Attachment (13) Construction Cost Breakdown.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
NSWCPD Building 77H Fuel Pump Controller Repairs Federal contract opportunity
Solicitation number
N6449823R4003
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document provides details for a forthcoming federal solicitation seeking repair services for a fuel pump controller and associated distribution system located at the Naval Surface Warfare Center in Philadelphia, Pennsylvania. Work will include replacing various piping, instrumentation, controls, and other elements to return the fuel distribution system to a state allowing for local and remote operation and monitoring of equipment. The period of performance is 160 days from notice to proceed. The acquisition will use lowest price technically acceptable evaluation criteria and best value determination. Evaluation factors are bonding, past performance, and price. Initial proposals are due by January 25, 2023. The Navy intends to award without discussions based on initial proposals. A site visit is strongly encouraged and details will be in the solicitation. The solicitation number is N6449823R4003 and will be issued on or around December 19, 2022 via SAM.gov.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sht03

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht02

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht01

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

BACK

INSTRUCTIONS FOR COMPLETING

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 3). Items and units of measure will be
furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract
will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 3 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
TOTAL MATERIAL COSTS$0.00
SALES TAX ON MATERIALS%$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD%$0.00
PROFIT%$0.00
SUBTOTAL$0.00
BOND%$0.00
TOTAL PROJECT COST$0.00

DATE FIRM NAME

TITLEBY
(Signature)

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .