About this file

This is a GSA memorandum dated April 16, 2024, issuing a metric waiver for the FY24 PBS Design and Construction Program. The waiver allows all project documentation and construction materials to be in imperial units rather than metric units for the World Trade Bridge Land Port of Entry project in Laredo, TX.

The waiver is justified based on several key factors: increased costs of 20-30% for implementing metric requirements, reduced labor productivity by 10-20% due to workers being trained in imperial units, procurement delays, and increased risk of coordination errors. The memorandum cites specific challenges including the local industry's lack of experience with metric construction, increased complexity in modernizing existing facilities built in imperial units, and ongoing operational costs due to limited availability of metric products. The waiver is authorized under Executive Order 12770 (1991) which allows exemptions when metric usage would cause significant inefficiencies or loss of markets to U.S. firms. The document is signed by Charles Hardy, Chief Architect and Assistant Commissioner Office of Architecture & Engineering.

View the file

Other files

File Type Posted
Amendment 0004-SF30 47PH0825R0002 0004.pdf PDF
Amendment 0003-SF30 47PH0825R0002 0003 w attachments.pdf PDF
Amendment 0003-WTB LPOE Bid Sheets_Excel Format.xlsx XLSX spreadsheet
Amendment 0002-SF30 47PH0825R0002 0002.pdf PDF
Amendment 0001-SF30 47PH0825R0002 0001 w attachments.pdf PDF
SOL Attachment 4. Factor 4 Sustainability Factor Instruc.pdf PDF
SOL Attachment 6. GSA 527_CTR Quals & Financial Info.pdf PDF
SOW Attachment - Traffic and Pavement Study.pdf PDF
SF 1442 and Pricing Sheets.pdf PDF
Division 01 Specs Combined.pdf PDF
Solicitation (SOL)-WTB LPOE BRIC_FINAL.pdf PDF
SOL Reference Material_ P-100 v2024.pdf PDF
SOL Attachment 13. Standard Form 24 Bid Bond.pdf PDF
SOL Attachment 12. Asphalt-GSA IRA LEC Requirements.pdf PDF
Agreement-WTB LPOE BRIC_FINAL.pdf PDF
SOL Attachment 8. Post Award Allocation Form IRA.pdf PDF
SOL Attachment 7. Offeror Reps & Certs_May 2024.pdf PDF
SOL Attachment 1. GACA for Google Drive.pdf PDF
Statement of Work (SOW)_WTB LPOE BRIC_11-20-24_FINAL.pdf PDF
SOL Attachment 5. WD #TX20240003_Highway_1-5-24.pdf PDF
SOL Attachment 9. IRA Proj Submittal Form & Data Dictionary.pdf PDF
SOL Attachment 10. Concrete-GSA IRA LEC Requirements.pdf PDF
SOL Attachment 3. Past Experience_PPQ_Factor 2.pdf PDF
SOL Attachment 11. Steel-GSA IRA LEC Requirements.pdf PDF
SOW Attachment - Communications Plan Template.pdf PDF
SOL Attachment 5. WD #TX20240273_Building_11-22-24.pdf PDF
SOL Attachment 2. Past Experience_PPQ_Factor 1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .