SOW Attachment (8) Contractor Production Report Form.doc
DOC document 61 KB Posted
- Attached to
- NSWCPD Building 77H Fuel Pump Controller Repairs Federal contract opportunity
- Solicitation number
- N6449823R4003
About this file
This solicitation requests proposals for repairs to a fuel pump controller and distribution system located at a Naval facility. The Naval Surface Warfare Center, Philadelphia Division intends to issue a request for proposal to replace piping, instrumentation, controls, and other elements in the fuel oil control and storage system at Building 77H and an adjacent fuel compound. Work is to be performed on weekdays between 7:00 and 16:30 or on weekends and evenings with advance approval. The period of performance is 160 days from notice to proceed. The acquisition will use lowest price technically acceptable evaluation criteria and consider bonding, past performance, and price factors. Initial proposals are due by January 25, 2023 with award intended without discussions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449823R4003 Amendment 0001.pdf | ||
| Attachment (13) Construction Cost Breakdown.xlsx | XLSX spreadsheet | |
| N6449823R4003.pdf | ||
| SOW Attachment (3) Historical Reference Drawing.pdf | ||
| SOW Attachment (7) Mobile Construction Equipment Checklist.pdf | ||
| SOW Attachment (10) Eng_Form_4025-R.pdf | ||
| SOW Attachment (2) Control Panel As-Built Dwgs.pdf | ||
| SOW Attachment (5) Requirements for Contractor Lift Operations.pdf | ||
| SOW Attachment (6) Activity Hazard Analysis Form.docx | DOCX document | |
| SOW Attachment (9) SECNAV 5512.pdf | ||
| SOW Attachment (1) Contract Drawings.pdf | ||
| SOW Attachment (4) NSWCPD Entry Screening Assessment 1 SEPT 2022 Rev 13.pdf | ||
| Attachment (11) Bid Bond SF24.pdf | ||
| Attachment (12) Past Performance Questionnaire (PPQ).doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule
Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS ON JOB SITE,
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
Schedule
Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| FORMCHECKBOX |
SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule
Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule
Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule
Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW Attachment (8) Sheet 1 of 1