This document contains a federal contract opportunity and related attachments for a roof-top chiller replacement project. The Naval Surface Warfare Center, Philadelphia Division is seeking to replace Chiller-3 at the Naval Business Center in Building 4 with an air-cooled 150-ton rotary-screw or scroll-type chiller. Attachments include design drawings of the existing chiller installation and photographs. The selective deconstruction, draining, and removal of the existing chiller must be completed between 0700 to 1630 Monday through Friday unless otherwise specified. Crane lifting operations will occur on a Saturday or Sunday between 0700 to 1630. Work requiring outages to electrical or mechanical systems other than the existing chiller must take place off-hours Monday through Friday between 1900 and 0500 or on a Saturday or Sunday between 0700 to 1630. The period of performance is estimated at 120 days after receipt of the notice to proceed. The solicitation was issued by the Department of the Navy Naval Sea Systems Command.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SO

W

A tta ch m en t (

1)

Bl dg

. 4 R oo f-T op C hi lle r R ep la ce m en t Ex is tin g C

H -3

D es ig n

D ra w in gs

Note: Chiller-3 drawings provided are design drawings of the existing chiller installation which includes the structural, electrical, and mechanical systems. Drawings do not fully represent as-built conditions and must be verified by the Contractor prior to starting any work. Refer to Attachment

(2) for photographs of the existing installation.

A tta ch m en

. 4 R oo f-T op C hi lle r R ep la ce m en t Ex is tin g C

H -3

D es ig n

D ra w in gs

A tta ch m en

. 4 R oo f-T op C hi lle r R ep la ce m en t Ex is tin g C

H -3

D es ig n

D ra w

A tta ch m en

. 4 R oo f-T op C hi lle r R ep la ce m en t Ex is tin g C

H -3

D es ig n

D ra w

A tta ch m en

. 4 R oo f-T op C hi lle r R ep la ce m en t Ex is tin g C

H -3

D es ig n

D ra w

File details come from the government source that posted it. Updated .