About this file

This is a Post Award Allocation Form template specifically designed for tracking Inflation Reduction Act (IRA) related costs for a design-build construction project. The form is divided into several key sections including project details, owner/contractor information, scope of work, materials/services not included, assumptions, and net zero contributions.

The form includes a detailed PBS MasterFormat CSI breakdown of construction divisions (00-48) with specific emphasis on tracking low embodied carbon (LEC) materials separately from traditional materials, including dedicated line items for LEC concrete, steel, glass, and asphalt. The form includes space for identifying whether work is self-performed or subcontracted, along with associated costs. Additional sections cover general conditions, insurances, bonds, overhead, and profit calculations. The template appears designed to help track and allocate IRA-specific funding requirements while maintaining standard construction cost accounting practices.

View the file

Other files

File Type Posted
Amendment 0004-SF30 47PH0825R0002 0004.pdf PDF
Amendment 0003-SF30 47PH0825R0002 0003 w attachments.pdf PDF
Amendment 0003-WTB LPOE Bid Sheets_Excel Format.xlsx XLSX spreadsheet
Amendment 0002-SF30 47PH0825R0002 0002.pdf PDF
Amendment 0001-SF30 47PH0825R0002 0001 w attachments.pdf PDF
SOL Attachment 4. Factor 4 Sustainability Factor Instruc.pdf PDF
SOL Attachment 6. GSA 527_CTR Quals & Financial Info.pdf PDF
SOW Attachment - Traffic and Pavement Study.pdf PDF
SF 1442 and Pricing Sheets.pdf PDF
Division 01 Specs Combined.pdf PDF
Solicitation (SOL)-WTB LPOE BRIC_FINAL.pdf PDF
SOW Attachment - FY2024 Metric Waiver.pdf PDF
SOL Reference Material_ P-100 v2024.pdf PDF
SOL Attachment 13. Standard Form 24 Bid Bond.pdf PDF
SOL Attachment 12. Asphalt-GSA IRA LEC Requirements.pdf PDF
Agreement-WTB LPOE BRIC_FINAL.pdf PDF
SOL Attachment 7. Offeror Reps & Certs_May 2024.pdf PDF
SOL Attachment 1. GACA for Google Drive.pdf PDF
Statement of Work (SOW)_WTB LPOE BRIC_11-20-24_FINAL.pdf PDF
SOL Attachment 5. WD #TX20240003_Highway_1-5-24.pdf PDF
SOL Attachment 9. IRA Proj Submittal Form & Data Dictionary.pdf PDF
SOL Attachment 10. Concrete-GSA IRA LEC Requirements.pdf PDF
SOL Attachment 3. Past Experience_PPQ_Factor 2.pdf PDF
SOL Attachment 11. Steel-GSA IRA LEC Requirements.pdf PDF
SOW Attachment - Communications Plan Template.pdf PDF
SOL Attachment 5. WD #TX20240273_Building_11-22-24.pdf PDF
SOL Attachment 2. Past Experience_PPQ_Factor 1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME

BUILDING NAME

BUILDING ADDRESS

BUILDING NUMBER

ESTIMATED START DATE

PERIOD OF

PERFORMANCE

DAYS

SOLICITATION # DELIVERY METHOD

Design Build - Performance

OWNER COMPANY NAME

CONTRACTOR

COMPANY NAME

OWNER CONTACT NAME

CONTRACTOR

CONTACT NAME

ADDRESS ADDRESS

OWNER PHONE

CONTRACTOR

PHONE

OWNER EMAIL

CONTRACTOR

EMAIL

TEXT

NET ZERO CONTRIBUTIONS

TEXT

POST AWARD ALLOCATION FORM IRA

OWNER INFORMATION CONTRACTOR INFORMATION

SCOPE OF WORK

TEXT

MATERIALS AND SERVICES NOT INCLUDED

TEXT

ASSUMPTIONS

Div. 00 Div. 00A Div. 00B Div. 01 Div. 02 Div. 03 0 Div. 03A Div 03.B Div. 04 Div. 05 0 Div. 05A Div 05.B Div. 06 Div. 07 Div. 08 0 Div. 08A Div 05.B Div. 09 Div. 10 Div. 11 Div. 12 Div. 13 Div. 14 Div. 21 Div. 22 Div. 23 Div. 26.1 Div. 26.2 Div. 27 Div. 28.1 Div. 28.2 Div. 31 Div. 32 0 Div. 32.A Div. 32.B Div. 33 Div. 34 Div. 35 Div. 40 Div. 41 Div. 42 Div. 43 Div. 44 Div. 45 Div. 46 Div. 48

Subtotal $0.00

Subtotal $0.00

$0.00

Estimated Cost of Work Overhead Profit

#NAME?

Water and Wastewater Equipment Electrical Power Generation

Trade Cost General Conditions Insurances (General Liability, Subcontractor Performance, Builders Risk Program) Payment and Performance Bond

PBS MASTERFORMAT CSI

MasterformatCSI System Elements (Trade Work) Self Performed/Subcontracted? Amount Design Services - for Design Build High Performing Green Buildings Emerging and Sustainable Technologies General Requirements (Please Include Jobsite Overhead) Existing Conditions Concrete Low Embodied Carbon Concrete Non LEC Concrete Masonry Metals Low Embodied Carbon Steel Non LEC Metals Wood, Plastics, Composites Thermal and Moisture Protection Openings Low Embodied Carbon Glass Non LEC Openings Finishes Specialties Equipment Furnishings Special Construction Conveying Equipment Fire Suppression Plumbing Heating, Ventilating, and Air Conditioning (HVAC) Electrical Lighting Communications Electronic Safety Electronic Security (TI - Non-BSAC) Earthwork Exterior Improvements LEC Asphalt Rest of Exterior Improvements

Process Heating, Cooling and Drying Equipment Process Gas and Liquid Handling, Purification and Storage Equipment Pollution and Waste Control Equipment Industry Specific Manufacturing Equipment

Utilities Transportation Waterway and Marine Construction Process Integration Material Processing and Handling Equipment

Post Award Allocation Form IRA2
Post Award Allocation Form IRA

File details come from the government source that posted it. Updated .