21R4027-A0001.pdf

PDF 1 MB Posted

Attached to
Bldg 4. Rooftop Chiller Philadelphia Naval Business Center
Solicitation number
21-SEL-031
Issued by

About this file

This document outlines a request for proposal for a building chiller replacement project at the Naval Surface Warfare Center in Philadelphia. The Navy intends to replace an existing air-cooled chiller unit in Building 4 with a new rotary-screw or scroll-type chiller rated at a minimum of 150 tons. The scope of work includes removing the old unit, installing the new chiller, and updating controls and piping. Work is to be performed between 0700 and 1630 hours Monday through Friday, with crane lifts scheduled on weekends to minimize impacts. Outages requiring work outside of normal hours must occur evenings or weekends. The period of performance is estimated at 120 days from notice to proceed.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 to solicitation N6449821R4027 is hereby issued to provide responses to questions recieved. Questions and Answ ers continue on page 2. The SOW has been updated based on the Questions and Answ ers provided.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 47

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6449821R4027

X 9B. DATED (SEE ITEM 11)

20-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2021

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 0222, SHANNON LUTES

215-897-1454, SHANNON.LUTES@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6449821R4027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

The responses to questions received for N6449821R4027 are as follows:

Q1) The existing steel is to be mechanically cleaned, primed and painted. Does this include the top of the steel where the existing chiller now sits, and also where the new chiller will be installed? If this area is included, it will require two crane mobilizations, one to remove the old chiller, and one to install the new chiller. If this steel does not need to be painted, only one crane mobilization will be required.

A1) At minimum, a recoatable base/primer coat shall be provided to the contact area between the new chiller unit and existing steel structure. This contact area generally includes the top surface of the beam flanges used to support the chiller unit. Use of a recoatable primer will allow coating of the aforementioned area with one crane mobilization as coating systems exist with a tack-free drying schedule of 30 minutes or less (primer only). All other areas of the steel structure shall require a primer, intermediate, and topcoat as specified in the solicitation. As an alternative coating material system, the contractor may utilize a primer coat meeting the following specifications and shall provide an intermediate and top coat as specified if this primer is selected:

STATEMENT OF WORK - DIVISION 09 - FINISHES

Paragraph 9.4.4 - Primer Coat: Recoatable epoxy system suitable for steel substrate with low VOC emissions.

Abrasion resistance complies with ASTM D4060 with a CS17 wheel, 1000 cycles, and a 1 kg load with a 200 mg loss or less. Corrosion weather complies with ASTM D5894 for 12 cycles and 4368 hours with a Rating 7 for rusting (per ASTM D610) and Rating 10 for blistering (per ASTM D714). Dry heat resistance complies with ASTM D2485, Method A Quench Test at 250 degrees Fahrenheit. Moisture Condensation Resistance complies with ASTM D4585 100 degrees Fahrenheit for 2000 hours with a Rating 10 for rusting (per ASTM D610) and Rating 10 for blistering (per ASTM D714). Apply in accordance with manufacturer’s instructions. In areas where the primer coating is the only coat, allow the primer to dry to a tack-free state before covering with equipment.

Paragraph 9.4.5 - Intermediate and Top Coat: Provide intermediate and topcoats as recommended by manufacturer of primer coat for hot-dipped galvanized steel. Intermediate and top coats are not required where new equipment shall be in contact with the existing steel support structure; intermediate and top coats are required in all other areas as detailed in Division 09 of the contract specifications.

All other terms and conditions for finish systems in the contract documents remain unchanged unless otherwise specified above.

Q2) Are there currently mechanical (flanged or victaulic) connections above the roof for the Chilled Water Supply and Return Piping, or will a weld joint be required at this location?

A2) The existing connections at the roof-top roof penetration are Victaulic-make grooved-connections.

Q3) Will there be the opportunity to invoice for materials before the project is completed?

A3) Progress payments based on percentage completed is authorized via clause 52.232-5. Materials installed may be invoiced in accordance with 52.232-5.

Q4) Is this project covered by any prevailing wage requirements?

A4) Yes, please see the updated wages as of 6 August 2021 provided below.

Q5) In reading the requirements for content and delivery of proposals, Page 10, Section 3.2 states that “Offerors shall submit signed Section K signed Representations, Certifications and Acknowledgements and System for Award Management (SAM).” Can you confirm that, in lieu of submitting full text, it is sufficient for offerors to identify a provision by paragraph and provide appropriate information as opposed to completing the RFP document in its entirety (as stated in previous paragraph on Page 10)?

A5) In accordance with provision 52.204-8, Offerors may elect to utilize the representations and certifications contained in its entity registration at SAM.gov in lieu of providing signed Section K representations. See 52.204-8 for full details.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGES

"General Decision Number: PA20210003 08/06/2021

Superseded General Decision Number: PA20200003

State: Pennsylvania

Construction Type: Building

County: Philadelphia County in Pennsylvania.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 01/15/2021 3 05/07/2021 4 05/14/2021 5 05/21/2021 6 06/04/2021 7 07/02/2021 8 07/09/2021 9 07/16/2021 10 08/06/2021

ASBE0014-001 05/01/2021

Rates Fringes

Asbestos Workers/Insulator Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 54.35 39.70

BOIL0013-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 45.89 33.39

BRPA0001-006 05/01/2019

Rates Fringes

BRICKLAYER.......................$ 43.45 29.36

BRPA0001-008 05/01/2019

Rates Fringes

TILE SETTER......................$ 46.50 27.38

BRPA0001-011 05/01/2020

Rates Fringes

MASON - STONE....................$ 44.25 30.10

BRPA0001-015 05/01/2019

Rates Fringes

Pointer, caulker and cleaner.....$ 44.75 28.45

CARP0158-001 05/01/2020

Rates Fringes

Carpenter/Lather.................$ 49.42 28.49

CARP0219-005 05/01/2021

Rates Fringes

MILLWRIGHT.......................$ 48.09 33.70

CARP0251-001 05/01/2020

Rates Fringes

FLOOR LAYER: Carpet.............$ 50.06 28.99

CARP0441-004 05/01/2020

Rates Fringes

PILEDRIVERMAN....................$ 43.70 37.22

ELEC0098-003 05/03/2021

Rates Fringes

ELECTRICIAN......................$ 64.03 60%+1.92

ELEV0005-001 01/01/2021

Rates Fringes

ELEVATOR MECHANIC................$ 61.43 35.825+a+b

FOOTNOTES FOR ELEVATOR MECHANICS:

A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

* ENGI0542-002 05/01/2021

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 49.50 31.51

GROUP 1a....................$ 52.51 32.39

GROUP 2.....................$ 49.25 31.44

GROUP 2a....................$ 52.27 32.31

GROUP 3.....................$ 45.16 30.24

GROUP 4.....................$ 44.86 30.15

GROUP 5.....................$ 43.14 29.64

GROUP 6.....................$ 42.16 29.34

FOOTNOTE: A. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day and Christmas Day

***TOXIC/HARARDOUS WASTE REMOVAL***

Add 20 per cent to basic hourly rate for all classifications

BOOM LENGTH PAY:

On all machines with booms, jibs, masts and leads, including tower cranes, 100 ft. from ground up, fifty cents ($.50) per hour additional will be paid for each increment of 25

ft. over 100 ft. On cranes with booms (including jibs, masts and leads) 200 ft. and over, two (2) operators will be required. When two (2) operators are employed, no Oiler will be required. Booms to be measured from the ground up.

Tower cranes calculated from ground up and out for purpose of boom pay.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Handling steel and stone in connection with erection, cranes doing hook work, any machine handling machinery, helicopters, concrete pumps building machines similar to the above, including remote, robotic or laser control equipment.

GROUP 1a: Machines handling steel, or the functional equivalent, and stone in connection with erection 15 ton and over factory rating; Cranes doing hook work 15 ton and over factory rating; Any machines handling machinery; HIgh Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 ton and over factory rating;

Concrete Pumps (Building) 120 feet of Boom length or less (200 yard pour or less); Machines similar to above, including remote, robotic or laser control equipment;

Equipment in this Wage Group that does not require an oiler.

GROUP 2: All types of cranes, All types of backhoes, Cableways, Draglines, Keystones, all types of shovels, Derricks, Pavers 21E and over, Trenching machines, Trench shovel, Gradalls, Front-End loaders, Boat Captain, Pippin type backhoes, Tandems scrapers, Towers type crane operation erecting, Dismantling, Jumping or Jacking, Drills (self-containes), (drillmaster type) forklift (20 ft. and over), Moter patrols (fine grade), Batch plant with mixer, Carryalls, Scraper, Trounapulls, Roller (Hith Grade Finishing), Spreaders (asphalt), Bulldozers and Tractors, Mechanic welder, Conveyor loaders (euclid-type wheel), Concrete pump, Milling Machines, Hoist with two towers, Building hoist double drum (unless used as a single drum), Mucking machines in tunnel, All auto grade and concrete finishing machines, Bundle pullers/extractors (tublar), bobcat. side broom, directional boring machines, vermeer saw type machines(other than than hand held tractor mounted hydro axe, chipper with boom, all) machine similar to the above including remote, robotic or laser control equipment.

GROUP 2a: Crawler backhoes and Crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; All types of cranes 15 ton and over factory rating; Cherry picker type machinery and equipment 15 ton and over factory rating; Concrete Pumps (Heavy/Highway); Machines similar to above, including remote, robotic or laser control equipment; Equipment in this Wage Group that does not require an oiler.

GROUP 3: Asphalt plant engineers, Well drillers, Ditch witch (small trencher), Motor patrols, Fine grade machines, Ten-ton roller (grade fill stone base), Concrete breaking machines, Guilloline only, Stump grinder, Conveyors (except building conveyors), Fork lift trucks of all types, High pressure boliers Elevator Operator (New Construction) Machine similar to the above,including remote, robotic or laser control equipment

GROUP 4: Seaman, Pulverzer form line grader, Farm tractors, road finishing, Concrete spreader, Power broom (self-contained), Seed spreader, Grease truck, toxic/hazardous wate removal rate 20 per cent added to all classifications and machiines similar to the above including remote, robotic or laser control equipment.

GROUP 5: Compressors pumps, Well point pumps, Welding machines Tireman, Power equipment, Maintenance engineer (power boats),Elevator Operators (Renovations) and machine similar to the above including remote, robotic or laser control equipment.

GROUP 6: Fireman, Oilers and deck hands (personnel boats), grease truck. Machines similar to the above including remote, robotic or laser control equipment.

IRON0401-002 07/01/2021

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 47.70 39.10

IRON0405-002 07/01/2021

Rates Fringes

IRONWORKER, REINFORCING..........$ 47.41 32.50

The following holidays shall be observed and when work is performed thereon it shall be paid for at twice the base rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Employees shall be off Christmas Eve Day and receive four hours pay.

Employees who have to work on Christmas Eve Day shall work four hours and be paid for eight hours pay for the holiday.

Any time worked beyond fours hours shall be paid at the double time rate plus the four hours holiday pay. To receive holiday pay, the employee must work the day before Christmas Eve and the first working day after Christmas Day.

IRON0405-004 07/01/2021

IRONWORKER (Rigger and Machinery Mover).................$ 43.72 32.25

The following holidays shall be observed and when work is performed thereon it shall be paid for at twice the base rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Employees shall be off Christmas Eve Day and receive four hours pay.

Employees who have to work on Christmas Eve Day shall work four hours and be paid for eight hours pay for the holiday.

Any time worked beyond fours hours shall be paid at the double time rate plus the four hours holiday pay. To receive holiday pay, the employee must work the day before Christmas Eve and the first working day after Christmas Day.

LABO0332-001 05/01/2021

Rates Fringes

LABORER

GROUP 1....................$ 34.20 25.99

GROUP 2....................$ 34.30 25.99

GROUP 3....................$ 34.35 25.99

GROUP 4....................$ 34.50 25.99

GROUP 5....................$ 34.60 25.99

GROUP 6....................$ 34.34 25.99

GROUP 7....................$ 35.45 25.99

GROUP 8....................$ 35.60 25.99

GROUP 9....................$ 35.75 25.99

GROUP 10....................$ 36.00 25.99

GROUP 11....................$ 34.57 25.99

LABORERS CLASSIFICATIONS

GROUP 1: Building site work; Stripping and dismantling concrete form work; loading, unloading, carrying and handling of all reinforced steel and steel mesh; handling lumber and other building materials; operating jackhammers, paving breakers and all other pneumatic tools; building scaffolds; raking, shoveling and tamping of asphalt;

spading and concrete pit work; grading; form pinning;

shoring; demolition except burners; laying conduits and ducts; sheathing; lagging; laying non-metallic pipe and caulking; all other types of laborers; pouring concrete;

operating vibrator; free air tunnels: miners.

GROUP 2: Power buggies; burners on demolition

GROUP 3: Wagon drill operator (single)

GROUP 4: Powdermen; wagon drill operator (multiple);

circular caisson excavation; underpinning excavation

GROUP 5: Caisson bottom man

GROUP 6: Yard workers

GROUP 7: Trackmen; brakemen; groutmen; bottom shaft men;

all other men in free air tunnels

GROUP 8: Form setters

GROUP 9: Miners bore driver; blasters; drillers; pneumatic shield operators

GROUP 10: Welders and burners

GROUP 11: Mason Tender

LABO0332-002 05/01/2021

Rates Fringes

LABORER (Asbestos Abatement, Toxic and Hazardous Waste Removal, Lead Based Paint Removal).........................$ 35.70 26.24

LABO0413-004 05/01/2021

Rates Fringes

Landscape Laborer Farm Tractor Driver, Hydroseeder Nozzleman and Mulcher Nozzleman...........$ 27.15 23.30+A

FOOTNOTE:

A. PAID HOLIDAYS: Independence Day, Labor Day, and Thanksgiving Day.

MARB0001-003 05/01/2012

Rates Fringes

MARBLE FINISHER..................$ 29.27 20.07

TERRAZZO FINISHER................$ 33.06 19.31

TILE FINISHER....................$ 29.77 20.55

MARB0003-002 05/01/2012

Rates Fringes

MARBLE SETTER....................$ 35.25 21.95

TERRAZZO WORKER/SETTER...........$ 26.40 21.95

PAIN0021-001 05/01/2020

Rates Fringes

Painters:

Brush, Roller...............$ 40.14 27.65 Spray, Steel and Swing......$ 41.39 27.65

PAIN0021-012 05/01/2020

DRYWALL FINISHER/TAPER...........$ 40.68 28.83

PAIN0252-001 06/01/2019

Rates Fringes

Window Tinter....................$ 24.52 12.06

PAIN0252-006 05/01/2020

Rates Fringes

GLAZIER..........................$ 44.92 32.85

PLAS0008-001 05/01/2020

Rates Fringes

PLASTERER........................$ 41.02 31.15

PLAS0592-011 05/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 39.45 33.26

PLUM0420-008 05/01/2021

Rates Fringes

Steamfitter......................$ 62.32 38.73

PLUM0690-002 05/01/2021

Rates Fringes

PLUMBER..........................$ 59.83 35.86

ROOF0030-001 05/01/2021

Rates Fringes

Roofers:

Composition.................$ 40.33 32.62+A Shingles....................$ 30.50 21.20+A Slate and Tile..............$ 33.50 21.20+A

FOOTNOTE (Composition Roofer only):

A. PAID HOLIDAY: Election Day

SFPA0692-001 05/01/2021

Rates Fringes

SPRINKLER FITTER.................$ 60.83 30.34

SHEE0019-008 05/01/2021

SHEET METAL WORKER...............$ 53.84 44.44

* SHEE0019-023 07/17/2021

Rates Fringes

SHEET METAL WORKER (Sign Makers & Hangers)................$ 29.49 23.90

TEAM0107-001 05/01/2020

Rates Fringes

TRUCK DRIVER (BUILDING

CONSTRUCTION)

GROUP 1.....................$ 33.22 19.675+a+b GROUP 2.....................$ 33.32 19.675+a+b GROUP 3.....................$ 33.57 19.675+a+b

TRUCK DRIVER (SITE

PREPARATION, PAVING AND

UTILITIES ON BUILDING

CONSTRUCTION)

GROUP 1.....................$ 33.07 19.675+a+b GROUP 2.....................$ 33.17 19.675+a+b GROUP 3.....................$ 33.42 19.675+a+b

TRUCK DRIVERS CLASSIFICATIONS (BUILDING CONSTRUCTION)

GROUP 1 - Stake body truck (single axle), 11/2 ton and under vehicles

GROUP 2 - Truck driver over 11/2 tons, dump trucks, tandem and batch trucks, semi-trailers, agitator mixer trucks and dumcrete type vehicle, asphalt distributors, farm tractors when used for transportation, stake body truck (tandem)

GROUP 3 - Euclid type, off-highway equipment - back or belly dump trucks and double-hitched equipment, straddle (ross) carrier, lowbed trailers

TRUCK DRIVERS CLASSIFICATIONS (SITE PREPARATION, PAVING AND

UTILITIES ON BUILDING CONSTRUCTION)

GROUP 1 - Stake body truck (single axle), dumpster

GROUP 2 - Dump trucks, tandem and batch trucks, semi-trailers, agitator mixer trucks, and dumpcrete type vehicles, asphalt distributors, farm tractor when used for transportation, stake body truck (tandem)

GROUP 3 - Euclid type, off-highway equipment or bell dump trucks and double hitched equipment, staddle (ross) carrier, low-bed trailers

FOOTNOTE:

A. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, Thanksgiving Day and five personal holidays provided employee works at least one day in the three work days before and at least one day in the three work days after the said holiday. Emloyee earns a personal holiday every two months, provided employee has worked twenty-six day in each consecutive two month period, up to a maximum of five per calendar year. After 130 work days the employee is entitled to all five personal holidays.

B. PAID VACATION: Employee will earn one vacation day for every two months, provided employee has worked twenty-six day in each consecutive two month period, up to a maximum of five vacation days per calendar year. After 130 workdays the employee is entitled to all five days of vacation. Employees with 5 years of seniority, earn an additional week of vacation, accrued in the same way.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

STATEMENT OF WORK

BLDG 4 ROOF-TOP CHILLER REPLACEMENT

STATEMENT OF WORK

1.0 DIVISION 01 – GENERAL REQUIREMENTS

Section 01 11 00 – Summary of Work

1.1 SYNOPSIS: Work detailed herein is located in Bldg 4 that is a 210,000 gross square foot, four-story

Government building located at the Philadelphia Naval Business Center (PNBC), Philadelphia, PA 19112.

The building uses three (3) chillers controlled by a local Direct Digital Control (DDC) system integrated into an Automated Logic Corporation (ALC) Building Automation System (BAS) to meet building chilled water requirements. Chiller-1 (CH-1) and Chiller-2 (CH-2), each providing up to 580 gallons per minute (GPM) of chilled water, are located on the fourth floor of the building in the mechanical room and act as the primary chillers for the building. Chiller-3 (CH-3) acts as a back-up chiller for CH-1 and CH-2 when one of the two chillers is undergoing maintenance. When commanded by the logic controller, CH-3 is activated and supplies up to 305 GPM of chilled water. Chiller-3, which is the subject of this contract, is located on the roof of the infill area of Bldg 4 and was installed circa 2002. The unit is nearing the end of its service life and requires replacement. The existing CH-3 unit is an air-cooled Carrier 30GXR 160-Ton, 460V/3PH/60Hz, 6-stage screw-type chiller using 134A refrigerant and is located on structural steel dunnage. The CH-3 chiller unit is supplied power from a 480V, 3-Phase, 4 wire substation which is fed from a 1500 kVA transformer. The overcurrent protection device for CH-3 is a 480V/3P/400A LA molded case circuit breaker with an adjustable magnetic setting that supplies power to 3-500MCM insulated copper conductors fed through a 3-1/2 inch conduit to a NEMA 3R service disconnect. This service disconnect provides power to CH-3. Mechanical, electrical, and civil-structural drawings of the existing chiller unit are provided in Attachment 1. Note that the drawings are final design drawings and do not fully reflect as-built conditions. The Contractor must verify the drawings to the extent that affects the work detailed herein prior to starting any work on this contract.

Photographs of existing conditions are provided in Attachment 2.

The scope of this contract includes the selective deconstruction, draining, and removal of Chiller-3 and replacement with an air-cooled 150-Ton (minimum nominal capacity), 480V/3PH/60Hz, rotary-screw or scroll-type chiller with open protocol BACnet control and communication capabilities. The Contractor shall provide a chiller unit with the salient physical, functional, and performance characteristics defined herein.

The Carrier 30RBX-150 Aquasnap Air-Cooled Scroll Chiller with 150-ton nominal capacity meets the specifications defined in the Statement of Work. Prior to installing the new chiller unit, the structural steel dunnage supporting the unit shall be prepared and coated with a rust-inhibitive coating system. Work subsequent to steel coating shall include, but is not limited to, the installation of the chiller unit, controller, electrical, and mechanical systems, DDC programming and graphics, and acceptance and performance testing new chiller system. All chilled water piping, fittings, and gages from the exterior surface of the roof penetration to the chiller shall be removed and replaced.

The Contractor must select chiller unit with a minimum nominal cooling capacity of 150 Tons meeting the specifications detailed herein and must also select a chiller unit with an operating weight of no more than 9100 pounds (lbs.) to avoid structural modifications to the existing steel dunnage and underlying structural substructure. The existing unit weighs approximately 9027 lbs. during operation. The new chiller unit must be dimensionally-sized to the existing steel dunnage to support the unit as required by the manufacturer.

Dimensions of the existing steel structure are provided in Attachment 1. The demolition and/or installation of the chiller unit may require relocation of the operator platform adjacent to the access panels and may require the temporary relocation of existing communication antennas adjacent to the equipment and other equipment (e.g., equipment disconnects and DDC equipment) shown in Attachment 2.

All work associated with termination of communication cabling into the main Automated Logic Building Automation System (BAS) DDC system, new system design and development of the associated shop drawings, and programming of the controllers tied into the Automated Logic BAS DDC system must be completed by personnel with training as detailed in SOW Paragraph 1.16.12.

Work generally shall be scheduled during normal business hours with the exception of crane lifts and any outages affecting building systems or equipment other than CH-3. Details on working hours are provided in Statement of Work (SOW) Paragraph 1.14.

1.2 DEFINABLE FEATURES OF WORK: Work required to support the replacement of Chiller-3 shall include, but not be limited to, the following definable features of work:

1.2.1 Demolition and deconstruction work associated with the existing roof-top chiller (CH-3) detailed in

SOW Paragraph 2.8. Demolition to include electrical wiring, conduit, and equipment from roof-top safety switch to chiller. Demolition also shall include removal of chilled water circuit supply and return piping from the roof penetration to the chiller. Demolition work shall include removal and disposal.

1.2.2 Exterior steel surface preparation and coating work of structural steel dunnage detailed in SOW Paragraph 9.5.

1.2.3 Mechanical work detailed in SOW Paragraphs 23.7 and 23.22 including installation, calibration, and testing of the chiller and the installation of chilled water piping, joints, gages, and accessories.

Additionally, relocation of the operator’s platform may be required to support chiller installation and access to the electrical and controller cabinets.

1.2.4 Direct Digital Controls work detailed in SOW Paragraph 23.15 including installation and termination of low voltage control wiring and conduit between the new chiller and existing BAS hardware. DDC work shall also include programming, graphical interface development, and testing of all points.

1.2.5 Electrical work including installation of a fused safety switch, conductors, conduit, and hangers as detailed in SOW Paragraph 26.4.

1.3 SITE LOCATION: The work is located on Government-owned property at the Philadelphia Naval Business

Center, also known as the Philadelphia Navy Yard. The work is located in Naval Surface Warfare Center Philadelphia Division (NSWCPD) Building 4 having street address of 5001 South Broad St, Philadelphia, PA 19112. See Attachment 3 for overall site location within PNBC. Bldg 4 was originally constructed circa 1880 and underwent a major renovation circa 1980 that created useable space within the original structure commonly referred to as the “in-fill area.” Bldg 4 is approximately 210,000 gross square feet and has capacity for about 1,000 personnel.

1.4 GOVERNMENT TECHNICAL POINT OF CONTACT (TPOC): The TPOC is a representative of the

NSWCPD Procuring Contracting Officer for this contract and provides technical and administrative assistance related to the subject contract and work. All scheduling and coordination shall be through the

NSWCPD TPOC.

Section 01 14 00 – Work Restrictions

1.5 GOVERNMENT FURNISHED UTILITIES: The Government shall furnish the following utility services for use as may be required for the work to be performed under the contract: electricity and potable water.

Government-furnished electricity may be used by the Contractor unless contractor’s use adversely impacts a building’s electrical distribution system and equipment or the Contractor’s equipment exceeds the available capacity of the outlet. Information concerning the location of existing outlets may be obtained from the NSWCPD TPOC and are not guaranteed to be located immediately adjacent to the project site. The Contractor shall provide and maintain the necessary service lines from existing Government outlets to the site of the work. For the utilities specified above, they shall be furnished at no cost to the Contractor. In the event that the Government is unable to provide the required types of utilities, the Contractor shall arrange for the required utilities.

1.6 PERMITS: The Contractor shall obtain all appointments, licenses, and permits required for the prosecution of the work. The Contractor shall comply with all applicable or relevant and appropriate federal, state, and local laws. Evidence of such permits and licenses shall be provided to the Contracting Officer or his/her representative before work commences.

1.7 INSTALLATION ACCESS, SECURITY, AND CONTRACTOR BADGES AND IDENTIFICATION

1.7.1 No employee or representative of the Contractor shall be admitted to the work site unless the employee has satisfactorily completed an installation-pass application (business/Contractor-employee) and has furnished satisfactory proof that the employee is a citizen of the United States.

The Government Security Office shall approve each installation-pass application before the employee or representative shall be authorized admittance to the work site by NSWCPD.

1.7.2 Contractor and subcontractor personnel shall carry photographic identification (ID) on their person at all times on-site for review by Government Security or Access Control Personnel upon request.

For each day on NSWCPD property, the contractor shall complete the current version of the NSWCPD COVID-19 Screening and Self-Assessment Questionnaire (Attachment 4) for each employee. If there are any “Yes” answers, the contractor shall contact the TPOC, the Procuring Contractor Officer, or Contract Specialist.

1.7.3 Citizenship Requirements: Work under this contract is restricted to U.S. citizens. No employee or representative of the Contractor shall be admitted to the work site unless he/she furnishes satisfactory proof that he/she is a citizen of the United States. In accordance with current NSWCPD security protocol, contractor employees who hold dual citizenship shall not be granted security clearance to our facilities. Documents acceptable for Proof of Citizenship include:

1.7.3.1 Birth registration card.

1.7.3.2 Certificate of live birth, birth certificate.

1.7.3.3 Certificate of Naturalization.

1.7.3.4 Certificate of registration.

1.7.3.5 DD-214 (Shall Cite Birthplace).

1.7.3.6 DD Form 4 (Contract for Enlistment and Shall Cite Birthplace).

1.7.3.7 DD 1966 (Application for Enlistment).

1.7.3.8 Military discharge papers (shall cite birthplace).

1.7.3.9 Delayed birth certificate.

1.7.3.10 Hawaii certificate of foreign birth.

1.7.3.11 Hospital birth certificate.

1.7.3.12 Marriage license certificate.

1.7.3.13 Merchant marine certificate.

1.7.3.14 Military officer ID card.

1.7.3.15 Notification of birth registration.

1.7.3.16 State of Hawaii ID card.

1.7.3.17 USA passport.

1.7.3.18 Verbal inquiry with State of Hawaii Vital Statistics Office.

1.7.4 Application for Contractor Identification Badges: The Contractor's employees or representatives who shall be working inside NSWCPD facilities or secure perimeters shall obtain a Contractor's ID badge that can be valid for up to 12 months or the duration of the contract, whichever is less.

For all Contractor employees or representatives that do not have a CONFIDENTIAL or higher security clearance, the Contractor shall provide a completed SECNAV 5512/1 (DoN Local Population ID Card/Base Access Registration Form) for each employee or representative to the NSWCPD TPOC for CNRMA (Command Navy Region Mid-Atlantic) vetting, review and approval.

The 5512 forms shall be submitted following the directions on Page 3 of the form and shall be submitted within 14 calendar days following the award of the contract for all employees requiring building or site access. The SECNAV 5512/1 form is available for download from:

https://www.cnic.navy.mil/content/dam/cnic/cnrma/pdfs/CVS/PASS_ID_FORM.pdf. Contractor may submit forms containing Personally Identifiable Information (PII) using the DoD Secure Access File Exchange (SAFE). Contact the TPOC for more details following contract award.

Once approved, the Contractor's employees shall report to Security (Bldg 29) with two forms of identification for issuance of the ID badge. The Contractor shall obtain the required employee ID badges from the Government. The ID badge shall be returned within 5 calendar days to Security (Bldg 29) when an employee leaves the Contractor's service, when the job is complete, or the ID badge has expired. The Government is not responsible for any cost or lost time associated with obtaining or the use of daily or Contractor ID badges.

One-Day Visitor Badges: The Contractor's employees or representatives can obtain a daily Visitor's badge from the Security desk inside NSWCPD facilities. However, a Government escort shall be required at all times, and the badge shall only be valid for the facility where the badge was issued.

The use of daily visitor's ID badge is not recommended, as a Government escort shall be scheduled in advance and escort's availability is limited and granted on a case-by-case basis (i.e., availability is not guaranteed). The Contractor's personnel would have to obtain daily passes, be subject to daily mandatory vehicle inspection, and would have limited access to the installation if using a Visitor badge. The Government is not responsible for any cost or lost time associated with escort availability in conjunction with the use of Visitor’s badges for the Contractor’s employees or representatives.

1.7.5 General Access Requirements and Restrictions: The following access requirements and restrictions apply to work at any NSWCPD facility or secured perimeter.

1.7.5.1 No employee or representative of the Contractor shall be admitted to the site of the work unless they have satisfactorily completed the Application for Contractor Identification Badge process and have furnished satisfactory proof that they are a citizen of the United States. The Government Security Office shall approve each base application form before the employee or representative shall be authorized admittance to the site of work by the Government.

1.7.5.2 The Contractor is responsible to collect and account for all identification badges issued to its personnel at the expiration of the contract, expiration of the badge or when no longer required. Collected badges shall be returned by the Contractor to the NSWCPD Security Office (Bldg 29).

1.7.5.3 Comply with all security regulations and policy currently in force by the Government Security Office having jurisdiction and as communicated directly by Government Security personnel or as conveyed by the NSWCPD TPOC.

1.7.5.4 Employees or representatives of the Contractor, while working at NSWCPD, shall display the Government issued badge over the front of their outer clothing at all times.

1.7.5.5 Roll up/garage doors shall only be permitted to be opened by Government personnel or Access Control Personnel (ACP). The ACP or Government personnel shall guard the door during the entire time the door is un-secured. The doors shall be secured immediately following its use, unless otherwise permitted by the Command Security Director.

1.7.5.6 Fence gates shall only be permitted to be opened by Government personnel or Access Control Personnel (ACP). The ACP or Government personnel shall guard the gate during the entire time the gate is un-secured. The gate shall be secured immediately following its use, unless otherwise permitted by the Command Security Director.

1.7.5.7 Commercial vehicles (with company logo) that are required to enter the fence line perimeter or enter the building at any NSWCPD facility shall be inspected by the Government Mobile Vehicle Inspection Team (MVIT) currently situated adjacent to Bldg 753 along Langley Avenue prior to entering the Philadelphia Navy Yard property.

Location is shown on Attachment 1. No personally-owned vehicles (POVs) are permitted within the fence line perimeter of any NSWCPD facility. Coordinate vehicle inspections with the NSWCPD TPOC.

1.7.5.8 No Contractor or personally-owned cameras are allowed inside NSWCPD facilities. If photographs are required for design or work records, submit a written request to the NSWCPD TPOC or Procuring Contracting Officer to have photographs taken by a Government Official using a Government camera. Photographs taken by the Government shall be reviewed by Security before release to the Contractor and may not be released to the Contractor.

1.7.5.9 If a security alarm is required to be temporarily disabled for a work activity, the Contractor shall submit a completed Request to Mask Security Alarm form to the NSWCPD TPOC at least three business days in advance of the required date. The

NSWCPD TPOC will coordinate with the NSWCPD Security Office to obtain approval for the request.

1.8 IDENTIFICATION OF CONTRACTOR EMPLOYEES

1.8.1 The Contractor shall provide to the Contracting Officer the name or names of the responsible supervisory person or persons authorized to act for the Contractor as outlined in NSWCPD Site Access Requirements.

1.8.2 The Contractor shall furnish sufficient personnel to perform all work specified within the contract and complete the work by the Contract Completion Date (CCD).

1.8.3 Contractor employees shall conduct themselves in a proper, efficient, courteous, and businesslike manner.

1.8.4 The Contractor shall remove from the site any individual whose continued employment is deemed by the Procuring Contracting Officer to be contrary to the public interest or inconsistent with the best interests of National Security.

1.8.5 No employee or representative of the Contractor shall be admitted to the site of work until and unless they have satisfactorily met, the requirements outlined in NSWCPD Site Access Requirements.

1.8.6 All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment.

Employee identification shall not be substituted for station required passes or badges.

1.8.7 All contractor personnel shall carry photographic ID at all times while on site to present to security access personnel and Government law enforcement officers.

1.9 IDENTIFICATION OF CONTRACTOR VEHICLES: The Contractor shall obtain parking passes for company vehicles, if required, from the Procuring Contracting Officer. The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate and safety inspection sticker, if applicable, and shall be maintained in good repair. See SOW Paragraph 1.7.5.7 above about inspection of Contractor commercial vehicles by the Government MVIT.

1.10 OPERATIONAL SECURITY (OPSEC): The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List, (CIL) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWC PD's CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence

(FOCI).

CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations. Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.

NSWCPD's CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public…

This is the start of the file's text. The full file is on GovTribe.