This document is a Past Performance Questionnaire (PPQ) for a Naval Surface Warfare Center Philadelphia Division contract (N00024-16-R-3208 N6449825R4054) for a VRF Heat Pump Installation project in Building 4. The solicitation is a small business set-aside procurement for installing a two-pipe variable refrigerant flow heat pump system, including an outdoor unit, four ceiling cassette units, associated controls, refrigerant and drain piping, electrical wiring, and accessories. The project will be located in the Philadelphia Naval Business Center, with work to be performed between 0700-1600 Monday through Friday, and a contract completion date of 135 days after award.
The PPQ template provides a comprehensive evaluation framework for assessing contractor performance across multiple dimensions, including cost control, schedule adherence, mission requirements, quality, business relations, safety, coordination, risk management, and security. Contractors are required to complete the company-specific information, forward the questionnaire to clients, and ensure submission to Rishi Mathur and David Rhoads via email before the closing date. The evaluation uses a 5-point rating scale from Exceptional (5) to Unsatisfactory (1), with specific criteria for each rating level, and includes sections for contract information, contract relevancy, performance assessment, and recommendation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00024-16-R-3208 N6449825R4054
The Naval Surface Warfare Center Philadelphia Division (NSWCPD) Bldg. 4- VRF Heat Pump Installation Attachment 12 Past Performance Questionnaire
The Contractor shall complete the company specific information on this form for past performance project examples that the Contractor will be providing, contact their clients, forward this form to their clients and request that their clients complete it and send it via email to the listed individual before the closing time for receipt of offers: Rishi Mathur; rishi.m.mathur.civ@us.navy.mil and David Rhoads; david.a.rhoads8.civ@us.navy.mil. This will expedite the response from each referenced source.
Please title the subject line of the e-mail to read “SOLICITATION NO. N6449825R4054 – Past Performance Questionnaire”
*NOTE: IT IS THE RESPONSIBILITY OF THE OFFEROR TO ENSURE ALL PAST PERFORMANCE QUESTIONNAIRES ARE SUBMITTED TO THE GOVERNMENT BY THE CLOSING DATE AND TIME.
If you need more space than that provided, please attach additional pages. Responses will be treated as source selection sensitive information. If you have any questions, please contact the Contracting Officer at the above e-mail addresses.
1. Contract Information. Please complete the following:
Contractor:
Contract Number:
Period of Performance (Starting and Completion Dates, month and year):
Dollar Amount at Award:
Dollar Amount at Completion (or Current Dollar Amount, if not Completed):
Contract Type: Fixed-Price; Labor Hour or Time and Material; Cost-Reimbursement (CPFF, CPAF, CPIF, etc.)
Describe the Project Location, for example, town, city, state, building name, or building number, etc.
Describe the Project and the Services provided, for example: Industrial or Commercial Fire Alarm system installation. Industrial or Commercial Fire Alarm Notification System.
2. Contract Relevancy. For comparison with the size and scope of this acquisition, please provide the following information pertaining to the contract identified in Section 2 above:
Scope: Check all that apply:
______ Project Management ______ HVAC Repair Projects ______ HVAC Installation Projects ______ Quality Control ______ Acquisition and Contract Management Support ______ Technical Expertise ______ Other Support (please describe: __________________________________________)
3. Performance Assessment Values.
5 - Exceptional. Performance meets contractual requirements and exceeds many to the client’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Client. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
4 – Very Good. Performance meets contractual requirements and exceeds some to the client’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, identify a significant event and state how it was a benefit to the Client. There should have been no significant weaknesses identified.
3 - Satisfactory. Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
2. – Marginal. Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Client. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
1 - Unsatisfactory. Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Client. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
0 - Not Applicable. Unable to provide a score. Performance in this area not applicable to effort assessed.
4. Assessment Elements. Please select/circle the appropriate performance assessment value for each item on the questionnaire and provide supporting narrative.
a. Cost Control. Rate the contractor’s effectiveness in forecasting, managing, and controlling cost (including reporting and analyzing variances) and ability to deliver at the agreed-to cost/price. Provide reasons for changes to the contract value (e.g., scope changes, overrun/underrun, Government-imposed schedule changes).
5 4 3 2 1 0
Comments:
b. Schedule. Rate the contractor’s ability to deliver according to the agreed-to schedule. What were the causes of any schedule variances?
5 4 3 2 1 0
Comments:
c. Mission Requirements. Rate the contractor’s ability to provide a product or service that met your mission requirements.
5 4 3 2 1 0
Comments:
d. Quality. Rate the contractor’s ability to provide a product or service that met your required level of quality. Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety and health standards.). Assess the contractor’s ability to test system performance characteristics and provide technical reports on the results.
5 4 3 2 1 0
Comments:
e. Business Relations. Rate the contractor’s ability to integrate and coordinate all activities needed to execute the contract, specifically the timeliness, completeness, quality of problem resolution, corrective action plans, the contractor’s history of reasonable and cooperative behavior, customer satisfaction, and its ability to submit accurate invoices in a timely manner.
5 4 3 2 1 0
Comments:
f. Safety Environment. To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
5 4 3 2 1 0
Comments:
g. Coordination. Rate the contractor’s ability to coordinate system outages with your facility’s needs and minimize the time the system is out-of-service.
5 4 3 2 1 0
Comments:
h. Proactive to Potential Risks. Rate the Contractor’s ability to proactively identify risk areas, mitigate risks, and respond to emergency and critical situations?
5 4 3 2 1 0
Comments:
i. Security. Rate the Contractor’s compliance with all security requirements for the project and personnel security requirements.
5 4 3 2 1 0
Comments:
j. Recommendation. To what extent would you recommend this contractor for additional contracts? Rate on the following scale: 5 = Yes, definitely; 4 = Yes, likely; 3 = Maybe, 2 = No, not likely; 1 = No, not ever; 0 = N/A.
5 4 3 2 1 0
Comments:
k. Did the contractor perform work such that the work-site remained in a clean and organized manner throughout the execution of work?
5 4 3 2 1 0
Comments:
5. Other References. If you are aware of any other contract or a Point of Contact (POC) who is familiar with the contractor’s performance under this contract, please identify.
Name, Phone, and E-Mail Address:
6. Assessor Information. Please provide the following information about yourself:
Name:
Title:
Address:
Phone Number:
E-Mail Address:
Thank you for your assistance.