SOL Attachment 8. Post Award Allocation Form IRA.pdf
PDF 220 KB Posted
- Solicitation number
- 47PH0825R0002
About this file
This is a Post Award Allocation Form template specifically designed for tracking Inflation Reduction Act (IRA) related costs for a design-build construction project. The form is divided into several key sections including project details, owner/contractor information, scope of work, materials/services not included, assumptions, and net zero contributions.
The form includes a detailed PBS MasterFormat CSI breakdown of construction divisions (00-48) with specific emphasis on tracking low embodied carbon (LEC) materials separately from traditional materials, including dedicated line items for LEC concrete, steel, glass, and asphalt. The form includes space for identifying whether work is self-performed or subcontracted, along with associated costs. Additional sections cover general conditions, insurances, bonds, overhead, and profit calculations. The template appears designed to help track and allocate IRA-specific funding requirements while maintaining standard construction cost accounting practices.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME
BUILDING NAME
BUILDING ADDRESS
BUILDING NUMBER
ESTIMATED START DATE
PERIOD OF
PERFORMANCE
DAYS
SOLICITATION # DELIVERY METHOD
Design Build - Performance
OWNER COMPANY NAME
CONTRACTOR
COMPANY NAME
OWNER CONTACT NAME
CONTRACTOR
CONTACT NAME
ADDRESS ADDRESS
OWNER PHONE
CONTRACTOR
PHONE
OWNER EMAIL
CONTRACTOR
TEXT
NET ZERO CONTRIBUTIONS
TEXT
POST AWARD ALLOCATION FORM IRA
OWNER INFORMATION CONTRACTOR INFORMATION
SCOPE OF WORK
TEXT
MATERIALS AND SERVICES NOT INCLUDED
TEXT
ASSUMPTIONS
Div. 00 Div. 00A Div. 00B Div. 01 Div. 02 Div. 03 0 Div. 03A Div 03.B Div. 04 Div. 05 0 Div. 05A Div 05.B Div. 06 Div. 07 Div. 08 0 Div. 08A Div 05.B Div. 09 Div. 10 Div. 11 Div. 12 Div. 13 Div. 14 Div. 21 Div. 22 Div. 23 Div. 26.1 Div. 26.2 Div. 27 Div. 28.1 Div. 28.2 Div. 31 Div. 32 0 Div. 32.A Div. 32.B Div. 33 Div. 34 Div. 35 Div. 40 Div. 41 Div. 42 Div. 43 Div. 44 Div. 45 Div. 46 Div. 48
Subtotal $0.00
Subtotal $0.00
$0.00
Estimated Cost of Work Overhead Profit
#NAME?
Water and Wastewater Equipment Electrical Power Generation
Trade Cost General Conditions Insurances (General Liability, Subcontractor Performance, Builders Risk Program) Payment and Performance Bond
PBS MASTERFORMAT CSI
MasterformatCSI System Elements (Trade Work) Self Performed/Subcontracted? Amount Design Services - for Design Build High Performing Green Buildings Emerging and Sustainable Technologies General Requirements (Please Include Jobsite Overhead) Existing Conditions Concrete Low Embodied Carbon Concrete Non LEC Concrete Masonry Metals Low Embodied Carbon Steel Non LEC Metals Wood, Plastics, Composites Thermal and Moisture Protection Openings Low Embodied Carbon Glass Non LEC Openings Finishes Specialties Equipment Furnishings Special Construction Conveying Equipment Fire Suppression Plumbing Heating, Ventilating, and Air Conditioning (HVAC) Electrical Lighting Communications Electronic Safety Electronic Security (TI - Non-BSAC) Earthwork Exterior Improvements LEC Asphalt Rest of Exterior Improvements
Process Heating, Cooling and Drying Equipment Process Gas and Liquid Handling, Purification and Storage Equipment Pollution and Waste Control Equipment Industry Specific Manufacturing Equipment
Utilities Transportation Waterway and Marine Construction Process Integration Material Processing and Handling Equipment
| Post Award Allocation Form IRA2 |
| Post Award Allocation Form IRA |
File details come from the government source that posted it. Updated .