SOW - Diesel Fuel.doc
DOC document 42 KB Posted
- Attached to
- GASOLINE
- Solicitation number
- 5-S176-Q-00499-00
- Issued by
-
Department of Energy Office of Science
About this file
This is a Statement of Work (SOW) for Ultra Low Sulfur Diesel Fuel #2D for Argonne National Laboratory. The SOW details a two-year contract for supplying diesel fuel to the underground storage tank at Building 46, with deliveries to be made within two working days of a verbal task order. The fuel must be ultra low sulfur diesel oil grade #2D containing less than 0.5% sulfur, with a winter blend mix required from October 15th through April 15th of each contract year.
The solicitation (5-S176-Q-00499-00) is issued by the Department of Energy Office of Science for a Blanket Purchase Agreement spanning June 1, 2025 to May 31, 2027. Offerors must be direct fuel providers with their own trucks, not brokers or third-party sourcers. Submission deadline is May 12, 2025, with required documentation including Argonne's terms and conditions, risk work supplemental conditions, statements of work, and various certifications such as insurance and country of origin documentation. The contract includes specific safety requirements, delivery protocols, and provisions for fuel quality testing and emergency deliveries.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - Unleaded Gas E-85.doc | DOC document | |
| ANL-366M (on-site mod risk)-01-OCT-2024.PDF | ||
| G5-076053 Instructions for Bidders.docx | DOCX document | |
| ANL-70 Request for Quotation.doc | DOC document | |
| FUEL OSFM Document.pdf | ||
| ANL-70A Reps and Certs Short-26-MAR-2025.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARGONNE NATIONAL LABORATORY
9700 SOUTH CASS AVENUE
ARGONNE IL 60439-4873
April - 2025 Statement of Work
ULTRA LOW SULFUR FUEL OIL #2D
Building 46 Underground Storage Tank
DESCRIPTION OF WORK
Contractor shall supply ultra low sulfur fuel oil #2D on an as-needed basis for the underground storage tanks located at Building 46, Argonne National Laboratory, for a two-year period.
DIESEL FUEL – GENERAL
This specification covers ultra low sulfur fuel oil #2D suitable for use in compression ignition internal combustion engines which includes trucks and heavy equipment operated at Argonne National Laboratory.
The diesel fuel oil classification is to be grade number 2D and shall contain less than 0.5% sulfur, and is herein referred to as fuel oil #2D. The vendor shall supply winter blend mix from October 15th through April 15th of each contract year. The winter blend mix shall be a blend of fuel oil #1 (kerosene) and fuel oil #2 (ultra low sulfur diesel) and shall charge an additional fee for blending the two fuels prior to delivery. The vendor shall use the ultra low sulfur #2 diesel fuel when blending the two fuels for winter blend mix. The diesel fuel shall be clear hydrocarbon oil free from suspended water and free from sediment or suspended foreign matter. Analyses shall be in accordance with currently recognized testing procedures of A.N.S.I./A.S.T.M. D975-92. The diesel fuel shall be dyed in order to be in compliance with all federal and state regulations for road use diesel fuel.
TAX EXEMPT
Argonne National Laboratory is exempt from the payment of any and all taxes imposed by the federal government, county, city and/or State of Illinois, to include gross receipts tax and superfund tax, with the exception of a fixed fuel tax for on-road diesel fuel (Illinois Motor Fuel Tax, underground storage tax, environmental fuel tax, and Federal Excise Tax).
TEST SAMPLING
Certified analysis of #2 ultra low sulfur diesel fuel at any time the product is delivered, shall be made on request. Said analysis is to be made by an independent testing laboratory, or the refiner, at no cost to Argonne National Laboratory. The Laboratory will notify the Contractor, prior to the delivery of a product, which it intends to take a sample of the product upon delivery. The Contractor shall provide a clean, sealable one (1) gallon container to the Laboratory. On delivery of the product, the Laboratory will take a gallon sample from the top of the delivery wagon, seal and date the container, send it to an independent testing laboratory for the necessary testing, and billing to the Contractor. The right is reserved to cancel the contract with the Contractor at the Contractor’s expense, for inferior deliveries or if the product is found to contain dirt or sediment, or if it is of a structure that prevents proper operation of the cars, trucks and various types of power equipment.
TANK LOCATION
The delivery location at Argonne National Laboratory is the underground storage tank located at Building 46. It is a ten thousand (10,000) gallon U.S.T. This tank shall not exceed 85% of its capacity.
The BPA Call Manager is the Technical Representative for this contract. The Technical Representative shall ensure Contractor compliance with all ESH safety regulations while delivering the product to the Building 46 storage tank, and shall oversee the Contractor’s activities while unloading the diesel fuel into the Building 46 underground storage tank.
The BPA Call Manager is also the Technical Coordinator for the Building 46 diesel fuel storage tank. The Technical Coordinator shall order the diesel fuel for this tank, and shall schedule the Contractor for deliveries to the Building 46 underground storage tank.
DELIVERY
Unless otherwise indicated herein, all deliveries are to be made within two (2) working days following the receipt of a verbal task order release placed by authorized personnel of the Laboratory.
NORMAL DELIVERIES
All deliveries shall be accepted by the Laboratory between the hours of 8:00 a.m. and 2:30 p.m. Monday through Friday. (Lunch is from 11:30 a.m. – 12:30 p.m.) Normal delivery does not include Saturdays, Sundays, or holidays.
OFF-HOUR, EMERGENCY, WEEKEND AND HOLIDAY DELIVERIES
Emergency deliveries shall be made within twelve (12) hours upon receipt of the verbal task order release placed by authorized personnel of the Laboratory. A special cartage rate shall apply Monday through Friday before 8:00 a.m. and after 2:30 p.m., and on Saturdays, Sundays and holidays. The labor rate for the driver shall be listed separately on these deliveries.
CONTRACTOR RESPONSIBILITY
The Contractor shall be responsible for the performance of all deliveries and work under this contract. The Contractor shall be responsible to the Laboratory for the acts and omissions of their employees, agents or subcontractors.
Diesel fuel shall be delivered to the Argonne National Laboratory site in metered trucks in accordance with U.S. Department of Transportation and Part 160 of Title 41 Illinois Administrative Code covering storage, transportation, sale and use of gasoline and volatile oils. The Contractor shall have current State of Illinois “inspection and test certification seals” on all delivery measuring meters.
Spillage that could result in dangerous conditions for the environment, maintenance, repair, pedestrian traffic, shall be taken care of immediately by the Contractor. In the event it becomes necessary for remedy, repairs will be made at no cost to the Laboratory. All spillage shall be reported by the Contractor as a 911 and appropriate Argonne National Laboratory personnel shall be notified immediately.
INSPECTION AND ACCEPTANCE OF WORK AND CONTRACT
The Contractor shall submit documentation that the tank wagon delivery measuring meters are in compliance and have current State of Illinois inspection and test certification seals. The Laboratory reserves the right to have all measuring devices rechecked at any time during the life of the contract. If measuring device re-checks disclose any discrepancy in the number of gallons shown on the delivery ticket and the actual number of gallons delivered, use of such equipment shall not be permitted until certification has been received from the State of Illinois that the measuring device is accurate or has been corrected.
The Laboratory has the right to refuse delivery on metered trucks with broken seals. The Contractor can be charged the added cost of obtaining #2 diesel fuel from an emergency source until the defective metering device has received the necessary certification.
The Laboratory may take periodic samples of the fuel delivered from the tank wagon or container in which delivery is made. The right is reserved by the Laboratory to cancel the contract at the Contractor’s expense for inferior deliveries, or if the product is found to contain dirt or sediment, or is of a structure that will prevent proper operation of cars, trucks or various types of power equipment.
REMEDIES FOR NONPERFORMANCE
In the event the Contractor shall fail to comply with any of the conditions herein provided and as covered by the contract, the Laboratory may notify the Contractor of such failure or default and demand that same be remedied within a reasonable time under the circumstances, but in no event more than ten (10) days. In the event of a failure of the Vendor to remedy same within said time period, the Laboratory may take steps to terminate the contract for default.
If the product supplied is not giving satisfactory performance or requires an excessive amount of repair or maintenance to the vehicles, the Contractor shall be notified in writing of the deficiencies. After such notice, the Contractor shall correct the deficiencies within a reasonable time under the circumstances, but in no event more than ten (10) days, at no cost to the Laboratory. Failure to respond may result in termination of the contract.
ARGONNE SPECIFIC SAFETY REQUIREMENTS
The Contractor’s personnel shall attend ESH construction safety training prior to the start of this service contract, and shall show proof of attendance to the Technical Coordinator. Contractor’s personnel shall comply with all ESH safety regulations while performing work at Argonne National Laboratory.
The Contractor shall provide copies of the Safety Data Sheets (SDS) for the products supplied under this contract. This information shall be provided to the Technical Representative and the Contractor shall have copies of the SDS on the work site.
The Contractor’s personnel shall check in upon arrival at the Argonne Information Center (“AIC”) with the Technical Coordinator.
The Contractor’s tank trucks and tank wagons shall comply with the U.S. Department of Transportation and Part 160 of Title 41 Illinois Administrative Code: “Storage, transportation, sale and use of gasoline and volatile oils.” Each tank truck or tank wagon shall carry a fire extinguisher suitable for extinguishing oil and gasoline fires. Such fire extinguisher shall carry a testing and listing label giving the extinguisher a rating for Class A and B fires.
Contractor’s personnel must wear Personal Protective Equipment (“PPE”) at all times during the offload operation. This PPE shall consist of: hardhat mounted full-face shield, safety glasses with side shields, proper footwear and chemical resistant gloves.
The Technical Coordinator shall coordinate assignment of a Vehicle Maintenance Mechanic/Garage Specialist for refueling operations. The Mechanic/Garage Specialist shall close the sluice gate valve on the storm sewer drain and record the time closed in the NWS-VM Fuel Dispensary Log. The Mechanic/Garage Attendant shall stick the underground storage tank and record the reading in the Log. The Mechanic/Garage Attendant shall ensure that the delivery does not exceed 85% of the tank capacity for the building 46 underground storage tank. The Vehicle Maintenance Mechanic/Garage Attendant shall log the amount of fuel received in the Fuel Dispensary Log.
The delivery truck driver shall comply with Section 170.80 of Title 41 Illinois Administrative Code Part 170 for unleaded gasoline unloading operations:
The Contractor shall furnish one (1) delivery ticket for each delivery, which contains the amount of fuel ordered for the tank. The delivery ticket shall have a notation to the driver stating that the product does not exceed 85% tank capacity and that the driver does not exceed the quantity of fuel ordered. The ticket shall also contain the amount of product pumped into the tank.
The unloading hose from the tank truck to the storage tank shall have a static wire or its equivalent and shall be equipped with a non-ferrous nozzle or tight connection nipple.
The driver, operator or attendant of any tank vehicle shall not remain in the vehicle but shall not leave the vehicle unattended during the unloading process. The delivery hose, when attached to the tank vehicle, shall be considered part of the tank vehicle.
Before unloading operations begin, the driver shall determine the quantity of fuel which can be unloaded into the storage tank without exceeding 85% capacity or overflow of product.
When transferring Class 1 Liquids, motors of tank vehicles or motors of auxiliary or portable pumps shall be shut down during making and breaking of hose connections. The Building 46 storage tank unloading process shall use the gravity flow process and the moor shall be shut down throughout the transfer operations of the Class 3 Liquids.
Smoking on or about the tank truck while unloading any flammable or combustible liquids is forbidden. Extreme care should be taken during unloading operations to keep fire away and to prevent persons within fifty (50) feet from smoking, lighting matches or carrying any flame or lighted cigar, pipe or cigarette.
Upon completion of the refueling operations, the Vehicle Maintenance Mechanic/Garage Attendant shall open the sluice gate valve on the storm sewer drain and record the time opened in the NWS-VM Building 46 Fuel Dispensary Log. The Mechanic/Garage Attendant shall stick the storage tank and record the final reading in the Fuel Dispensary Log. The Technical Coordinator shall inform the Environmental Projects Coordinator of WSE of the delivery for air emissions reporting.
File details come from the government source that posted it. Updated .