SOW Attachment (6) Mobile Construction Equipment Checklist.pdf

PDF 1 MB Posted

Attached to
Bldg 4. Rooftop Chiller Philadelphia Naval Business Center
Solicitation number
21-SEL-031
Issued by

About this file

This solicitation is for a roof-top chiller replacement project at the Naval Surface Warfare Center in Philadelphia. The Naval Sea Systems Command intends to issue a Request for Proposal for selective deconstruction, draining, and removal of an existing 150-ton chiller and its replacement with an air-cooled, rotary-screw or scroll-type chiller with BACnet control capabilities. The estimated period of performance is 120 days from notice to proceed. Crane lifting operations must occur on weekends between 0700 to 1630 to minimize parking impacts, while other work requiring outages can take place between 1900 to 0500 Monday through Friday or weekends from 0700 to 1630.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Attachment (6) Bldg. 4 Roof-Top Chiller Replacement

Mobile Construction Equipment Checklist

SOW Attachment (6) Bldg. 4 Roof-Top Chiller Replacement

Mobile Construction Equipment Checklist