This document contains an activity hazard analysis form and statement of work attachment for a federal contract opportunity to replace a chiller at the Naval Surface Warfare Center in Philadelphia. The contractor will deconstruct, drain, and remove an existing 150-ton chiller and replace it with an air-cooled rotary-screw or scroll-type chiller with open protocol BACnet control capabilities. Work must occur between 0700 to 1630 Monday through Friday or on weekends, and crane lifting operations are specified for weekends to minimize parking impacts. Outages to electrical or mechanical systems other than the chiller require off-hours work. The period of performance is estimated at 120 days after notice to proceed. Safety requirements include activity hazard analyses signed by supervisors and employees, and the government reserves the right to require revisions to ensure all work sequences and hazards are adequately addressed.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EM385-1-1 (30NOV14) UFGS 103526 11/15
Activity Hazard Analysis (AHA)
Contractor Name ( Performing the Work):
Overall Risk Assessment Code (RAC) (Use highest code )
Foreman Signature (Pe r forming the Wor k):
AHA Prepared by (Name/Title):
| Activity/Work Task: |
| Risk Assessment Code (RAC) Matrix |
AHA Signature Log #
Probability
| Contract Number: |
| Severity |
| Frequent |
| Likely |
| Occasional |
| Seldom |
| Unlikely |
| Date Prepared: |
| Catastrophic |
| E |
| E |
| H |
| H |
| M |
| Project Location: |
| Critical |
| E |
| H |
| H |
| M |
| L |
| PRIME CONTRACTOR SECTION: REV IEW ED BY: SIGNATUR E REQUIRED |
| Marginal |
| H |
| M |
| M |
| L |
| L |
| SSHO Signature: |
| Negligible |
| M |
| L |
| L |
| L |
| L |
| QC Manager Signature: |
| Step 1: Review each Hazard with identified |
"Controls". Determine RAC (see above).
Prime Superintendent Signature:
RAC CHART
| Notes: |
| Probability: Likelihood the activity will cause a Mishap (Near Miss, Incident, or Accident). Identify as Frequent, Likely, Occasional, Seldom or Unlikely |
E = Extremely High Risk
| Identify as Catastrophic, Critical, Marginal, or Negligible |
| H = High Risk |
Step 2: Identify the RAC (probability vs. severity) as E, H, M, or L for each "Hazard" on AHA.
Annotate the overall highest RAC at the top of the AHA
M= Moderate Risk
L = Low Risk
| Job Steps (Work Sequences) |
| Specific Anticipated Hazards |
| Controls |
| RAC |
| Job Steps (Work Sequences) |
| Specific Anticipated Hazards |
| Controls |
| RAC |
| Equipment to be used |
| Training Requirements & Competent or Qualified Personnel Name(s) |
| Inspection Requirements |
UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it f ails to ef f ectively identif y the w ork sequences; specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update w hen procedures, scheduling or hazards change.
UFGS 013526 1.9.2 Each employee perf orming w ork...must review the AHA and sign a signature log f or that AHA prior to starting w ork. The SSHO must maintain a signature log on site f or every AHA
SOW Attachment (7) Bldg. 4 Roof-Top Chiller Replacement Activity Hazard Analysis Form