Health Program

29 CFR 1910 OSHA Standards

The Subcontractor and sub-tier subcontractors shall comply with industrial hygiene and FFDG requirements.

Listed below are the on-site safety procedures where the risk of fire or spill is highest, during fuel dispensing.

Site assessment: Before beginning, visually inspect the site for any potential hazards. Look for ignition sources near the fill area, excessive vegetation, or unsecured fill caps. In winter, check that access ways are free of ice and snow.

Vehicle positioning: Park the truck to allow safe and easy access to the fill port without stretching hoses.

Ignition control: Prohibit smoking, open flames, or other ignition sources in the fueling area.

Avoid using electronic devices like cell phones while fueling.

Dispensing process:

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 4-5

Grounding/Bonding: Establish a secure ground between the truck and the stationary tank.

Containment: Place a drip/spill pan underneath the fill port to catch any minor spills or drips.

Tank verification: Before unloading, confirm that the fuel is being delivered into the correct tank and that the tank has enough capacity. Never fill "blind fills" where the capacity cannot be verified.

Monitoring: The driver must remain at the nozzle for the entire fueling process and never leave the dispensing unattended.

Emergency response: Keep a spill kit easily accessible and be trained in emergency response procedures.

The Subcontractor shall take the following steps to prevent product spills, protecting the environment and avoiding costly cleanups.

Subcontractor shall notify FFDG Technical Representative of any and all spill events.

Check tank levels: Always gauge the storage tank to determine the available capacity before delivery. Double-check the delivery ticket to ensure accuracy.

Manage flow: Limit the delivery rate to match the tank's vent capacity. This prevents tank rupture and releases.

Never top off: Overfilling is prohibited. Stop dispensing as soon as the automatic shut-off clicks off.

Inspect receiving equipment: Check that the tank's overfill prevention devices are working correctly and that all fill and gauge caps are secure and clearly marked.

The Subcontractor and any sub-tier Subcontractor performing work at SURF will be responsible for the following safety requirements.

The Subcontractor shall be responsible for assuring that their employees and sub-tier Subcontractor employees, who do not speak English, understand all ES&H requirements. The Subcontractor must be able to communicate any necessary instructions to those employees.

All Subcontractors/Subcontractors performing work at SURF shall provide to their employees any necessary ES&H training as may be required by federal/state regulations, and as appropriate for their Subcontract activities at Sanford Underground Research Facility (SURF).

Exceptions involve hazards which are unusual for subcontractor employees. FFDG shall provide any training required that is specific to the SURF site.

Records of ES&H Training that were provided by the Subcontractor, or others, and received by Subcontractor employees performing subcontractor activities at SURF shall be available for review by FFDG.

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 4-6

Subcontractors shall maintain and provide to FFDG, any and all occupational safety and environmental records.

Safety Data Sheets (SDS) for any chemicals being brought on to the SURF site.

Records required to be maintained by federal/state regulation.

OSHA injury/illness logs, training records Inspection records Safety meeting minutes Incident investigations documentation

4.2 Task 2: Quality Assurance / Quality Control

In conjunction with the General Terms and Conditions Quality Requirements, unless otherwise specified by the work order or the FFDG FDC Technical Representative -site supervision will be responsible for the following.

All activities necessary to manage, control and document work to ensure compliance with the Subcontract requirements.

Ensuring adequate Quality Control services are provided for work accomplished on and off site by his/her organization, suppliers, sub-tier Subcontractors, technical laboratories, and consultants.

The work activities include safety, testing and inspection and all other functions relating to the requirements for quality work.

The quality and timely provision of material provided in this subcontract.

If the diesel fuel supplied is not giving satisfactory performance or requires an excessive amount of repair or maintenance to the equipment, the Subcontractor shall be notified in writing of the deficiencies.

After such notice, the Subcontractor shall correct the deficiencies within a reasonable time under the circumstances, with remediation complete within 24 hrs. and at no cost to FFDG.

The Subcontractor shall submit documentation to FFDG that the tank wagon delivery measuring meters are in compliance and have current State of South Dakota inspection and test certification seals.

The Laboratory reserves the right to have all measuring devices rechecked at any time during the life of the contract.

If measuring device rechecks disclose any discrepancy in the number of gallons shown on the delivery ticket and the actual number of gallons delivered, use of such equipment shall not be permitted until certification has been received from the State of South Dakota that the measuring device is accurate and/or has been corrected.

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 4-7

4.3 Task 3: Project Schedule

A normal delivery standard business hours and does not include off-hours, weekends or holidays.

Emergency deliveries shall be made within twelve (12) hours upon receipt of the FFDG request.

A special cartage rate shall apply for above referenced emergency deliveries and shall only be made upon FFDG request.

Recognized Lab holidays are as follows.

Martin Luther King Day (full day)

Memorial Day (full day)

Juneteenth (full day)

Independence Day (full day)

Labor Day (full day)

Thanksgiving Day (full day)

Day After Thanksgiving (full day)

Christmas Eve (half day)

Christmas Day (full day)

In addition to the scheduled holidays, expect various work stoppages due to extreme weather conditions.

On average, these additional work stoppages equate to approximately seven (7) days per year.

4.4 Task 4: Bulk Diesel Fuel, DEF & Lithium Grease Tube Delivery

Deliveries of diesel fuel, diesel exhaust fluid (DEF) and lithium grease tubes.

The Subcontractor shall deliver on a regularly scheduled basis, as determined by the FFDG FDC Technical Representative.

Any deliveries outside of the regular schedule shall only be permitted through direct coordination with the FFDG FDC Technical Representative.

The Subcontractor shall furnish one (1) delivery ticket for each delivery, which contains the following.

Company name

Driver name

Time/date

Gallons of diesel fuel, DEF and grease tubes delivered

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 5-8

Any encountered issues

4.5 Training and Supplies

The Subcontractor is responsible for providing their staff with the following training and provision of supplies:

Expected training provided by subcontractor:

Licensed in the State of South Dakota to operate fuel delivery trucks that will be used to meet the requirements stated in this SOW.

DOT Hazardous Material Certified

Subcontractor provided supplies including:

Safety (PPE)

Hard hat Safety glasses Flame-resistant clothing, with Class II reflectivity Safety toe boots above the ankle, non-slip Gloves, as required by Subcontractor policy and procedures Hearing protection (only required with elevated noise levels)

Small Tools and Supplies (STS) required to meet the requirements of this SOW.

5.1 Subcontractor

The Subcontractor shall provide the following deliverables in accordance with the format for documents deliverables provided in Section 5.2.

Deliverable No. SOW Section Description

1 2 Tank wagon delivery measuring meter certification

2 4.4 Delivery Tickets

5.2 Format for Documentation and Deliverables

Electronic distribution will be the standard method of transmitting all documentation/deliverables. All contract documents are to be identified by contract number and provided in a searchable PDF format.

Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page 7-9

Reports and other narrative documents are to have a cover sheet stating the document number, document title, use date, and subcontract number, as well as having a place to identify authors, checker, and approval signatures as required.

All reports and narrative documents are to begin with an executive summary briefly describing the contents and conclusions of the document.

Oral presentations, if requested, shall use PowerPoint software.

Progress meetings between FFDG and the Subcontractor will be conducted on an as-needed basis, either in-person and/or via tele/video conference. These meetings will be held at scheduled times and locations problems, resources, technical and contractual issues. The Subcontractor shall produce and distribute meeting minutes, assigned actions and associated project management documents within three (3) working days of each meeting. The parties shall forward any comments within five (5) working days of receipt of the minutes.

The Subcontractor shall maintain a list of open action items assigned, identifying action to be taken, the responsible party and the date the action must be completed.

Subcontractor shall be responsible for any and all transportation requirements associated with this Statement of Work.

End of document