SOW Attachment (8) Contractor Production Report Form.doc

DOC document 61 KB Posted

Attached to
Bldg 4. Rooftop Chiller Philadelphia Naval Business Center
Solicitation number
21-SEL-031
Issued by

About this file

This document contains a contractor production report form and details of a related federal contract opportunity for chiller replacement services. The contractor production report form is used to track daily progress on the Building 4 Rooftop Chiller Replacement project at the Naval Business Center in Philadelphia. It requires the contractor to provide information such as weather conditions, work completed, safety inspections, equipment received and used, manhours spent, and any issues that arose.

The related federal contract opportunity is a solicitation for selective deconstruction, draining and removal of an existing chiller and replacement with a new air-cooled 150-ton chiller at the same location. The work must be performed between 0700-1630 hours Monday through Friday or on weekends for crane lifting. The period of performance is estimated at 120 days after notice to proceed. The soliciting agency is the Department of the Navy Naval Sea Systems Command for this chiller replacement project at the Naval Business Center in Philadelphia.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

CONTRACT NO
TITLE AND LOCATION

REPORT NO

Building 1000 – Air Handlers AS-5 and 6 Repairs

CONTRACTOR

SUPERINTENDENT

AM WEATHER

PM WEATHER

MAX TEMP (F)
MIN TEMP (F)

WORK PERFORMED TODAY

Schedule

Activity No.

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

FORMCHECKBOX

YES

FORMCHECKBOX

NO

TOTAL WORK HOURS ON JOB SITE,

THIS DATE, INCL CON'T SHEETS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed action.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

Schedule

Activity No.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
FORMCHECKBOX

SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Schedule

Activity No.

Submittal #
Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule

Activity No.

Owner
Description of Construction Equipment Used Today (incl Make and Model)
Hours Used

Schedule

Activity No.

REMARKS

CONTRACTOR/SUPERINTENDENT
DATE

SOW Attachment (8) Bldg. 4 Roof-Top Chiller Replacement

Contractor Production Report Form

Sheet 1 of 1