This document is an Environment, Safety, and Health (ES&H) Requirements Exhibit for a subcontract at the Sanford Underground Research Facility (SURF), specifically for FDC Bulk Diesel Fuel Delivery. The exhibit outlines comprehensive safety, training, and operational requirements for subcontractors working at the facility, with a focus on detailed personal protective equipment (PPE) specifications, safety training, and site-specific work conditions.

Key requirements include mandatory LBNF/DUNE ES&H orientation training (surface and underground), specific PPE provisions such as Type II safety helmets, reflective clothing, safety boots, and 4-gas monitors, and strict protocols for high-hazard work activities. The document extensively covers emergency response procedures, medical surveillance, environmental protection, and site-specific regulations, with particular emphasis on underground work safety, radiation protection, and compliance with Department of Energy (DOE) worker safety standards. Subcontractors must submit detailed ES&H programs, conduct job hazard analyses, and adhere to strict safety guidelines throughout their work at the SURF site.

View the file

Other files

File Type Posted
PR 375739 Bulk Fuel Delivery Service.pdf PDF
SOW.pdf PDF
SARC_Subcontractor Annual RepsCerts Rev 4.pdf PDF
Pricing_Sheet_SD_Diesel_1002_2025.xlsx XLSX spreadsheet
PUR-466_Proposal Certifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A | August 2025 1 of 14

& Training

Title of Scope of Work: FDC Bulk Diesel Fuel Deliver

The Subcontractor shall coordinate work schedules, site access, and resolution of technical issues with Point of Contact or Service / Installation Manager or Construction Coordinator:

Name: Michael Pfaff

Phone 630-840-5389

Email: mpfaff@fnal.gov

Specific training, Personal Protective Equipment (PPE) Requirements, and Exemptions

FFDG Provided Training:

- LBNF/DUNE ES&H orientation training o Surface (2.5-hours) o Underground (1.5 hours) o Piratical Factors (4-hours)

- Underground Guide training (for supervisors) (4-hours).

PPE Requirements provided by Subcontractor:

- Type II Safety Helmet with chin strap, safety glasses,

- class II reflective clothing, construction boot with safety toe, and minimum cut level IV gloves.

- Underground work will require a cap lamp, Ocenco M-20.3 and Each guide/supervisor is required to carry a 4-gas monitor o 4-Gas Monitor, NO2, CO2, O2, and H2S

PPE Requirements provided by FFDG

- Self-rescuer, Ocenco 7.5 Emergency Breathing Apparatus – for each individual access the underground space.

Subcontractor’s ES&H Program In reference to Section 2.2, this subcontract will require the Subcontractor to submit an ES&H Program.

Section 1 – Scope of Work & Coordination

1.1 Point of Contact

1.2 Definitions

1.3 References

1.4 Enforcement

1.5 Subcontractor & ES&H Certificate

1.6 Concern Reporting Process

1.7 Bulletin Board

1.8 Subcontractor’s Competent Person

1.9 Work Completion and Clean-up

1.10 Experienced Modification Rate

Section 2 – Subcontractor’s ES&H Program

2.1 Responsibility

2.2 Environment, Safety, & Health

2.3 Hazard Analysis

2.4 Stop Work Activity

2.5 Off Hours / High Hazard Work

Section 3 – Reporting & Training Requirements

3.1 Emergencies Response and Reporting

3.2 Subcontractor Safety & Health Records

3.3 Subcontractor Training

Section 4 – Work Site Conditions

4.1 Site Access

4.2 Permits

4.3 Electrical Power

4.4 Transportation of Equipment and

Materials

4.5 Access and Traffic Ways

4.6 Temporary Heat

4.7 Temporary Lighting and Ventilation

4.8 Water and Sanitation

4.9 Hazardous Material

4.10 Confined Work Space

4.11 Work on Existing Utilities

4.12 Personal Protective Equipment (PPE)

4.13 Burning/Welding/Brazing/Spark Producing

4.14 Open Burning, Fire Barrels, Coal or

Kerosene Type Salamanders

4.15 Electrical Work

4.16 Oxygen Deficient Hazards

4.17 Radiation Protection

4.18 Environmental Protection

4.19 Smoking

4.20 Drug and Alcohol-Free Work Place

4.21 Fuel Storage Tanks

4.22 Explosives

4.23 Vehicles and Equipment

4.24 South Dakota Closure

Attachment A – ES&H Plan Certification Attachment B – High Risk Table Requiring JHA/SOP Attachment C – Working at Heights Permit

EXHIBIT A - ES&H

Requirements For Supply and/or Services Subcontracts – South Dakota Leased & Non-Leased Spaces

Table of Contents

2 of 9 August 2025| Exhibit A

1.0 SCOPE OF WORK & COORDINATION

1.1 Point of Contact

The Fermi Forward Discovery Group, LLC (FFDG) Point of Contact shall be the first line of contact with the Subcontractor’s field personnel. He/she is responsible for auditing to ensure that the Subcontractor is following established and accepted ES&H practices while on site. Point of Contact is assigned for low-risk work activities that typically do not require a written job specific Hazard Analysis.

1.2 Definitions

Competent Person: One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate the identified hazards. Duties related to ES&H shall take precedence over other duties.

Fermi Forward Discovery Group (FFDG): The entity that manages Fermi National Accelerator Laboratory and leased space for the U.S.

Department of Energy’s (DOE) Office of Science.

FFDG ES&H Coordinator: A FFDG person responsible for ES&H guidance, periodic work site visits, support for the FFDG Installation Coordinator, and provide oversight of the Subcontractor’s safety program. The ES&H Coordinator will review Hazard Analysis and training documentation for ongoing work activities. Any deficiencies noted shall be brought to the attention of the FFDG Installation Coordinator for follow-up with the Subcontractor. The ES&H Coordinator has authority to stop work activities for imminent danger, fatality, or major environmental release, but does not have authority to direct changes in the work scope of the project or the Subcontractor’s means and methods of the installation/assembly.

Subcontractor Field Superintendent: One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate the identified hazards.

The superintendent’s role is to run the day-to-day operations and control the short-term schedule. In addition, the superintendent includes important quality control and coordination responsibilities with sub-tier contractors/vendors. FFDG also requires the Subcontractor Field Superintendent to have completed an OSHA 30-hour construction safety course. Duties related to ES&H shall take precedence over other duties.

Imminent Danger: A hazard which, if allowed to persist, is likely to cause an accident that will result in death, injury, property damage, or environmental impairment.

FFDG (Service) Installation Coordinator: A FFDG Installation Coordinator will be assigned for subcontracts involving work activities with potential risk. He/she shall be the first line of contact with the Subcontractor’s field personnel and the Point of Contact, and is responsible for auditing to ensure that the Subcontractor is following established and accepted ES&H practices while on site.

Integrated Safety Management (ISM): ISM is defined as a system for performing work safely and in an environmentally responsible manner. The term “integrated” is used to indicate that the ES&H management systems are normal and natural elements of accomplishing work. The intent is to integrate the management of ES&H with the management of the other primary elements of installation: quality, scope, cost, and schedule.

FFDG subscribes to the philosophy of ISM by following the program outlined in this section.

The ISM core functions are implemented by robust daily work planning of installation activities. The ISM core functions include 1) define the scope of work, 2) identify and analyze the hazards, 3) develop and implement hazard controls, 4) perform work with controls, and 5) provide feedback for continuous improvement.

FFDG also requires this of Subcontractors and sub-tier subcontractors.

FFDG Procurement Administrator: A FFDG person responsible for and specifically assigned to the project, who is responsible for negotiating and administering the subcontract terms and

Exhibit A | August 2025 3 of 14 conditions. All modifications to the subcontract shall come from the Procurement Administrator or designee, in writing. The Procurement Administrator or designee is the sole entity that can modify the subcontract or initiate change orders.

FFDG Project Manager: A FFDG person responsible for managing, phasing, and ensuring the project is meeting key milestones.

Qualified Person: One who, by possession of a recognized degree, certification, or professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated his or her ability to solve or resolve problems relating to the subject matter, the work, or the project.

South Dakota Science and Technology Authority (SDSTA): The entity that manages the Sanford Underground Research Facility.

Sanford Underground Research Facility (SURF):

Underground research facility, located in Lead, South Dakota.

Subcontractor’s Safety Officer/Representative:

When required by the subcontract, the Subcontractor’s Safety Representative shall have completed the OSHA 30-hour construction safety course and have a minimum of 10 years of construction experience consistent with the type of activities included in the Statement of Work.

Subcontractor’s ES&H Program: Subcontractor’s (corporate) company policies and procedures to ensure operations comply with applicable safety and occupational health laws and regulations and protect the safety and health of employees and members of the public.

Stop-Work Order: A definitive statement made openly to another individual that an imminent danger situation exists and therefore, all related work must stop immediately.

1.3 References

The Subcontractor and sub-tiered contractors shall comply with the following reference documents.

The publications referenced herein, form a part of this Exhibit and Subcontract documents.

a. 10 Code of Federal Regulations (CFR) 851, Department of Energy (DOE) Worker Safety and Health Program

b. 10 CFR 835, Occupational Radiation Protection

c. 10 CFR 860, Trespass to Land Owned & Leased by the US Government

d. 10 CFR 707, Workplace Substance Abuse

Programs at DOE Sites

e. 10 CFR 708, DOE Contractor Employee

Protection Program

f. 29 CFR 1904, Record Keeping Guidelines for

Occupational Injuries and Illnesses

g. 29 CFR, 1910, Occupational Safety and Health

General Industry Standards

h. 29 CFR 1926, Occupational Safety and Health

Standards for Construction

i. 40 CFR Protection of the Environment (USA EPA)

j. 49 CFR Transportation

k. South Dakota’s Rules of the Division of Motor

Services

l. US Department of Energy Orders/Standards

i. DOE Order 442.1A, Department of Energy

Employee Concerns Program

ii. DOE Standard 1090, Hoisting & Rigging, 2020

m. National Fire Protection Association (NFPA) codes and standards

i. NFPA 70E, Standard for Electrical Safety in the Workplace, 2015

ii. NFPA 70, National Electrical Code, 2017

n. American Conference of Governmental

Industrial Hygienists (ACGIH), “Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices, 2016.

TLVs are lower than the Permissible Exposure Limits (PELs) in 29 CFR 1910 and 29 CFR 1926.

TLVs shall be used in lieu of PELs.

o. American Society of Mechanical Engineers:

i. ASME Boiler and Pressure Codes (BPVC)

ii. ASME B30 Series, Crane Safety

iii. ASME B31 Standards of Pressure Piping

p. American National Standards Institute (ANSI):

ii. ANSI Z136.1 Safe Use of Lasers

1.4 Enforcement

The described Environment, Safety and Health Certificate form requires the Subcontractor acknowledgment and certification of an ES&H program commensurate with the complexity and

4 of 14 August 2025 | Exhibit A nature of the work activities. Subcontractor(s) working on DOE leased Space at Sanford Underground Research Facility (SURF) are subject to DOE civil penalties or contract fee reductions for noncompliance, in accordance with 10 CFR 851 and

10 CFR 835.

The Department of Energy (DOE) regulation 10 CFR 851 “Worker Safety and Health Program” defines worker safety and health requirements for the Department of Energy contractors and their subcontractors. The Worker Safety and Health Program acknowledgment is part of the ES&H Certificate, reference paragraph 1.5. Additional information can be found at:

http://eshq.fnal.gov/worker-safety-health-for-subcontractors

The US Department of Energy has the authority to exercise enforcement actions on any subcontractor who violates any requirement set forth in 10 CFR 851 and 10 CFR 835. The subcontractor may be subject to civil penalties of over $100,000 for each such violation. If any violation is a continuous violation, each day of the violation shall constitute a separate violation for the purpose of computing the civil penalty.

The State of South Dakota Bureau of Administration, Office of Risk Management has the authority to shut down the site in response to significant incident.

See Attachment A of ES&H Certificate to be completed.

1.5 Subcontractor & ES&H Certificate

In accordance with 10 CFR 851, the subcontractor shall submit the ES&H Certificate with the pertinent information related to this subcontract. For further instructions, see attachment at the end of this document.

1.6 Concern and Reporting Process

Whistleblower Protection for Subcontractor Employees:

a. The Subcontractor shall comply with the requirements of the "DOE Contractor Employee Protection Program" at 10 CFR Part 708

b. The Subcontractor shall insert or have inserted the substance of this clause, including this paragraph (b), in lower tier subcontracts, at all tiers, with respect to work performed on any DOE-owned or leased facility, as provided for at

10 CFR part 708

c. Concern Reporting Processes - Subcontractor employees on the service worksite are entitled to use any of the means available to communicate concerns about ES&H conditions and practices. Information about concern reporting is available on ES&H bulletin boards throughout the leased space, and shall be included with FFDG provided materials for the service worksite postings for this project by request. The options for reporting concerns include

d. DOE Concern Reporting

i. Telephone: (630) 840-3281

ii. Email: EmployeeConcerns@science.doe.gov

1.7 Bulletin Board

Subcontractors that have an on-site base of operations are responsible for installing and maintaining a safety bulletin board at the location where the majority of the subcontractor’s employees, sub-subcontractors, and sub-tier vendors report to work. Information shall include

a. DOE Worker Safety and Health Poster DOE-F

5480.2 (Worker Rights), furnished by FFDG.

Spanish versions of the DOE Safety and Health Poster are also available from FFDG upon request.

b. DOE Occupational Safety and Health Complain Form 5480.4, available on-line

1.8 Subcontractor’s Competent Person

The Subcontractor shall ensure that there is a Competent Person available on site at all times when work is in progress. The Competent Person shall have the knowledge of OSHA standards and other safety related work practices and procedures.

1.9 Work Completion and Clean-up

The Subcontractor shall complete all work and all clean-up operations shall be in compliance with their ES&H program or as agreed by the FFDG representative. Documentation for all aspects of the ES&H program shall be complete and in place before Subcontract closeout. All excess materials, equipment, waste materials and rubbish shall be properly disposed from the work site.

1.10 Experienced Modification Rate (EMR)

http://eshq.fnal.gov/worker-safety-health-for-subcontractors http://eshq.fnal.gov/worker-safety-health-for-subcontractors mailto:EmployeeConcerns@science.doe.gov

Exhibit A | August 2025 5 of 14

Subcontractor must provide Experience Modification Rating (EMR) Rates and Occupational Safety Health Administration (OSHA) 300 log for last three years.

The EMR must be less than one (1.0) and the Subcontractor must have a three-year safety record equal to or less than 85% of the most current U.S.

Bureau of Labor Statistics for Total Recordable Case Rate (TRC) and Days Away, Restricted, or Transferred (DART) Case Rate as reported in the BLS Occupational Injury and Illness Data.

Subcontractor or sub-tier subcontractors EMR is 1.0 or above, or the Subcontractor has less than three

(3) years of ratings; or the three-year safety record is greater than 85% of the BLS general statistics, the Subcontractor shall provide explanation.

2.0 SUBCONTRACTOR ES&H PROGRAM

2.1 Responsibility

The Subcontractor has primary line responsibility for providing a safe working environment for its employees. He/she shall provide overview on the program’s effectiveness and take appropriate corrective actions. The Subcontractor has responsibility to ensure sub-subcontractors also comply with the Subcontractor’s Environment, Safety & Health program and the requirements of this exhibit.

2.2 Environment, Safety & Health Program

The program must comply with and encompass all applicable aspects of 29 CFR 1910, OSHA Safety and Health Standards for General Industry, 10 CFR 851, DOE Worker Safety and Health Program, and when applicable, the provisions set forth in 10 CFR 835, Occupational Radiation Protection, 29 CFR 1926, Occupational Safety and Health Standards or other regulatory standards. On all subcontracts that have employee(s) on leased site for more than thirty (30,) eight (8) eight-hour days in a twelve (12) month period, or when requested, the Subcontractor shall submit to FFDG for review and acceptance a copy of their ES&H (corporate) program description. The program description shall be submitted within 10 calendar days of Subcontract award. The written program should describe the following elements:

a. Management Commitment and Leadership

iii. Subcontractor’s policy regarding ES&H goals and how these goals are communicated to the employees;

iv. Management commitment of resources to adequately implement the program;

v. Participation of management in safety meetings, inspections, and documentation;

vi. How ES&H rules are incorporated into site operations; and Enforcement and disciplinary procedures.

b. Assignment of Responsibility

i. Management responsibility for ES&H;

ii. Responsibilities, knowledge and authority of supervisor and competent persons; and

iii. Employee responsibility.

c. Training

i. General requirements;

ii. Supervisor and Competent Person training;

iii. New employee training;

iv. Hazard specific training;

v. Safety Meetings; and

vi. Documentation of training

d. Basic Safety and Health Provisions

i. Emergency actions;

ii. Recordkeeping and reporting of injuries;

iii. Housekeeping;

iv. Hazard Communication Plan;

v. Personal Protective Equipment; and

vi. Fire protection and prevention.

e. Hazard Assessment Process

i. How hazards are identified and analyzed;

ii. Preventive controls, and

iii. Inspections

f. Waste Handling and Disposal

i. Characterization of waste;

ii. Packaging and Labeling requirement; and

iii. Assurance that appropriate transportation and handling facilities will be used.

g. Other Programs dictated by Scope of Work (e.g.

LOTO, Confined Space, Hearing Conservation).

h. Workplace substance abuse program that, at a minimum, aligns with the “Workplace Substance Abuse Program at DOE Sites” (10 CFR 707).

2.3 Job Hazard Analysis (JHA), Work Activity

Plan (WAP) or Standard Operating Procedure (SOP)

A written Job Hazard Analysis (JHA), or a Field Level Risk Assessment (FLRA), or Standard Operating Procedure (SOP) will be required for work activities.

6 of 14 August 2025 | Exhibit A

An JHA details the specific hazards associated with the work activities and mitigating actions (including PPE in accordance with ANSI, OSHA, and NFPA 70E) that the subcontractor will take to reduce or eliminate the risk of injury. Safety Data Sheets (SDS) or Safety Data Sheets (SDS) and any specific procedures (confined space, LOTO) are to be submitted as part of this JHA. The JHA shall be submitted for FFDG review and acceptance prior to commencement of work. Each employee will acknowledge reading and understanding the JHA by placing his/her signature on the signature page. The JHA is a dynamic document which will require modification as the project moves from start to finish. As the JHA is updated, the employees must be advised of the new information.

Work Activity Plans (WAP) are task-specific documents that contain the relevant step-by-step installation instructions. They are intended for use by workers during installation to ensure that field operations are conducted safely and meet project requirements.

Templates of JHA, FLRA, WAP, and SOP can be provided upon request.

2.4 Stop Work Activity

Any employee may stop a work activity if there is imminent danger of serious injury, fatality, or major environmental release. If the hazard cannot be abated in a timely manner, the work activity shall be stopped and the Service / Installation Coordinator/Point Contact and Procurement Administrator shall be contacted.

2.5 Off Hours / High Hazard Work

The following work is categorized as High Hazard Work: Chemical usage that presents significant safety or health hazards, potential hazardous material releases, releases to surface waters or sanitary systems, or requires special controls (e.g., respirator use, local ventilation) and has not been assessed and approved by the Industrial Hygiene Group.

• Permit Required Confined Space Work.

• Crane, Hoist, & Powered Industrial Truck for any operations that include the following:

load tests at 100%-125% of rated capacity, critical lifts, or crane personnel basket/platform use.

• Modifying or repair/maintenance of equipment or systems that contain cryogenic materials (Does not include normal filling of liquid nitrogen dewars or refilling liquid cryogenic containing tanks by vendor delivery drivers).

• Electrical Work:

o Manipulative Energized Work.

o Diagnostic Energized Work including verifying that exposed conductors or circuit parts are in an Electrically Safe Work Condition (ESWC), where the following thresholds are exceeded:

o AC power distribution systems:

over 600 Volts nominal or the equipment has a calculated or tabular arc flash PPE category of 3 or higher.

o DC power sources that both exceed 400 Volts and can deliver in excess of 500 Amperes, or the equipment has a calculated or tabular arc flash PPE category of 3 or higher.

o Capacitors that can store over 10 kilojoules of energy at the maximum (peak) voltage normally applied to them.

o Battery systems that operate at over 600 Volts, or can deliver over 30 kilowatts, or the equipment has a calculated or tabular arc flash PPE category of 3 or higher.

o Inductors that can store over 10 kilojoules of energy at the maximum (peak) current normally applied to them, unless system configuration absolutely prevents the energy from remaining.

• Operation of equipment, circuit breakers, disconnect switches, contactors, and plugging/unplugging connectors that are not in a Normal Operating Condition as defined in Table 130.5(C) of NFPA 70E.

• Operation of equipment, other than equipment that has been listed by a Nationally Recognized Testing Laboratory (NRTL) in accordance with the manufacturer’s directions, unless the equipment has been approved by a NRTL or AHJ field inspection, or the installation has

Exhibit A | August 2025 7 of 14 received an Operational Readiness Clearance (ORC).

• Entry into an electrical distribution system manhole in which not all cables in the manhole have been verified to be in ESWC.

(Confined Space requirements must be separately considered).

• Coring or cutting into concrete, masonry, and walls, floors, and ceilings of any type of material where it cannot be proven in advance that there are no electrical circuits or equipment embedded in or located on the side of the concrete or building surface opposite the worker.

o Note: Work on equipment that has been previously proven to be in an ESWC through zero voltage verification, with lockout / tagout or configuration control locks in place to maintain it in an ESWC is not high hazard work.

• Excavation: Personnel working within an excavation that is greater than 4 feet deep.

• Fall Exposure: Use of personal fall arrest systems. Erection or dismantling of scaffolding.

• When work requires wearing a fall protection harness, a Working at Heights Permit must be completed, reference below table for guidance. See attachment B.

Controls Passive Active

Working At Heights Permit Required

Fall Rescue Plan Required

Eliminate Hazard X No No

Guardrails/Han drails/Hole Covers*

X* No* No

Working from MEWP** X Yes** No

Fall Restraint X Yes No Fall Arrest X Yes Yes Administrative Controls X Yes Yes

*Unless using articulating (aerial) lift, Fall Restraint and permit is required at a minimum ** Exception is scissor-lifts; the use of fall restraint or fall arrest equipment can be omitted if the scissor lift DOES NOT have a tie off provision.

• Hydraulic and Pneumatic Systems:

• Any work where a sudden uncontrolled release of pressure or fluids could result in injury.

• Operating hydraulic cutters (excludes hand pumped equipment).

• Transporting compressed gases in elevators occupied by personnel.

• Modifying or reconfiguring pressurized hydraulic or pneumatic systems.

• Lasers: Working around/with unenclosed Class 3B or 4 lasers.

• Machining: Hazardous materials like lead, uranium, beryllium.

• Spark producing work: Welding, grinding, brazing, flame cutting.

• Magnetic Fields:

o Any situation where ferrous objects can be subject to magnetic forces causing sudden or unexpected movement into the magnetic field.

• Radiation:

o High Radiation Area (HRA) work beyond inspection or placing equipment in a safe state.

o Work on or with Class 3-5 objects.

o Work with activated liquids

(Excludes analytical lab work with volumes less than 1 liter and routine tritiated water management activities.)

o Work with depleted uranium (DU).

o Work in a contamination area.

o Work with non-interlocked radiation generating devices/neutron generators (Excludes XRF and SEM use).

• Pressure (vacuum/water) or stress testing of activated components.

• Destructive work (cutting, welding, grinding, etc.) on activated components.

• Radiography.

• Hazardous Energy Release:

• Work on equipment where there is a potential for unexpected release of energy (hydraulic, pneumatic, thermal, potential, etc.) where LOTO is required.

High-risk work: Consider the risk factors below to determine high-risk activities. Please note, routine work may be deemed high hazard or high risk.

• Resource limitations.

• Personnel experience.

• First-time or very infrequent work.

• Work environment.

8 of 14 August 2025 | Exhibit A

• Significant impact to lab or mission (e.g., lifting “one of a kind” equipment).

• Multiple work group coordination.

• Personnel executing the task consider the work high risk.

All High-Hazard or High-Risk work must be done during normal Lab business hours of Monday through Friday, 6:00 a.m. to 6:00 p.m.

When planning for High Hazard Work, adequate consideration must be given to the extent of such work that can be performed within those hours on any given day, as work will be stopped outside of those hours and the site placed in a “safe” condition.

High Hazard Work outside of normal Lab business hours requires the following planning and prior approval prior to starting the High Hazard Work:

An adequate justification for such work outside of normal hours has been submitted to FFDG and approved. Such approval will only be granted by FFDG when it is in the interests of heightened safety at SURF.

3.0 REPORTING & TRAINING

REQUIREMENTS

3.1 Emergency Response and Reporting

In the event of an actual fire or severe weather, all Subcontractor personnel shall evacuate to a prearranged safe location as designated by the Service / Installation Coordinator or Point of Contact.

a. All emergencies occurring at Sanford Underground Research Facility (SURF) site must be reported immediately following SURF Emergency Response Procedures and delineated in SURF Orientation training.

After emergency is stabilized, contact the FFDG Service / Installation Coordinator or Point of Contact.

b. The Subcontractor shall investigate all accidents. When required by the Service / Installation Coordinator or Point of Contact, a report must be submitted within two (2) days of accident.

c. A summary of the total hours worked on the project shall be submitted to the Service / Installation Coordinator or Point of Contact on a monthly basis.

d. Subcontractor personnel shall participate in all emergency drills.

e. All emergency egress routes shall be kept clear at all times.

f. In event of a hazardous material spill, the first person to become aware of the spill shall immediately contact the Emergency Response per SURF procedures.

3.2 Subcontractor Safety and Health Records

Subcontractors shall maintain and provide to FFDG upon request any and all applicable occupational safety and environmental records. Such records include, but are not limited to, the records required to be maintained by federal/state regulations, OSHA injury/illness logs, training records, inspection records, safety meetings, and accident investigation.

3.3 Subcontractor Training

a. All Subcontractors performing work at SURF shall provide to their employees all necessary ES&H training as may be required by Federal/State regulations and as appropriate for their activities at SURF. FFDG will provide appropriate training for site hazards that are unusual for the trade of the subcontractor’s employees, such as training to conduct work in radiation areas or in oxygen deficient areas.

b. The Subcontractor is responsible for assuring that their employees who do not speak English understand all ES&H requirements. The subcontractor must be able to communicate emergency instructions to those employees.

4.0 WORK SITE CONDITIONS

4.1 Site Access

The subcontractor shall confine all operations to areas authorized or approved by FFDG and South Dakota Science and Technology Authority (SDSTA) who manages Sanford Underground Research Facility (SURF), in the city of Lead, South Dakota.

a. All subcontractors and sub-tiers working at SURF shall attend Surface and Underground Orientation training, as appropriate. The Surface orientation class is approximately 3-hours and the Underground orientation class is approximately 1.5-hours. In addition, there are practical factors for Surface and Underground approximately

0.5 hours and 2.5 hours respectively.

Scheduling of orientation training is through

Exhibit A | August 2025 9 of 14 the FFDG Service / Installation Coordinator or Point of Contact. The orientation and badging efforts require approximately two

(2) hours.

b. For underground work, the Subcontractor will designate, at a minimum, one individual for each work level, one individual acting as a guide to oversee a maximum of 12 workers. This individual will receive underground (Guide) training and will take approximately 3-hours of classroom time and 3-hours of practical underground factors.

4.2 Permits

FFDG conducts work through the use of on-site permits. All required permits will be identified by the Service / Installation Coordinator who will arrange for all necessary Laboratory permits. This excludes those permits required elsewhere. No work activity shall be performed without the required permits, laboratory or other. No alarms, safety devices, etc. will be disabled without prior approval of the Service / Installation Coordinator.

The Subcontractor shall make a specific request to the Service / Installation Coordinator at least 48 hours before disablement. Activities requiring permits include but are not limited to: work notification, electrical work, excavation, burning/welding, modification to drinking water systems, bringing radioactive sources on site, working with/on radioactive material, working in radiological areas, and moving government or Fermilab or SURF property off site. The Subcontractor will comply with all restrictions or provisions listed on permits.

4.3 Electric Power

The Subcontractor shall provide and pay for telephone service for his requirements. FFDG will furnish electric power at 480Y/277V and/or 208Y/120. The Subcontractor will pay cost of connection to this power source. Installation of the Subcontractor’s electrical distribution will be subject to the approval of FFDG.

4.4 Transportation of Equipment and

Materials

The Subcontractor shall transport all equipment and materials to the job site at his own expense. The

Subcontractor shall be responsible for minimizing any interference with local traffic or FFDG operations. Hoists at the Ross Shaft will be available for the movement of people, equipment, and material to the underground spaces.

4.5 Access and Traffic Ways

a. Access to the work shall be via Main Roads only.

Traffic on all paved roads shall be restricted to rubber-tired vehicles only.

b. The Subcontractor shall repair at his expense any damage due to his operations to existing structures such as culverts, fencing and barricades. The Subcontractor to the satisfaction of FFDG shall remove debris or litter on any roads caused by the Subcontractor’s operations immediately. Applicable safety standards shall apply to the use of all existing roads.

4.6 Temporary Heat

The Subcontractor shall provide and pay for installation of temporary heating facilities, fuel, protective coverings and enclosures as necessary to protect the work. Coal or kerosene type salamanders, pots and open fires will not be permitted.

4.7 Temporary Lighting and Ventilation

The Subcontractor shall install and maintain temporary lighting and ventilation throughout the project to an extent that permits craftsmen to work without compromise of safe working conditions.

4.8 Water and Sanitation

Industrial water (non-potable) is available at hydrants adjacent to the site. See the FFDG Service / Installation Coordinator for arrangements for their use. Domestic water (potable) is not available for drinking purposes. Subcontractor will be required to furnish drinking water and portable sanitation facilities for his employees.

4.9 Hazardous Materials

Any substance which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating or otherwise harmful, or is likely to cause death or injury shall be considered a hazardous material. The use of hazardous material shall be identified in the Subcontractor’s HA and approved by the FFDG Service / Installation Coordinator before use, 10 of 14 August 2025 | Exhibit A disposal shall comply with the bid documents and coordinated with FFDG’s Service / Installation Coordinator.

4.10 Confined Work Spaces

a. The Service / Installation Coordinator will identify all existing confined workspaces including hazards and entry operations to the subcontractor.

b. If a subcontractor is required to enter a permit-required confined space as part of their contract with FFDG, the Subcontractor shall provide the Service / Installation Coordinator with the following records at least 1 week prior to entry:

i. A written copy of their confined space entry program and permit.

ii. Training records for entrants, attendants, and supervisors.

iii. Evidence that all air monitoring equipment is properly calibrated.

c. The subcontractor must provide all of their own personal protective equipment (PPE), such as lifelines, harnesses, respirators, tripods, ventilators, etc.

d. The subcontractor shall inform the Service / Installation Coordinator prior to entering the confined space and include any specific permit space procedures the subcontractor will follow.

e. Once the work is completed, a copy of the subcontractor’s confined space permit shall be provided to the Service / Installation Coordinator annotated, if unplanned hazards were encountered.

4.11 Work on Existing Utilities

a. No work shall be performed on existing in-service piping systems without prior approval and coordination of the system outage by FFDG’s Service / Installation Coordinator. The subcontractor shall make requests for such outages at least 48 hours in advance. Pressure shall be relieved on all piping systems before opening up and starting work. Lockout/Tagout shall be used by the subcontractor for all valves, blank-offs and relief lines.

b. Work on existing utilities and any testing shall be included in the HA.

c. No work shall be permitted unless specified by the job and specific procedures have been submitted and accepted by FFDG.

4.12 Personal Protective Equipment (PPE)

The subcontractor must provide all required PPE to his/her employees and monitor the worksite to assure employees are wearing the required PPE.

PPE must be in accordance with ANSI, OSHA, and

NFPA 70E.

4.13 Burning/Welding/Brazing/Spark Producing

A permit is required before a subcontractor may burn/weld. The Service / Installation Coordinator will contact the SURF and secure a Hot Work permit.

Information concerning the Hot Work permit is listed below:

a. The Subcontractor must arrange for fire watches during burning, welding, or other fire or spark generating work. This fire watch must continue for a minimum of thirty minutes after work is complete;

b. It is the Subcontractor’s responsibility to furnish the proper number and type of fire extinguishers for any welding, cutting, or brazing activities as specified in the Hot Work Permit;

c. The extinguishers must be located in clear sight and no farther than 50 feet from the work areas and no combustibles within 35 feet of the work area or provide welding blankets or other means of mitigations;

d. All welding shall be in accordance with the requirements of the American Welding Society (AWS) Standard: Safety in Welding, Cutting, and Allied Process (ANSI/ASC Z49.1-94).

e. UL or FM listed check valves shall be installed on oxygen-fuel torch cutting equipment.

4.14 Open Burning, Fire Barrels, Coal or

Kerosene Type Salamanders

Open burning, fire barrels, coal or kerosene type salamanders, or open flame heating devices that have exposed fuel below the flame are not allowed on the SURF site. The following sets forth the minimum acceptable requirements for temporary heating devices at SURF:

a. Spark arresters shall be provided on all stacks or burning devices having forced drafts;

b. Temporary heating devices, used in any enclosed building, room, or structure, shall be listed by UL, FM, ETL, or other approval-testing laboratory and vented to the outside.

c. Flammable liquid fixed heaters shall be listed by

Exhibit A | August 2025 11 of 14

UL, FM, ETL, or other approval-testing laboratory and equipped with a primary safety control to stop flow of fuel in the event of a flame failure. Barometric or gravity oil feeds are not acceptable primary safety controls.

4.15 Electrical Work

The following sets forth the minimum acceptable requirements for work on electrical systems at SURF:

a. All electrical work shall be performed in accordance with NFPA 70E, Standard for Electrical Safety in the Workplace;

b. The Subcontractor personnel must be trained in Lockout/Tagout (LOTO) prior to participating in LOTO of hazardous energy sources and working on LOTO systems or equipment;

c. The Subcontractor shall provide ground fault circuit interrupter protection for electric hand held tools, portable generators, temporary electrical extension cords and other wiring, etc.

d. GFCI protection shall be provided for electric hand-held tools, portable generators, temporary electrical extension cords, and other wiring, etc.

The assured grounding program is not an acceptable alternative.

4.16 Oxygen Deficient Hazards

The following sets forth the minimum acceptable requirements for oxygen deficient hazard (ODH) work:

a. FFDG has policies and procedures governing work in ODH areas. The FFDG Service / Installation Coordinator will communicate specific requirements and work practices to the Subcontractor;

b. All Subcontractor and Sub-tier contractor personnel who must enter designated ODH areas must have and display a level of medical fitness acceptable to FFDG prior to entering those areas;

c. FFDG will assess the need for ODH training for Subcontractor personnel. If ODH training is necessary FFDG will provide it free of charge.

d. Oxygen monitoring equipment will be supplied to the Subcontractor personnel, as necessary.

The Subcontractor is responsible for returning this equipment upon request or upon completion of the work;

e. FFDG will furnish emergency evacuation equipment. Care, use, and the return of such equipment will be the responsibility of the Subcontractor.

4.17 Radiation Protection

The following sets forth the minimum acceptable requirements for radiation protection at SURF:

a. FFDG has policies and procedures governing radiological work. The FFDG Service / Installation Coordinator will advise the Subcontractor of the requirements and work practices, if potential for radiation affects the work scope;

b. FFDG will assess the need for radiological training for Subcontractor personnel. If radiological training is necessary, it will be provided free of charge by FFDG;

c. Radiation dosimeters will be supplied to the Subcontractor personnel, as necessary. The Subcontractor is responsible for returning this equipment upon request or upon completion of the work;

d. FFDG will furnish protective clothing. Disposal of such clothing will be the responsibility of

FFDG;

e. Prescribed procedures for material handling and segregation shall be followed explicitly.

Potentially radioactive material must be surveyed prior to removal from site. The FFDG Service / Installation Coordinator shall coordinate this survey.

f. Metals offered for recycling shall be coordinated with FFDG’s Point of Contact or Service / Installation Coordinator.

4.18 Environmental Protection

All work on the SURF site shall comply with all applicable environmental executive orders, laws, regulations, and permits. All Subcontractors and sub-subcontractors shall conduct their activities in an environmentally sound manner that limits the risks to the environment and protects the public health. The following sets forth the minimum acceptable requirements for environmental protection at SURF

a. Soil Erosion and Sedimentation Control (SESC) requirements for this project;

b. If required, the Subcontractor shall install all erosion control in accordance with SESC plan prior to the start of excavation activities;

c. Excavation at or adjacent to streams’ tributaries, 12 of 14 August 2025 | Exhibit A or other drainage outfalls shall be done only after notification to the FFDG Service Installation Coordinator;

d. The FFDG Service / Installation Coordinator will inform the Subcontractor if any wetlands are present in work area and what protective measures are necessary;

e. Unexpected environmental impacts shall be immediately reported to the FFDG Service / Installation Coordinator and mitigated by the Subcontractor;

f. Flammable and/or combustible liquids, fuels, and oils shall be provided with secondary containment and shall not be stockpiled beyond one day’s usage. Storage of these materials, plus maintenance and fueling areas used by the Subcontractor, shall be properly graded and maintained and shall be located a minimum of 100 feet away from a wetland or water body boundary so that adverse effects on the environment are eliminated;

g. The Subcontractor shall make routine inspections to assure that all motorized equipment is free of leaks of petroleum and other toxic or hazardous materials. The Subcontractor shall keep sufficient cleanup supplies on hand (e.g. oil dry, absorbent booms, etc.) to contain/absorb any spill or leak of fuels, oils, etc. that could potentially leak from his equipment. If a spill or leak should occur, the Subcontractor should immediately take appropriate steps to contain spills, move equipment out of sensitive areas (near wetland or water body) and immediately notify the FFDG point of contact or service / installation coordinator;

h. At the close of each workday, the Subcontractor’s Representative shall inspect the complete site to ensure that all erosion controls, drainage patterns, excavations and staging areas are in environmentally sound condition for the weather conditions anticipated.

4.19 Smoking

All tobacco products and electronic smoking devices are prohibited in all areas on SURF site.

4.20 Drug and Alcohol-Free Work Place

a. All personnel of the subcontractor, sub-subcontractors, and sub-tiers are prohibited from engaging in the unlawful manufacture, distribution, dispensing, possession, or use of controlled and restricted substances. All subcontractors and subcontractor’s personnel shall adhere to the Federal Controlled Substances Act (12 USC 8120 and further defined in Federal Regulations 29 CFR 1308.11-

3808.15 and 10 CFR 707) and stated in the subcontract documents.

b. After damage to property or environment release by the subcontractor or sub tier contractor associated personnel are subject to drug testing and results shall be submitted to the FFDG Point of Contact or Service / Installation Coordinator.

4.21 Fuel Storage Tanks

The following sets forth the minimum acceptable requirements for vehicles and equipment at SURF:

a. Above ground fuel double wall storage tanks for vehicles shall be coordinated with FFDG and

SURF;

b. Fuel tanks mounted on pick-up trucks shall conform to the requirements of the state of South Dakota;

c. Fuel tanks mounted on pick-up trucks shall be removed from the SURF site at the end of each workday;

d. Refueling of equipment while the motor is running is prohibited;

e. During refueling from truck-mounted fuel tanks or with portable fuel cans, etc., a 10-pound (minimum) A-B-C dry chemical fire extinguisher must be present;

f. Maintenance and fueling areas used by the Subcontractor shall be properly graded and maintained and shall be located a minimum of 100 feet away from a wetland or water body boundary to avoid adverse effects on the environment;

g. Fueling operations shall be provide with the necessary safety components and the necessary grounding/bonding;

h. Gasoline and propane are prohibited in the underground facilities.

4.22 Explosives

The use of explosives is not permitted without prior written approval of the FFDG and SDSTA.

Exhibit A | August 2025 13 of 14

4.23 Vehicles and Equipment

The following sets forth the minimum acceptable requirements for vehicles and equipment at SURF:

a. Battery use underground: To limit the risk of uncontrolled fires, lithium-ion battery-powered equipment with battery capacity greater than 50 amp-hours is not permitted underground without prior approval from FFDG.

b. Operators must have an appropriate, valid driver’s license when operating vehicles on site.

Seat belts are required to be provided and worn for the operators and passengers of all vehicles;

b. All vehicles and mobile powered equipment, except automobiles and pickup trucks, shall have reverse signal alarms (a.k.a. backup alarms) audible above the surrounding noise level. If backup alarms are not present on the equipment, a spotter (other than the driver of the vehicle) must be present to warn pedestrians and the drivers of other moving equipment;

c. If required by the equipment manufacturer, roll over protection structures shall be provided;

d. Personnel lifts must be equipped with audible motion alarms. These alarms must be in operation and audible over the surrounding ambient noise when the lift is in use.

Additionally, all lifts require two distinct actions in order to make the lift move in a forward or backward direction or in an upward or downwards direction. A foot pedal is considered one of the actions if independent of the other controls;

e. The equipment manufacturer must approve any modifications to lifting and hoisting equipment;

f. All hand and power tools must be checked prior to use on each shift to assure that they are maintained in a safe condition. Any deficiencies shall be repaired, or defective parts replaced, before continued use.

g. Equipment inspection and modification (The subcontractor shall comply with 29 CFR 1910.169, 1910.176, and 1910.178 and when applicable, the provisions set forth in 29 CFR 1926.600, Subpart O):

i. The Subcontractor must inspect all heavy equipment before use on site, prior to use on each shift, and during use to make sure it is in safe operating condition. Defective equipment shall be removed from service;

ii. The Subcontractor is to assure that regulatory inspection records are complete and up-to-date and that operating manuals are available;

iii. In no case shall the original safety factor of the equipment be reduced.

h. All tools and equipment brought on site by the Subcontractor are subject to inspection by FFDG. Items found to be out of compliance shall be repaired or immediately removed from service, tagged out of service.

4.24 South Dakota Closure

The SURF site is closed for major holiday. However, work activities may still occur on these days, reference the Scope of Work:

New Year’s Day – January 1st Martin Luther King Jr. Day – 1st Monday after January 15th President’s Day – 3rd Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – 1st Monday in September Native American Day – 2nd Monday in

October Veterans Day – November 11th Thanksgiving Day – 4th Thursday in

November Day After Thanksgiving – Friday after

Thanksgiving Christmas Eve (1/2 Day) – December 24th Christmas Day – December 25th New Year’s Eve (1/2 Day) – December 31st

If any of these holidays occur on a weekend day, a weekday will be used for the holiday.

August 2025 1

Attachment A

Environment, Safety, and Health Certification (ESHC)

Signature (Subcontractor) Subcontractor’s Name Dated

FOR ALL EMERGENCIES CALL: 911

Emergency Contact number: SURF Emergency Response Protocol

For all incidents, injuries, property damage, near-misses, work-induced illness or chemical over-exposures, the Service / Installation Coordinator or Point of Contact MUST be immediately contacted upon scene stabilization, but in all cases within one hour

ACKNOWLEDGMENT of 10 CFR 851 As a subcontractor to FFDG, you must meet the requirements of Title 10, Code of Federal Regulations, “Energy”, Part 851, “Worker Safety and Health Program”. As such, you must be aware of, and comply with, the requirements of this regulation. (Link to 10 CFR 851)

Acknowledgment I, Enter Subcontrator - Company Officer, certify that that I have read the requirements of 10 CFR 851 and attest that my firm and sub-tier contractors will comply with the requirements.

Yes No

MEDICAL SURVEILLANCE AND QUALIFICATION

Occupational Medicine Will you have any employees that will work on-site for 30, eight-hour days in a

12-month period, or are enrolled for any length of time in a medical or exposure monitoring program required by federal, state, or local regulations (including hearing conservation, respiratory protection, lead exposure)?

Yes No

If yes, you will need to:

1. Comply with the occupational medicine requirements of 10 CFR 851, Appendix A

2. Provide your occupational medicine provider contact information. FFDG has identified five medical facilities on the attached map. Highlight the facility to be used, or identify and map an alternate. Post the map at the job site and annotate the address for the designated facility on the map.

Clinic /…

This is the start of the file's text. The full file is on GovTribe.