This Statement of Work (SOW) outlines requirements for gutter cleaning and roof inspection services at Building 1302 in Langley Air Force Base, VA. The contractor must be a Virginia Licensed General Contractor and will clean approximately 830 feet of gutters, repair leaking seams/holes, fabricate and install missing rake edge metal, reattach loose fascia metal, and inspect dormer flashing and roof for deficiencies with photographic documentation.

The work must be completed within 100 calendar days after receipt of order, with normal business hours being 7:00 AM to 4:00 PM Monday through Friday. A site visit is scheduled for December 5, 2024 at 10:00 AM EST. The contractor must provide all materials, equipment, and labor, comply with federal/state/local safety and environmental regulations, and clean the worksite daily. The government will perform inspection and acceptance of work. All contractor-generated waste must be disposed of at an off-base approved site, with no government-provided dumpsters or equipment. Work coordination must go through Facility Manager Lucia Miranda at 757-225-5258.

View the file

Other files

File Type Posted
Questions and Answers for the 497 ISR Wing.pdf PDF
updated SOW B1302 Gutter cleaning_Roof inspection.docx DOCX document
Wall damage from gutter.jpg JPG image
SOW B1302 Gutter cleaning_Roof inspection Updated.pdf PDF
Missing Rake.jpg JPG image
Overall picture.jpg JPG image
Wall damage 3.jpg JPG image
Wall damage from gutter_2.jpg JPG image
3.1302 Roof pictures.pdf PDF
Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 26 November 2024

SUBJECT: Gutter Cleaning and Roof Inspection

Title: Gutter Cleaning and Roof Inspection B1302 Service Request Number: 15287938 Location: 586 Weyland, Langley AFB, VA 23665

1. Scope of Work:

Facility 1302 in Langley Air Force Base requires the services of a Virginia Licensed General Contractor to provide all materials, equipment and labor to clean, and discard all the debris from all the gutters on building 1302. Approximately 830' of the gutters require repair of any leaking seams or holes in the gutter. Require the contractor to fabricate and install rake edge metal where missing. Reattach loose fascia metal. Inspect dormer flashing for deficiencies. Inspect roof for deficiencies and if found photograph and provide list to customer.

A. Clean and discard all debris from gutters on F. 1302.

• Repair any leaking seams or holes found in gutters B. Fabricate and install rake edge metal where missing C. Re-attach loose fascia metal D. Inspect dormer flashing for deficiencies

• Take photographs and note deficiencies to provide to customer E. Inspect roof for deficiencies

• Take photographs and note deficiencies to provide to customer

2. Contractor will comply with all federal, state and local safety and environmental regulations

3. Contractor will clean worksite daily at the completion of the workday.

4. SCHEDULING.

a. The 497 ISR ISRW is needing Gutter Cleaning and Roof Inspection for building 1302

• A site visit will be accomplished December 5, 2024 at 10:00 a.m. EST. If you require a pass to access the facility for this visit, please contact Kelly Voigts kelly.voigts.3@us.af.mil immediately to ensure quick processing of your request.

• The contractor shall schedule and coordinate all work with the Facility Manager, Lucia Miranda. Please relate all questions to her at telephone number 757-225- 5258.

• The contract performance period shall not exceed 100 calendar days after receipt of order. All work shall be inspected by the government for final approval and acceptance.

5. PROTECTION OF GOVERNMENT PROPERTY.

a. The contractor shall protect government property to the extent necessary to prevent damage. The contractor shall use drop cloths, shields, vents, and other protective devices as necessary to accomplish work under this contract. Contractor shall remove fixtures and equipment as necessary to accomplish work under this contract. Contractor shall reinstall all removed components and ensure that they are returned to the same operational condition as prior to removal.

6. HOURS OF OPERATION.

a. The contractor shall perform all work during the normal business hours of 7:00 AM to 4:00 PM Monday through Friday. Work outside of normal business hours shall be requested from and approved by the Facility Manager, Lucia Miranda. The contractor is not required to perform work during federal holidays.

7. WORK TO BE PERFORMED

a. Clean and discard all debris from gutters on F. 1302.

b. Repair any leaking seams or holes found in gutters

c. Fabricate and install rake edge metal where missing

d. Re-attach loose fascia metal

e. Inspect dormer flashing for deficiencies

• Take photographs and note deficiencies to provide to customer

f. Inspect roof for deficiencies

• Take photographs and note deficiencies to provide to customer

8. QUALITY ASSURANCE.

a. The government will perform inspection and acceptance of contractor work.

9. ENVIRONMENTAL COMPLIANCE.

a. The contractor shall comply with all applicable federal, state, and local environmental laws and regulations.

10. CLEAN-UP.

a. The contractor shall dispose of all contractor generated waste at an off-base city or state approved disposal site. Contractor shall clean-up work site at the end of each working day.

The government will not provide any dumpsters, material, tools, equipment or any other supplies or labor required to perform this service.