SOW Attachment F - Schedule of Submittals.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Repair Fence Refueling Parking Area
Solicitation number
FA309926Q0007
Issued by

About this file

This is a Schedule of Submittals document for a Design-Build project (Project #25-1011) to repair and replace the chain link security fence at the Refueling Parking Area at Laughlin Air Force Base. The schedule outlines all required contractor submittals organized across four notice-to-proceed (NTP) phases with specific deadlines and deliverable requirements.

Pre-construction submittals (NTP 1-3) include AF Form 103 within 7 days of NTP 1; design-related items such as a 65% design package, 95% design package, and 100% design package with 42-day and 35-day intervals respectively following government approvals; and compliance documentation including Entry Access Lists, OPSEC and Antiterrorism training proof, Contractor Safety Plan, QC Manager Qualifications, QC Plan, Construction Site Plan, and Traffic Control Plan—all due within 30 days of NTP 3. Environmental and hazardous material submittals include Hazardous Material Approvals, Asbestos Hazard Abatement Plans, TCEQ water system notifications and forms, and related certifications, with most due prior to NTP 4. Construction phase submittals (NTP 4) include QC Daily Inspection Reports, weekly Progress Schedule Forms, biweekly meeting minutes, Materials Testing reports, and Hazmat Usage Logs submitted monthly. Final submittals include Records of Existing Conditions within 14 days of NTP 2, As-Built Drawings within 2 weeks of Final Inspection, Operation and Maintenance Data, Completion Inspection punchlist, Draft and Final DD Form 1354 documents, and a Construction Warranty Management Plan. Digital copies are required for all submittals, with paper copy requirements specified for select items such as design drawings.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittals Schedule SCHEDULE OF SUBMITTALS PROJECT # 25-1011 PROJECT TITLE: REPAIR FENCE REFUELING PARKING AREA, F2420 SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALC = Construction Project D = Design ProjectLAUGHLIN DIV 01 SPECIFICATIONSENVIRONMENTAL QUALITY CONSTRUCTION SPECIFICATIONS LAFBSTATEMENT OF WORK OR OBJECTIVESNUMBER OF PAPER COPIES REQUIRED. DIGITAL COPIES ARE REQUIRED FOR ALL SUBMITTALSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS

APPR

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DIS

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

NTP 1 - AF Form 103
Submit AF Form 103C2.22.6.7, 6.1, 6.4Submit 7 days after Notice to Proceed 1
Submit completed and approved AF Form 1032.22.6.7, 6.1, 6.4Within 49 days from NTP 1
On-Site Investigation AgendaD6.414 Calendar days prior to NTP 2
NTP 2 - Design
Entry Access List (EAL)D1.8.22 Weeks prior to base access
Proof of OPSEC TrainingD2.42 Weeks prior to base access
Antiterrorism Level I Awareness TrainingC, D2.42 Weeks prior to base access
Summary of site investigationD6.4NLT 14 Days after NTP 2
95% Design PackageD6.42 (drawings only)NLT 42 days after Government approved 65% design submittal
100% Design PackageD6.42 (drawings only)NLT 35 calendar days after Government approved 95% design submittal
Statement of WorkD3.1.3.8NLT 35 calendar days after Government approved 95% design submittal
Initial Progress ScheduleD6.1.1Within 5 Days after receiving NTP1
Progress Schedule Form and Contract Progress ReportC, D6.1.1, 6.1.2Biweekly
Meeting MinutesD6.2.1NLT 3 Days after meeting
NTP 3 - Pre Construction
Entry Access List (EAL)C1.8.22 Weeks prior to base access
Proof of OPSEC TrainingC, D2.42 weeks prior to base access
Contractor Safety PlanC3.2.2NLT 30 days after NTP 3
Certificate of Contractor Safety Compliance3.2.3NLT 7 days after NTP 3
QC Manager QualificationsC, D4.2.3NLT 7 days after NTP 3
QC PlanC, D4.2.4NLT 30 days after NTP 3
Construction Site Plan12.1NLT 30 days after NTP 3
Hazardous Material Approval (Safety Data Sheets)C3.2.1NLT 30 days after NTP 3 (as required)
Hazardous Waste Training Certificate3.2.2Prior to NTP 4

(as required) Hazardous Waste / Material Procedures 3.2.2 Prior to NTP 4 (as required)

Public Water System Notification3.4.1NLT 30 days after NTP 3 (as required)
Customer Service Inspection Certificate (TCEQ Form 20699)3.4.1Prior to NTP 4

(as required) TCEQ Public water system plan review submittal form (TCEQ Form 10233) 3.4.1 Prior to NTP 4 (as required) Clean Water Act TCEQ’s General Permit 3.4.2 Prior to NTP 4 (as required)

Asbestos Hazard Abatement Plan3.5.2.1NLT 10 days prior to construction start
Copy of notification to Department of State Health Services3.5.2.1NLT 10 days prior to construction start
Worker/Area Protection Plan3.5.2.2Prior to NTP 4

(as required) FOD Plan C 14.1 Prior to NTP 4 (as required)

Traffic Control PlanC, D12.25.3, 5.5NLT 30 Days after NTP 3
Records of Existing ConditionsC, D1.5, 7.1.14.2, 4.4, 5.5NLT 30 Days after NTP 3
Submittals per Contractor's Design SOWD10.4.4 through 10.4.11TBD
NTP 4 - Construction
Non-Hazardous Waste Disposal Manifest and/or Waste Shipment RecordC5.1 / 6.2NLT 45 days from the date of signature of receiving facility
Hazardous Waste Disposal ManifestsC5.2 / 6.2As required, prior to removal from Government property
Hazmat Usage LogC6.1End of each month during construction
QC Daily Inspection ReportsC4.2.6Weekly
Progress Schedule Form and Contract Progress ReportC6.1Biweekly
Meeting MinutesC6.2.1NLT 3 Days after meeting
Records of Existing ConditionsC7.1.1NLT 14 days after NTP 2
Materials TestingC7.1.3As required, within 7 days of test
Submittals per Contractor's Design SOWC10.4.4 through 10.4.11TBD
Operation and Maintenance DataC10.4.12NLT 2 weeks after Final Inspection
As Built Drawings/CAD FilesC10.4.132 (D size)NLT 2 weeks after Final Inspection
Completion Inspection (QC Manager Punchlist)C13.4NLT 3 days after Pre-Final Inspection
Draft DD Form 1354C13.3Prior to Pre-Final Inspection
Final DD Form 1354C13.3At Final Inspection
Submittal registry at 95%C3.1.6NLT 42 days after Government approved 65% design submittal
Submittal registry at 100%C3.1.6NLT 35 calendar days after Government approved 95% design submittal
Construction Warranty Management PlanC13.2NLT 2 weeks after Final Inspection
Project Specific Submittals
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
Schedule of Submittals Template, Feb 05 (SAF/AQCP)

Task Order # FA3099-16-D-0002-0002 SOW Atch 2

&"Times New Roman,Regular"&12Page &P of &N

File details come from the government source that posted it. Updated .