SOW Attachment (8) Contractor Production Report Form.docx

DOCX document 23 KB Posted

Attached to
NSWCPD Bldg. 4 - VRF Heat Pump Installation
Solicitation number
N6449825R4054
Issued by

About this file

The file is a Contractor Production Report form for a construction project involving HVAC installation at Building 4 - 3rd Floor Pavilion. The form is designed to track daily construction activities, safety measures, equipment usage, and work progress. It includes sections for documenting weather conditions, work hours, job safety meetings, potential accidents, equipment and material received, and any specific safety actions or inspections conducted during the workday. The form serves as a comprehensive daily log for contractors to record and report project-specific details, with checkboxes and fields for noting critical information such as safety incidents, equipment usage, and work performed.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

CONTRACT NO
TITLE AND LOCATION

REPORT NO

Building 4 – 3rd Floor Pavilion HVAC – Phase 2

CONTRACTOR

SUPERINTENDENT

AM WEATHER

PM WEATHER

MAX TEMP (F)
MIN TEMP (F)

WORK PERFORMED TODAY

Schedule Activity No.

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

|_| YES
|_| NO
TOTAL WORK HOURS ON JOB SITE,

THIS DATE, INCL CON'T SHEETS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

|_| YES
|_| NO
CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.)

|_| YES
|_| NO

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed action.)

|_| YES
|_| NO

Schedule Activity No.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
|_|
SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Schedule Activity No.

Submittal #
Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule Activity No.

Owner
Description of Construction Equipment Used Today (incl Make and Model)
Hours Used

Schedule Activity No.

REMARKS

CONTRACTOR/SUPERINTENDENT
DATE

Standard SOW Attachment (8) Contractor Production Report Form Sheet 1 of 1