SOW_CARPET.pdf

PDF 623 KB Posted

Attached to
31050PR250000138 Carpet Replacement Sturgeon Bay
Solicitation number
31050PR250000138
Issued by

About this file

This Scope of Work (SOW) details carpet and laminate flooring replacement for six United States Coast Guard housing units located in Sturgeon Bay, Wisconsin. The contract requires removing existing carpet and padding from stairs and second floors, repairing subfloors, installing stain-resistant carpet with tucked stair installation, and replacing downstairs flooring with MSI click luxury vinyl plank in a 7" x 48" format. The contractor must supply all materials, including 3/8" spill guard padding, Dreamweaver broadloom carpet, Johnsonite rubber shims, and transition strips, with color selections subject to Coast Guard Point of Contact (POC) approval.

The solicitation is set aside for small businesses, with a firm fixed-price purchase order contract type. A mandatory vendor site visit is scheduled for March 24th at 10:00 AM Central Time at 110 N 16th Drive, Sturgeon Bay, WI, with RSVP required to Michael Curtis. The total carpeted area across the six housing units ranges from 570 to 610 square yards. Work must comply with federal, state, and local regulations, be completed within a one-week window per unit, and occur during normal work hours of 8:00 AM to 4:00 PM, Monday through Friday, excluding federal holidays. Contractors must be registered in the System for Award Management (SAM) and submit invoices through the Invoice Processing Platform (IPP).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security United States Coast Guard

Base Cleveland Housing Division

Scope of Work (SOW) Housing Site Sturgeon Bay

WI, 54235

For

Carpet replacement

Point of Contact (POC)

DC2 Michael Curtis (920)-510-3602 or

DCC Carter

(216) 902-6290 Site Addresses

110 N 16th Drive Sturgeon Bay, WI 54235

221 N 16th Drive Sturgeon Bay, WI 54235

231 N 16th Place Sturgeon Bay, WI, 54235

337 N 16th Place Sturgeon Bay, WI, 54235

133 N 16th Drive Sturgeon Bay, WI, 54235

323 N 16th Drive Sturgeon Bay, WI, 54235

VENDOR SITE VISIT:

MARCH 24TH @ 1000 CENTRAL @

110 N 16th Drive Sturgeon Bay, WI 54235

RSVP TO MICHAEL CURTIS

MICHAEL.C.CURTIS@USCG.MIL

Scope of Work

Carpet Area -

1.1 The contractor is to remove all carpet on stairs and on the second floor along with the padding to be replaced and dispose of all materials off the USCG property at the contractor expense to an approved disposal site.

1.2 The contractor will repair or replace any damaged or loose tack strips as needed; inspect and repair the subfloor for any loose staples, screws, nails, etc.; identify and report any water, pet staining or odors, or any other abnormal damages that may cause further damage or odors to the USCG POC before continuing work.

1.3 All flooring will need to be cleaned of all loose debris, swept and/or vacuumed, before installing any new materials.

1.4 Install any needed rubber shims to level the carpet with any other flooring in use and install transitions to areas connecting to different flooring materials.

1.5 Install stain resistant padding and carpet following the manufacturer’s recommendations.

1.6 Carpet installation on stairs is to be tucked.

1.7 Baseboards will be removed in a way so as not to cause damage baseboard or wall and will be reinstalled at the conclusion of work. If damage does occur, contractor will supply new baseboard that closely matches existing and install.

Laminate Flooring Install –

1.1 Contractor to remove all installed carpet and padding in the downstairs area of the home.

1.2 Contractor to remove all tack strips from old, removed carpet.

1.3 Contractor will remove all tile flooring to include any old flooring that previously was installed on top of, if applicable, (possibly two to three layers) in the dining area.

Contractor to take all lower-level flooring down to subfloor level in areas to have laminate flooring installed.

1.4 Contractor will flush cut all flooring along back and side of kitchen floor cabinetry in dining room to remove any tile or flooring in dining room without disturbing the kitchen cabinetry, flooring in kitchen area will remain along transition of kitchen entry in a clean-cut manner with a transition strip to match flooring being installed.

1.5 Contractor is to fill any cracks found in subfloor work area and if necessary, level sub-floor in preparation of new laminate flooring installation.

1.6 Contractor will use an underlayment to the specifications listed below for an extra noise and moisture barrier between the subfloor and the laminate floor to be installed. This will be provided by the contractor.

1.7 The specific flooring to be installed is indicated below under materials, this will be provided by the contractor.

1.8 All transition strips required through the unit will be matched with the flooring installed.

Minimal use of transitional strips is required per contract, if flooring can be floated through multiple rooms, then install will be completed in this manner.

1.9 Install area is to include all alcoves, closets and other flooring areas in accordance with the POC guidance upon contractor’s walkthrough for accurate worksite measurements.

1.10 This flooring will not be installed in any rooms where Toilet or Shower facilities are present. Flooring in such spaces is to be properly separated with a transition strip to match the installed floor coverings being placed by this contract.

1.11 Baseboards will be removed in a way so as not to cause damage to baseboard or wall and will be reinstalled at the conclusion of work. If damage does occur, contractor will supply new baseboard that closely matches existing and install.

\Material/ Part Information

2.1. All materials will be supplied by the contractor.

2.2. 3/8” Spill guard padding is to be used.

2.3.Dreamweaver broadloom carpet. (Color to be determined.)

2.4.All rubber shims used will be Johnsonite LS-40-E (D or E according to thickness required).

2.5.All transitions and other exposed materials planned for use will have to be approved by the POC listed for quality and color.

2.6.All hard flooring to be installed will be MSI click luxury vinyl plank, Style- Cyrus, Color- To be determined, Size- 7" x 48" with 5mm. Any deviation from this must meet the same specifications of the above flooring, especially for thickness, durability and function.

All deviations outside the flooring listed above must be previously approved by the Coast Guard listed POC.

2.7: All materials will be color checked to verify close representation of previous materials installed in unit.

Carpeted Estimate Hard Floor

Estimate Rolled Vinyl

110 N 16th Drive- Sturgeon Bay WI 54235

610 Sq. Yards 0 Sq. Feet 0 Sq. Yards

221 N 17th Drive-

570 Sq. Yards 0 Sq. Feet 0 Sq Yards

231 N 16th Place-

570 Sq. Yards

0 Sq. Feet 0 Sq. Yards

337 N 16th place-

582 Sq Yards 0Sq. Feet 0 Sq. Yards

133 N 16th Place-

582 Sq. Yards 0 Sq. Feet 0 Sq. Yards

323 N 16th Drive-

582 Sq. Yards 0 Sq. Feet 0 Sq. Yards

References

3.1 All work is to be completed shall comply with Federal, State and Local Laws, Codes and

Regulations.

Liabilities

4.1 The contractor will be financially responsible for any and all damages incurred while working on Government property.

Coordination

5.1 All communications will go through the POC listed. No work can be modified or changed without their permission.

5.2 A site visit is highly encouraged to provide valuable insight into homes.

Allowing the assessment of needs and condition of each unit to ensure quality and precise work. To schedule a site visit prior to commencing work and to accurately quote work needed, please contact the POC listed.

5.3 Work to be completed should have minimal impact on the unit’s operation. In the event any of the utilities need to be secured, these items should be well planned out.

5.4 Normal work hours for the unit are 8:00 AM to 4:00 PM, Monday-Friday, excluding all Federal Holidays. Any work outside these times needs to be worked out ahead of time.

5.5 All required License, Certificates, Accreditation Card, etc. will be submitted with the quote or bid.

Project Completion

6.1 All work completed is up to the POC’s approval. The site is to be at a minimum as clean of a condition it was found in. All trash, debris, materials removed, etc. should be properly disposed of by the contractor. There will be no on-site storage available for the duration of this project.

6.2 This contract will be awarded for multiple addresses, all with different start schedules;

these will not run consecutively but as available units become vacant. The contractor will be given a one-week window to schedule and complete each job. The Coast Guard POC will attempt to provide a 30-day notice prior to the availability timeline as they can do so.

133 N 16th drive carpet stairs

133 N 16th drive carpet

353 N 16th place carpet (example)

353 N 16th place carpet (example)

File details come from the government source that posted it. Updated .