This document is a Statement of Work (SOW) Attachment for a Request for Quotation (RFQ) under FAR Part 12 & 13 for Energy Management Control System (EMCS) controller upgrades and integration at Ramstein Air Base, Germany.
The key details are: The contractor shall provide building controllers for upgrades to BACnet/IP based controllers and network these buildings into the EMCS headend application. All upgrades shall utilize BACnet/IP and conform to standard commercial practices, in accordance with technical regulations for workplaces, and electrical TUV/VDE requirements. This includes testing of all controllers and the new application. The solicitation number is FA561324Q0030, with a questions due date of 31 July 2024 1600 CEST and quotes due by 9 August 2024 1600 CEST. The contracting agency is the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
RAMSTEIN AIR BASE
TELECOMMUNICATIONS INSTALLATIONS
GUIDE
Version v2.0
Last updated 21.06.2021
Page | 2 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
TABLE OF CONTENTS
GENERAL INFORMATION
PLANNING AND DESIGN
CONSTRUCTION
QUALITY PLAN AND QUALITY ASSURANCE
CLASSIFIED INFRASTRUCTURE
REGULATIONS AND STANDARDS
PRIMARY CABLING
SECONDARY CABLING
BUILDING BACKBONE CABLING
TERTIARY CABLING
TELECOMMUNICATIONS CABLING INFRASTRUCTURE
GENERAL INFORMATION
TELECOMMUNICATIONS SPACES AND CABLING
LOCATION AND ACCESS OF TELECOMMUNICATIONS SPACES
TELECOMMUNICATIONS ENTRANCE FACILITY IN MULTI-STORY BUILDINGS
TELECOMMUNICATIONS ENTRANCE FACILITY IN ONE-STORY BUILDINGS
TELECOMMUNICATIONS ENTRANCE FACILITY IN WAREHOUSES AND STORAGE HALLS
DESIGN REQUIREMENTS FOR COMMUNICATIONS EQUIPMENT ROOMS
TELECOMMUNICATIONS ROOM SIZE AND DIMENSIONS
TELECOMMUNICATIONS ENTRANCE FACILITY SIZE AND DIMENSIONS
COMMUNICATIONS FACILITIES – GROUNDING AND BONDING REQUIREMENTS
TELECOMMUNICATIONS MAIN DISTRIBUTOR
NETWORK CABINETS 19“
TECHNICAL REQUIREMENTS
BALANCED TWISTED PAIR INSTALLATION CABLE
Page | 3 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
PATCH CORDS RJ45 KATEGORIE 6A
MODULAR RJ45 KEYSTONE SPECIFICATION
PATCH PANEL 19” WITH RJ45 MODULAR KEYSTONE JACKS
MAXIMUM CABLE LENGTH
CATEGORY 3 COPPER RISER CABLE
UNSHIELDED PATCH PANELS
STRAIN RELIEF REQUIREMENTS
CAT 3 UTP COPPER CABLE AND TERMINATION BLOCKS
CABLE SHEATH COLORS FOR VARIOUS NETWORK ENCLAVES
WORK AREA OUTLETS DENSITY
DATA/VOICE AND 230V/16A RECEPTACLES FOR SINGLE-WORKPLACE
DATA/VOICE AND 230V/16A RECEPTACLES FOR DOUBLE-WORKPLACE
TECHNICAL REQUIREMENTS
OPTICAL FIBER SPECIFICATIONS
FIBER OPTIC CABLING LINK
FIBER OPTIC CABLE AND CONNECTOR TYPES FOR VARIOUS NETWORK ENCLAVES
FIBER OPTIC VERTICAL BUILDING BACKBONE CABLE
FIBER OPTIC DISTRIBUTION PANELS FOR OS2 VERTICAL CABLE
FIBER TO THE DESKTOP
RJ45 AND FIBER OPTIC DATA/VOICE RECEPTACLES LABELING STANDARD
CABLE TRAY SPECIFICATIONS
HORIZONTAL CABLE TRAYS
CABLE TRAY SPECIFICATIONS
MAXIMUM FILL RATIO
MAXIMUM FILL DEPTH
ACCESS HEAD ROOM
Page | 4 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
SURFACE MOUNT CABLE RACEWAY SYSTEM
OPEN OFFICE WIRING
PLANNING OUTSIDE PLANT CABLING INFRASTRUCTURE
FIBER OPTIC CABLE REQUIREMENTS
FIBER OPTIC DISTRIBUTION PANEL
FIBER OPTIC SPLICE CONDUCTORS
EXTERIOR BACKBONE COPPER CABLES
EXTERIOR COPPER CABLE TERMINATION
SURGE PROTECTOR MODULE
PLYWOOD BACKBOARD
TERMINATION STENCILING
PRE-CASTED MAINTENANCE HOLES
MAIN DISTRIBUTION MAINTENANCE HOLE (MH)
SUB-DISTRIBUTION MAINTENANCE HOLE (HH)
PULLING-BOX
MAINTENANCE HOLES ACCESSORIES
CABLE RACKS AND CABLE RACK SUPPORTS
UNDERGROUND UTILITIES MARKINGS
CLOSURES FOR CABLE SPLICING IN MANHOLES
FIBER OPTIC SPLICE ENCLOSURES
FIBER OPTIC SPLICE CONNECTORS
FIBER OPTIC CABLE MAINTENANCE LOOP
COPPER CABLE SPLICE ENCLOSURE
COMMUNICATIONS CABLE MARKER
MAINTENANCE HOLE AND CONDUIT LABELING
GROUNDING AND BONDING
CABLE RACKS, PULLING IRONS AND PUMP SUMP
DRAINAGE AND STABILITY
DISTANCE BETWEEN MAINTENANCE HOLES
MAINTENANCE HOLE IDENTIFICATION
GROUND ROD AND BONDING RIBBON
Page | 5 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
EXISTING MAINTENANCE HOLES
CONDUIT SPECIFICATION AND STRUCTURE
MAXCELL GEOTEXTILE INNERDUCT
CONDUIT PLACEMENT
REROUTING OF EXISTING DUCTS
DUCT BANK INSTALLATION
DUCT BANK TRENCH PROFILE
CONCRETE ENCASEMENT
PULLING STRINGS / ROPES / TAPES
SEALING PLUGS
DUCT SEALS
DUCT TIE-DOWNS
CONDUIT SPACERS
DUCTS INTEGRITY
STUB-OUTS
CONCRETE ENCASEMENT
SECTION LENGTHS
MINIMUM DUCT BANK SIZING
MAIN CABLE PATHWAYS
LATERAL DUCT RUN
ENTRANCE DUCTS
DUCTS INTO MINOR BUILDINGS
MAXIMUM LENGTH OF OSP CABLES INSIDE A FACILITY
LOCATING TAPE / WIRE
TRACER WIRE
GENERAL INFORMATION
REFERENCE ROUTE KLASSE EA AND NVP VALUE
KLASSE EA TRANSMISSION LINK PERFORMANCE AND TEST REQUIREMENTS
CATEGORY 3 UTP COPPER CABLE TESTING
FIBER OPTIC CABLING TRANSMISSION PERFORMANCE AND TEST REQUIREMENTS
OPTICAL FIBER TEST METHODS AND TEST EQUIPMENT
Page | 6 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
ATTENUATION ALLOWANCE CALCULATION
TIER 1 – OPTICAL FIBER TESTING
TIER 2 – OPTICAL FIBER TESTING
QUALITY PLAN
AS-BUILTS DOCUMENTATION
GLOBAL POSITIONING SYSTEM
CVC OUTSIDE PLANT CABLING INFRASTRUCTURE AND GPS DATA
TEST AND ACCEPTANCE DOCUMENTATION
VARIOUS DATA NETWORK ENCLAVES
SECURE INTERNET PROTOCOL ROUTER NETWORK OPEN STORAGE INSTALLATION
SEPARATION OF AIR FORCE NETWORK AND COMMERCIAL ISP NETWORK
COMMERCIAL ISP DATA/VOICE OUTLETS IN OFFICE WORK AREA
GENERAL INFORMATION
EMERGENCY PHONE IN ELEVATOR CAB
GENERAL INFORMATION
CONTROL SYSTEMS
COMMUNITY OF INTEREST NETWORK ENCLAVE (COINE)
IP-NETWORK AND FIELD POINT OF CONNECTION
BUILDING AUTOMATION
MILCON PROGRAM
MILCON DD FORM 1391 PLANNING PROCESS
PRE-DESIGN MEETING
5% DESIGN REVIEW STAGE (KVM)
35% DESIGN REVIEW STAGE (HU-BAU)
Page | 7 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
65% DESIGN REVIEW STAGE
95% DESIGN REVIEW STAGE (AFU-BAU)
100% DESIGN REVIEW (BACK CHECK MEETING)
MACC ELEMENT ROLE AND RESPONSIBILITIES
PROJECT DESIGN
86CS TECHNICAL REVIEW
PRE-CONSTRUCTION MEETING
WEEKLY CONSTRUCTION MEETING
CONSTRUCTION-SITE VISITS
MILCON COMMUNICATIONS INSPECTION AND ACCEPTANCE
PROJECT EXECUTION
MACC COMMUNICATIONS INSPECTIONS AND ACCEPTANCE
MILCON PROJECT CONTROL FOR DESIGN AND IMPLEMENTATION IN RLP
Page | 8 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Purpose and Scope
General Information
1.1.1 This handbook is a planning tool and provides guidance for 86 Civil Engineering Design Section, the German Construction Agency LBB, and A&E Contractors on technical standards, required for uniformed installation of 86 CS maintained Cyber Telecommunications Infrastructure, supporting Ramstein Air Base diverse mission requirements.
1.1.2 The document is based on the references, standards and guidelines listed in APENDIX A and applies to all MILCON, MACC and SRM project reviews.
1.1.3 The mandatory technical requirements, standards and regulations, parts and materials registers contained within this letter, shall be incorporated into all project designs and contracts for implementation on Ramstein Air Base and KMC wide.
1.1.4 All requirements stated in this installation guide, shall be used unless otherwise specified and approved during design by 86CS/SCXPP MILCON section and maintenance work center 86 CS/SCWO.
1.1.5 All exterior (OSP) and interior (ISP) installations and terminations shall be installed in accordance with the IT-standards listed in APPENDIX A, all applicable industry standards, and manufacturer specifications with the most stringent applying standard.
Planning and Design
1.2.1 Reference: UFC 3-580-01, Par. 2-1
Design of interior and exterior telecommunications infrastructure must meet the needs of the activity and supporting facilities. Architects & Engineers (A&E) contractor generated final drawings and specifications for Design-Bid-Build and Design-Build projects must be stamped by a BICSI Registered Communications Distribution Designer (RCDD).
1.2.2 The German equivalent to the BICSI RCDD is “VdS anerkannter Sachkundiger für Gebäude- Infrastruktur-Verkabelung”. The consulted A&E contractor shall be a certified Communications Distribution Designer IAW VdS regulation 3117, with min. 3 years of experience in planning and installing cyber infrastructure and systems, specifically for the DoD Armed Forces in Europe.
1.2.3 Design and construction may be concurrent efforts in Design-Build projects, and multiple phases of construction may be approved. Therefore, the final documents for each construction phase must be stamped by the RCDD.
1.2.4 Design and install a complete standard based, flexible telecommunications design including telecommunications spaces, pathways, receptacles, connectors, cabling, grounding, bonding, and static protection. This document follows the standards and guidelines listed in APENDIX A.
Construction
1.3.1 The A&E and the construction prime contractor are the contractual partners of LBB and/or 86CES. Consequently, the 86CS shall not be directly contacted for changes and/or decisions which affects the concluded and signed MILCON/MACC contract.
Page | 9 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Quality Plan and Quality Assurance
1.4.1 The 86CES shall develop a communications installation quality plan IAW EN 50174-1 and provide to 86CS for review and approval. Based on the quality plan, 86CS will conduct a quality assurance inspection once the installation has been completed.
Classified Infrastructure
1.5.1 Reference: UFC 3-580-01, Par. 2-2
Classified Infrastructure is any infrastructure that is used to transmit unencrypted classified National Security Information (NSI). Examples would be the infrastructure to support classified networks such as Secret Internet Protocol Router Network (SIPRNET) and Joint Worldwide Intelligence Communications System (JWICS).
1.5.2 Coordinate the design of classified telecommunications infrastructure with the Telecommunications Manager and the Certified Tempest Technical Authority (CTTA) responsible for area where classified systems being installed.
1.5.3 The following documents may be applicable:
♦ AFSSI 7702 - Attachment 12 ♦ CNSSAM TEMPEST/1-13 (FOUO) - Defines the RED/BLACK installation guidance.
Structured Network Cabling
Regulations and Standards
2.1.1 The international standard ISO/IEC 11801, the US-Standard ANSI/TIA 568-C.2, the European standard EN 50173, and the German standard DIN EN 50173, has implemented the requirement for manufacturer, protocol independent and service generic cabling system in 2000.
2.1.2 These standards describe the planning and installation of generic communications cabling systems, independently of the current use of the buildings / rooms to be cabled, network technologies, and defines the specifications for individual components of the entire data transmission link.
Bandwidth
Region 100 MHz 250 MHz 500 MHz 600 MHz 1000 MHz 2000 MHz
USA
ANSI/TIA
568-C 2.1
Category 5e
ANSI/TIA
568-C 2.1
Category 6
ANSI/TIA
568-C 2.1
Category 6A
ANSI/TIA
568-C 2.1
Category 8
International
ISO/IEC1 1801
2nd Edition Class D
ISO/IEC 11801
2nd Edition
Class E
ISO/IEC 11801
2nd Edition
Class EA
ISO/IEC 11801
2nd Edition
Class F
ISO/IEC 11801
2nd Edition
Class FA
ISO/IEC 11801
3rd Edition Class I & II
Europe
CENELEC
EN 50173-1
Class D
CENELEC
EN 50173-1
Class E
CENELEC
EN 50173-1
Class EA
CENELEC
EN 50173-1
Class F
CENELEC
EN 50173-1
Class FA
Germany
DKE
DIN EN 50173-1
Klasse D
DKE
DIN EN 50173-1
Klasse E
DKE
DIN EN 50173-1
Klasse EA
DKE
DIN EN 50173-1
Klasse F
DKE
DIN EN 50173-1
Klasse FA
Table 1 – International/National Structured Network Cabling Standard
Page | 10 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Primary Cabling
2.2.1 The primary cabling is running from the campus distributor (CD) to the single building or multiple buildings of the same location, or it connects buildings amongst each other.
Secondary Cabling
2.3.1 The lines between separated data distributors within a building, the building distributors (BD), are referred to as secondary cabling.
Building Backbone Cabling
2.4.1 On every floor of a building, at least one floor distributor (FD) should be installed. For in such a case vertical floors are connected, the terminology building backbone cabling is used.
Tertiary Cabling
2.5.1 Attached to that, we find the tertiary cabling. It describes the data cables leading to the data/voice outlets (DO) or to consolidation points anterior to it. This is referred to as horizontal cabling.
Telecommunications Cabling Infrastructure
2.6.1 Reference: ISO/IEC 11801
Fig. 1 below shows a generic cabling system IAW ISO/IEC 11801 with functional elements.
Figure 1 – Telecommunications Structured Cabling
Legend: CD = Campus Distributer. BD = Building Distributer. FD = Floor Distributer.
CaD = Cable Distributer. DO = Data Outlet. ITE = Information Technology Equipment
Page | 11 Ramstein Air Base MILCON – MACC
Telecommunications Spaces
3.1.1 In reference to UFC 3-580-01 and TIA-569-C.2, there are four types of telecommunications spaces that house substantial information technology equipment (ITE), terminate, cross-connect and distribute structured network cabling:
♦ Telecommunications Entrance Facility (EF or TEF) ♦ Telecommunications Room (TR) ♦ Equipment Room (ER) ♦ Telecommunications Enclosure (TE)
Telecommunications Spaces and Cabling
3.2.1 Install campus and building cable distribution systems as shown in Fig. 2 below.
Figure 2 – Telecommunications Spaces and Cabling
Legend: ITB = Information Transfer Building. EB = End Building. EF = Entrance Facility.
MCC = Main Cross Connect. ER = Equipment Room. TR = Telecommunications Room. WA = Work Area.
CD = Campus Distributer. BD = Building Distributer. FD = Floor Distributer. DO = Data Outlet.
ASCC = American Specs Color Code. ITE = Information Technology Equipment
Page | 12 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Location and Access of Telecommunications Spaces
3.3.1 Plan and locate telecommunication spaces IAW UFC 3-580-01, Par. 2-4.2 and Ramstein Air Base Telecommunications Installation Guide, Sec. 3.4 through 3.9.
Telecommunications Entrance Facility in Multi-Story Buildings
3.4.1 The building service entrance provides an entry point for outside plant cable(s) into the building. This is normally located in the equipment room. Fig. 3 below shows a typically telecommunications entrance facility serving a multi-story building with minimum one telecommunications room positioned on each floor. Outside plant cable shall not extend beyond 15 m within the building.
Figure 3 – Example: EF, BD, and FD for Multi-Story Buildings
Page | 13 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Telecommunications Entrance Facility in One-Story Buildings
3.5.1 There is no requirement for a separate telecommunications room for smaller buildings e.g., warehouses, storage halls, and other non-administrative facilities with ≤ 24 served data outlets. The plywood backboard and the wall-mounted 19”, 21 RUs cabinet, shall be installed on the wall where fiber and copper cables come into the building.
Figure 4 – Example Entrance Facility up to max. 24 Data/Voice Outlets Diagram
Page | 14 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Telecommunications Entrance Facility in Warehouses and Storage Halls
3.6.1 For one-story warehouses or storage halls where Balanced-Twisted-Pair-Cables (BTPCs) exceed the length of 90 m, additional 19” network cabinets must be installed to serve the data/voice connection outlets. Install 12-strand OS2 indoor Fiber Optic Cable (FOC), spliced and terminated on 6-port FO SC-D(Duplex)/UPC patch panels from the cabinet in the EF to the cabinet at the far end of the building.
Figure 5 – Example: EF, FD Warehouse and Storage Facilities
Page | 15 Ramstein Air Base MILCON – MACC
Design Requirements for Communications Equipment Rooms
3.7.1 The following design requirements must be considered for all telecommunications rooms:
♦ Grounding: All communications shall be grounded according to DIN EN 50310, DIN VDE 0100-54, Par. 4.1.1 and Fig. 8 of this guidebook.
♦ Location: Telecommunications Rooms should be located away from sources of Electromagnetic Interference (EMI). Large electrical distribution panels and transformers shall not be allowed in telecommunications rooms or anything else not related to telecommunications requirements.
♦ Perimeter: No false ceiling. All surfaces treated to reduce dust. Walls and ceilings painted white or light in color to improve visibility.
♦ Limited Access: Single or double 90 x 203 cm lockable doors with electronic access control system. Access control cards must be provided to 86CS assuring 24/7 unlimited access.
♦ HVAC: 24 hours/day, 365 days/year, 18°-24° Celsius, 30%-55% humidity, and positive pressure with a minimum air change rate of once per hour.
♦ Lighting: LED Lighting System in conjunction with PoE power source, 2,60 m high, providing 550 Lux at 1,00 m above floor. If back-up lighting is being provided in the facility, it should also be provided in the telecommunications room.
♦ Electrical: A minimum of Two (2) dedicated FI LSS 230V/16A/30mA (RCD) protected circuits shall be installed to support telecommunications equipment. One (1) dedicated FI LSS 110V/20A/30mA (RCD) protected power circuit will be installed where 110V power is available. Convenience triple outlets shall be placed at 2,00 m intervals around the perimeter.
Emergency power outlets and emergency lighting are a mandatory requirement in TRs. If the IT-equipment must always remain operational due to mission requirements, then a permanently installed standby power generator shall be provided, to prevent the loss of power to the equipment.
♦ Dust: Less than 100 μg/m3 at 24-hour period.
♦ Firestops: Packings utilized to re-establish the integrity of fire-rated structures when cables have penetrated these barriers shall meet the specifications in accordance with currently applicable and/or German Fire Protection Standards. All penetrations created/utilized by the communications cabling installation/upgrade shall be fire-stopped to original fire rating.
♦ Fire-protection: In accordance with currently applicable and/or German Fire Protection
Standards. The preference for protecting areas which house electronic equipment is to utilize dry fire protection systems.
♦ Equipment Rack Clearance: Maintain front and rear clearance of min. 100 cm, and side clearance of min. 80 cm.
♦ Other: No piping, ductwork, mechanical equipment, or power cabling should be allowed to pass through the telecommunications rooms. No unrelated storage is allowed.
Page | 16 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Telecommunications Room Size and Dimensions
3.8.1 There shall be at least one TR / ER per floor. Multiple rooms are required, if the cable length between floor distributor and the data/voice outlet location, including slack, exceeds 90 m. If usable floor space to be served exceeds 929 m2, additional telecommunications rooms shall be considered.
Figure 6 – Telecommunications Room Size and Dimension
3.8.2 For TRs that serve areas with an office density of less than one work area per 9,3 m2 of usable floor space, a telecommunications room may serve larger areas, given the horizontal cable length (90 m) requirements are met.
3.8.3 Plan telecommunications rooms per served floor space as shown in Tab. 2 below:
Served Floor Space m2
TR Size % Work Areas TR Size m2 TRs/Floor
≤ 502 1,1 6 6 1
503 - 929 1,1 100 11 2
930 - 5000 1,1 538 13 6
Table 2 – Telecommunications Served Floor Space
Page | 17 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Telecommunications Entrance Facility Size and Dimensions
3.9.1 The general requirements for EF and ER are identified in the UFC 3-580-1 for structural, lighting, room size, electrical, environment, and fire protection, shall be followed and modified as necessary to include the local requirements and building construction codes. Physical security measures (e.g., solid walls, solid doors, electronic access control system, etc.) are required to secure equipment rooms.
3.9.2 Fig. 7 below depicts a typically telecommunications entrance facility, functioning in addition as equipment room, building distributor and floor distributor.
Figure 7 – Typically Telecommunications Entrance Facility
3.9.3 Plan size and dimensions of a telecommunications entrance facility/equipment room based on served data/voice receptacles (see Tab. 3 below).
Served Data Outlets min. Room Size m2
Room Dimensions m
≤ 200 10,8 3,60 x 3,00
201 - 300 11,7 3,90 x 3,00
301 - 800 24,9 7,10 x 3,50
Table 3 –Telecommunications Room based on served Data/Voice Outlets
Page | 18 Ramstein Air Base MILCON – MACC
Grounding, Bonding and Shielding
Communications Facilities – Grounding and Bonding Requirements
4.1.1 Grounding, bonding, and shielding of all site facilities and structures, inside and outside, is of paramount importance for personnel safety and equipment protection. Proper communications grounding bars shall be installed in all communications facilities and in each network cabinet, using yellow-green-striped 25 mm2/16 mm2/ 6 mm2/4 mm2 (see Fig. 8) grounding wire, to connect all metallic parts of the communication system with each other. Grounding shall satisfy requirements as set forth by EN 50310 and DIN VDE 0100-540 standards and guidelines for communications facilities.
Figure 8 – Grounding Requirements IAW DIN EN 50310 and DIN VDE 0100-54
4.1.2 For new and renovated facilities, the telecommunications grounding system must be designed and installed IAW EN 50310 as a Meshed Bonding Network (MESH-BN) and must connect to the Common Bonding Network (CBN) of the building.
Page | 19 Ramstein Air Base MILCON – MACC
Telecommunications Distribution
Telecommunications Main Distributor
5.1.1 The telecommunications main distributer connects the external telecommunications cabling network to the interior data, voice, and/or other telecommunications networks. Copper and fiber optic patch cords are connecting both networks in the interior of the main distributer.
Network Cabinets 19“
5.2.1 Installed network cabinets shall satisfy the following technical requirements:
♦ Height: 42 RU. With: 19”. Front and back depth adjustable ♦ Dimensions: (H)H= 2100 mm x (B)W= 800 mm x (T)D= 1000 mm ♦ Cabinet depth min. T= 1000 mm: New state-of-the-art active IT-equipment e.g., PoE++ network switches (up to 100 W) or UPSs will require extensive space in network cabinets.
Installing T= 1200 mm cabinets is recommended.
♦ Front door: Glass, opening angle 180°. Rear door: Vertically divided, opening angle 180°.
♦ Door Looks: Door 3-point locking and swivel lever handle for profile half cylinder.
♦ Sidewalls: Made of sheet steel, 2-divided removable and lockable.
♦ Top roof: Fan sheet mountable. Two lateral brush strips for cable entry.
♦ Bottom: Sheet steel plate. Cable entries via brush strips. Pre-assembled plinth 100 mm.
♦ Grounding: 2 each copper potential equalization bars. Grounding wires 4 mm2 and 6 mm2
(see Par. 4.1.1 Fig. 8, Grounding Requirements).
♦ Color: RAL 7035 light grey. Powder coted. Protection IP 20.
♦ Cable Management Brackets: At both sides of the cabinet. Bracket depth min. 125 mm.
♦ Patch Cord Management Panel: Bracket depth min. 105 mm.
♦ Power Requirements: 2 each 220/16A permanently mounted, permanently connected, “NOT Switchable” power strips. 6 receptacles per power strip. Two (2) dedicated power circuits 16A. Surge protection Type 3. Protected by FI LSS 220V/16A/30mA. Shall be labeled “Protected by RCD”. Due to new PoE++ standard IEEE802.3bt (70 W - 100 W), energy requirements shall be calculated prior to installation.
Symmetric Copper Cabling
Technical Requirements
6.1.1 Plan and install Symmetric Copper Cabling Systems according to the following standards:
♦ EN 50173
♦ EN 50174-1, EN 50174-2, EN 50174-3
♦ EN 50310
♦ ANSI/TIA 568
6.1.2 Plan and install Category 3, Unshielded Twisted Pair (UTP), American Specs Color Code (ASCC), Symmetric Copper Riser Cable as described in Sec. 6.7 through 6.10 in this guidebook.
Page | 20 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
6.1.3 Balanced-Twisted-Pair-Cable (BTPC) shall always be installed in uncut length and with the bending radius specified in the manufacturer’s data sheet.
6.1.4 Install individual components of Klasse EA transmission link IAW the following standards:
♦ EN 50288-10-1 and EN 50288-10-2 - Balanced-Twisted-Pair cable ♦ EN 60603-7-51 - Connectors and Connector Systems
6.1.5 GG45 or TERA are NOT standard connector systems for passive/active network infrastructure on RAB/KMC. If unusual site conditions e.g., harsh environments require other than RJ45 connector systems, prior approval must be obtained from 86 CS/SCXPP MILCON section.
Balanced Twisted Pair Installation Cable
6.2.1 Balanced twisted pair installation cable shall fulfill the following specifications:
♦ Kategorie 6A or higher ♦ Shielded/Foiled-Twisted-Pair (S/FTP)
• Braided Shield
• Pair in Metal Foil (PiMF)
♦ 4x 2x min. AWG 22 or higher AWG
Figure 9 – S/FTP Cable Structure
6.2.2 Schielded balanced twisted pair cable shall be specified for the minimum attenuation:
♦ Coupling Attenuation: ≥ 80 dB ♦ Return Loss: ≥ 20 dB at the highest frequency specified for this cable
6.2.3 Selected shielded balanced twisted pair cable shall satisfy the typical values of transmission performance measures as shown in Tab. 4 below:
Frequency (MHz)
Attenuation (dB/100m)
NEXT
(dB)
ACR
(dB/100m)
ELFEX
(dB/Loss)
Return Loss (dB)
300 30,9 93 62 67 27
500 39,9 87 47 62 24
600 44,6 85 40 60 23
900 56,4 81 25 53 21
1000 59,6 80 20 50 20
Table 4 – Example: Minimum Transmission Performance
Page | 21 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Patch Cords RJ45 Kategorie 6A
6.3.1 The shielded Patch Cords shall be min. Kategorie 6A and shall satisfy min. the following technical requirements:
♦ GHMT Certified ♦ Detent Lever Protection ♦ Design: S/FTP ♦ Sheath: LSZH ♦ Wire Assignment of RJ45-Plugs 1:1 IAW TIA T568B ♦ Suitable for 10 GBit/s
6.3.2 The installer shall provide min. 50% patch cords of the data connections in color green or match to the sheath color of the installed data network category. Patch and connection cables must match to the installed type of copper cable and shall be accordingly of the same design type. The cable length of the patch cords must be coordinated with the operator prior to procurement. The total length of both patch cords in the channel link shall not exceed 10 m.
Modular RJ45 Keystone Specification
6.4.1 RJ45 modular keystones shall be Kategorie 6A and must satisfy the following technical requirements:
♦ GHMT certified ♦ Registered Jack 45 (RJ45) modular keystone ♦ Connector shall support Power over Ethernet according to:
• PoE IEEE 802.3 af
• PoE+ IEEE 802.3 at
• PoE++ IEEE 802.3 bt (4-pair PoE)
♦ Color coding according to TIA T568A and T568B ♦ Rewiring shall be possible e.g., after wiring error ♦ Separate strain relief and 360° shield coverage ♦ Gold-plated RJ45 contact area ♦ Suitable for receiving conductors AWG 26/1-22/1 ♦ Cable attached to the module 180° as standard ♦ Strain relief with pre-mounted cable tie
Figure 10 – RJ45 Keystone and Termination
Page | 22 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Patch Panel 19” with RJ45 Modular Keystone Jacks
6.5.1 Patch panels shall utilize RJ45 modular keystones to support TIA T568A and T568B wiring configuration. 19” rack-mount modular panels shall possess the following characteristics:
♦ Height : 1 Rack Unit ♦ Capacity modules: max. 24 ♦ Printed with numbers 1 through 24 ♦ Color RAL 7035 (light grey) ♦ Grounding cable and cable ties ♦ Integrated cable management for cable routing and strain relief
6.5.2 All patch panels shall be grounded to the cabinet grounding bar (see Par. 4.1.1 Fig. 8).
Figure 11 – RJ45 Keystone Patch Panel
Maximum Cable Length
6.6.1 Reference: EN 50173-1, Table 45
Copper data cable length (Klasse EA data transmission link) is limited to 90 m from patch panel termination in the telecommunications room to the data outlet termination.
6.6.2 To calculate the exact cable length for a cabling link, the following equitation shall be applied:
B = 105 - 3 - F × X
Legend: B = max. Length of cable (m). F = total length of all patch cords (m). X = Ratio of the insertion loss of flexible cables to the insertion loss of permanently installed primary or secondary cables. (dBm).
♦ Consider 3 (m) reserve to mitigate insertion loss fluctuations ♦ Equation applies at ambient temperature of 20° Celsius ♦ If the transmission link lengths are longer than 100 m, network applications with restrictions on runtime may not be supported
Page | 23 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Category 3 Copper Riser Cable
6.7.1 Install 25-pair CAT 3, Unshielded-Twisted-Pair (UTP), Plenum Rated, American Specs Color Code (see APPENDIX H, Tab. 15), copper riser cable from the backboard to 25-port CAT 3 UTP patch panel in the network cabinet and terminate on 110-type connection blocks at the backboard.
Unshielded Patch Panels
6.8.1 25-port, RJ45 CAT 3 patch panels with rear mounted 110-type terminations, category rated for the Unshielded-Twisted-Pair (UTP) system shall be installed and arranged in rows or columns depending on number of floors and/or cross connects in 19” network cabinets. Install UTP patch panels in the same network cabinet or in the cabinet immediately adjacent to the IT- equipment to minimize patch cord lengths. Provide a minimum spare capacity of 25%.
Strain Relief Requirements
6.9.1 All strain relief bars shall consist of a metal bar that mounts in the rear of a standard 19” network cabinet, to support a minimum of one 25-pair copper (ASCC) cable exiting from the back of a patch panel with a 50 mm to 125 mm inward mounted offset. Cable shall be secured with integrated adjustable clip, hook and loop strips or cable ties. Optional quick release brackets shall provide an easy way to remove the strain relief bar without the use of tools.
CAT 3 UTP Copper Cable and Termination Blocks
6.10.1 Indoor copper cable, Mohawk 25-pair AWG 24 CAT 3 Plenum, running from the backboard to the 25-port CAT 3 UTP patch panel in the network cabinet shall terminate on 110-type connection block as shown in Fig. 12 below.
6.10.2 Siemon S110 Field Termination Blocks shall be mounted at the right side next to the Building Entrance Terminal (BET). Mount PVC wire management hooks to the left and the right side of each block for neatly wiring of the cross-connect jumpers. Install 25-pair CAT 3 cable from the backboard of the EF to each telecommunications room in the building and terminate on 110-type wiring blocks at the backboard.
Figure 12 – 25-pair CAT 3 UTP Cable and S110 Wiring Block
Page | 24 Ramstein Air Base MILCON – MACC
Cable Sheath Colors
Cable Sheath Colors for various Network Enclaves
7.1.1 Reference: CNSSAM TEMPEST 1-13 (for colors green, blue, red, orange, and yellow).
Cable sheath colors and fiber optic connector types are reserved for the different enclaves and classification levels as shown in Tab. 5 below:
Network Enclave Color Copper Cable / Connector Type
NIPRNET/VoIP GREEN Klasse EA / RJ45
Analog/ISDN e.g., DSN Elevator GREEN Klasse EA / RJ45
CONFIDENTIAL BLUE Klasse EA / RJ45
SIPRNET/VoSIP RED Klasse EA / RJ45
TOP SECRET ORANGE Klasse EA / RJ45
JWICS YELLOW Klasse EA / RJ45
BCE COINE 2.0 VILOLET Klasse EA / RJ45
OTHER
e.g., Commercial ISP GREY Klasse EA / RJ45
Table 5 – Cable Sheath Colors for various Network Enclaves
Page | 25 Ramstein Air Base MILCON – MACC
Work Areas
Work Area Outlets Density
8.1.1 One dual jack for every 2,00 linear meters of wall space in a room or if space prohibits, at least one dual jack per wall in a room within office type space or one (1) dual jack per 7,50 m2 office space.
Figure 13 – Data Outlets in Office Work Area
Facility Space Category Outlet Configuration Planning Area
Outlet per m2
Administrative/Office Space, Conference Rooms, Classrooms, Hospitals, Clinics and Special Users
2 x RJ45 modular connectors
OR
1 x RJ45 modular connector
AND
1 x SC Duplex fiber optic UPC connector
OR
2 x SC Duplex fiber optic UPC connectors
1 x 2-Port outlet per 7,5m2 on different walls for offices
System Furniture
2 x RJ45 modular connectors
OR
1 x RJ45 modular connector AND 1 x SC Duplex fiber optic connector
OR
2 x SC Duplex fiber optic UPC connectors
1 x 2-Port outlet per workspace area
Table 6 – Work Area Outlet Density
Page | 26 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Data/Voice and 230V/16A Receptacles for Single-Workplace
8.2.1 Provide one 2-port RJ45 keystones data/voice receptacles, three designated (IT) 230V/16A, and two separate (general) 230V/16A receptacles for a single work area as shown in Fig. 14 below.
8.2.2 The faceplates of the data/voice and the 230V/16A receptacles, designated for the communications equipment, shall match the same color (green for NIPRNET). Maintain a separation between the RJ45 data/voice and the 230V/16A receptacles of min. 5 cm.
Figure 14 – Single Work Area Office
Page | 27 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Data/Voice and 230V/16A Receptacles for Double-Workplace
8.3.1 Provide one RJ45 keystones 2-port data/voice receptacle and three designated 230V/16A receptacles for each of the workplaces as shown in Fig. 15 below.
8.3.2 Install three additional 230V/16A receptacles (general) for both workplaces. The faceplates of the data/voice and the 230V/16A receptacles designated for the communications equipment shall match the same color (green for NIPRNET).
8.3.3 Maintain a separation between the data/voice and the 230V/16A receptacles of min. 5 cm.
Figure 15 – Dual Work Area Office
Page | 28 Ramstein Air Base MILCON – MACC
Fiber Optic Cable Specifications
Technical Requirements
9.1.1 Only use fiber optic cables (FOC) with the following characteristics:
♦ Step-Index Singlemode Optical Fibers 9/125 µm (OS2) ♦ Graded-Index Multimode Optical Fibers 50/125 µm (OM5)
Optical Fiber Specifications
9.2.1 Fiber: 9/125 µm according to ITU-T G 652, G.652.D attributes (OS2)
♦ Attenuation at 1310 nm: < 0.40 dB/km ♦ Attenuation at 1550 nm: < 0.30 dB/km
9.2.2 Fiber: 50/125 µm (OM5)
♦ Attenuation at 850 nm: < 3.00 dB/km ♦ Attenuation at 1300 nm: < 1.00 dB/km
9.2.3 Couplings / Connectors and Splices
♦ Coupling / Connectors – Attenuation: < 0.50 dB ♦ Splice – Attenuation: < 0.10 dB
Fiber Optic Cabling Link
9.3.1 Depending on the project requirements, the suitable fiber optic cable link (OS2 and/or OM5) including the subsequent transmission performance and test requirements, shall be planned by the A&E, coordinated with 86 CES and 86CS, and documented in the quality plan.
9.3.2 For maximum supported data transmission over singlemode and/or multimode optical fibers at their respective wavelength and attenuation, refer to EN50173-1 and DIN VDE 0800-173-100.
9.3.3 Complete an Attenuation Allowance Calculation prior to transmission performance testing.
Page | 29 Ramstein Air Base MILCON – MACC
Fiber Optic Cable and Connector Types
Fiber Optic Cable and Connector Types for various Network Enclaves
10.1.1 Reference: CNSSAM TEMPEST 1-13 (for colors green, blue, red, orange, and yellow).
Fiber optic connector types are reserved for the different enclaves and classification levels as shown in Tab. 7 below:
Network Enclave Color Optical Fiber Cable / Connector Type
NIPRNET/VoIP GREEN OM5 / SC
CONFIDENTIAL BLUE OM5 / TBD by CTTA
SIPRNET/VoSIP RED OM5 / ST
TOP SECRET ORANGE OM5 / TBD by CTTA
JWICS YELLOW OM5 / LC
BCE COINE 2.0 VILOLET N/A
OTHER
e.g., Commercial ISP GREY N/A
Table 7 – Fiber Optic Connector Types in different Network Enclaves
Page | 30 Ramstein Air Base MILCON – MACC
Interior Fiber Optic Cables and Components
Fiber Optic vertical Building Backbone Cable
11.1.1 Fiber optic cable running to additional telecommunications rooms shall be plenum rated, 9/125 µm (OS2) loose tube indoor cable, with a minimum of 12-strands A/I-DQ(ZN)BH terminated using SC-D/UPC type connectors. Install min. 100 cm slack loop of fiber cable within each panel and include strain relief for cables within the panel. Provide proper termination, splice storage, routing, radius limiting, cable fastening, storage, and cross-connection in all patch panels.
Figure 16 – Fiber Optic ISP vertical Backbone Cable
Fiber Optic Distribution Panels for OS2 vertical Cable
11.2.1 Install fiber optic patch panels in the same rack or in the rack immediately adjacent to the network equipment to minimize patch cord lengths. Splice and terminate IAW US-Color Code as shown in APPENDIX G, Tab. 14. Provide a minimum spare capacity of 25%.
Figure 17 – Fiber Optic 19” Patch Panel 6x SC-D/UPC
Page | 31 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Fiber to the Desktop
11.3.1 Fiber optic cable terminating to fiber optic data/voice outlets shall be 50/125 µm (OM5) mini breakout indoor cable with a minimum of four strands using SC-D/UPC type connectors.
11.3.2 Install min. 100 cm slack loop of fiber within each panel and include strain relief for cables within the panel.
11.3.3 Provide proper termination, splice storage, routing, radius limiting, cable fastening, storage, and cross-connection in all patch panels. Fiber optic patch panels shall use SC-D/UPC type terminations.
Figure 18 – Fiber to the Desk Components
Receptacle Labeling Standard
RJ45 and Fiber Optic Data/Voice Receptacles Labeling Standard
12.1.1 Work area RJ45 and fiber optic data/voice outlets shall be labeled as shown in Fig. 19 below.
Figure 19 – Example: Data/Voice Outlet Labeling
RJ45 Outlet 123 = Comm Room. A = Network Cabinet. 2 = Patch Panel Number. 23 = Patch Panel Port Number
Fiber Optic Outlet 119 = Comm Room. B = Network Cabinet. 1 = Patch Panel Number. 1 = Patch Panel Port Number
Page | 32 Ramstein Air Base MILCON – MACC
Cable Distribution Pathways
Cable Tray Specifications
13.1.1 Utilize solid bottom, slotted bottom, or welded wire cable tray to provide a centralized cable management/distribution system. All pathways shall utilize ladder type or welded wire cable tray in the telecommunication spaces to provide distribution between the plywood backboard, equipment racks, backbone conduits, and the distribution cable tray.
13.1.2 Bond all metallic cable tray sections together and connect the cable tray system to the telecommunications grounding busbar or the telecommunications main grounding busbar in the entrance facility (see Par. 4.1.1 Fig. 8).
Horizontal Cable Trays
13.2.1 Use the cable tray for horizontal distribution to the maximum extent possible (80% to 90% of the horizontal cable length).
Cable Tray Specifications
13.3.1 Design cable trays to accommodate an initial calculated fill ratio of 25%. This allows for future growth within the cable tray. Due to random placement of cables and space between the cables, a 25% fill ratio means, that the tray is half filled.
Maximum Fill Ratio
13.4.1 The maximum fill ratio of any cable tray is 50%.
Maximum Fill Depth
13.5.1 The maximum fill depth of any cable tray is 150 mm. Do not use ladder cable trays for horizontal distribution due to possible cable deformation with large cable quantities.
Access Head Room
13.6.1 Maintain a minimum of 30 cm access headroom above a cable tray system or cable runway.
Surface Mount Cable Raceway System
13.7.1 Tamper resistant two-piece latching surface raceway securely mounted and compatible with concealed mounted data/voice and 230V/16A receptacles.
Open Office Wiring
13.8.1 Open office wiring refers to work area spaces that are divided by modular furniture and partitions rather than by fixed walls.
13.8.2 The electrical designer, the architect, and the interior designer must coordinate the layout of all furniture with electrical and telecommunications outlets during the design process.
Page | 33 Ramstein Air Base MILCON – MACC
Outside Plant Cable and Cabling Systems
Planning Outside Plant Cabling Infrastructure
14.1.1 The Kaiserslautern Military Community (KMC) telecommunications cabling infrastructure includes all cable connections between Information Transfer Buildings (ITBs) and End Buildings (EBs) within a military campus, as well as cables which connect military installations among each others.
14.1.2 The FOC shall be all dielectric, loose buffer tube, water blocked, single mode, OSP cable, suitable for underground applications. The installer shall coordinate each cable installation with the 86 CS/SCXP MILCON section to minimize the impact on building users. The intent is to install the cable in one continuous length, to the extent that it is practical.
14.1.3 If an underground splice is necessary, it shall be accomplished IAW commonly accepted telecommunications industry practices for fusion splicing optical fiber cable and sealed with a splice case suitable for the application.
14.1.4 If a splice case is installed in a maintenance hole/handhole, it shall be pressure tested IAW the manufacturer’s instructions. If a splice case leaks, it shall be reinstalled and retested. A coil of 15 m of cable shall be provided on each cable entering or leaving a splice case in a maintenance hole or handhole. However, FO underground splices shall be coordinated and must be approved by 86 CS.
Fiber Optic Cable Requirements
14.2.1 All cables in halogen-free, self-extinguishing design, longitudinal and transverse water tightness with high cross-pressure resistance.
14.2.2 OSP cables installed building to building shall be all A-DQ(ZN)(SR)2Y dielectric, loose tube design with either water block tape or gel filled and corrugated steel sheath (see Fig. 20).
14.2.3 A minimum 24-Strand fiber OS2 E9/125 µm shall be installed to support core service for all fiber optic installations. No more than 15 m of FOC shall enter the building before termination and a 10 m maintenance loop shall be secured in the cabinet.
14.2.4 FOC shall be installed from point-to-point to maximum extent possible. Avoid all unnecessary splicing to prevent excess attenuation and reflection.
Figure 20 – Fiber Optic OS2 Cable
Page | 34 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Fiber Optic Distribution Panel
14.3.1 A Fiber Optic Distribution Panel for OSP FOC termination shall be populated for maximum density utilizing SC-Duplex/UPC type connectors. All new FODPs installed in an ITB, or Main Access Node shall be capable of 288-strands termination panels regardless of cable size being installed.
14.3.2 Fiber optic cables shall be terminated on new fiber optic distribution panels using fusion spliced pigtails with SC-D/UPC connectors.
Figure 21 – Fiber Optic 19” Patch Panel 12x SC-D/UPC
Fiber Optic Splice Conductors
14.4.1 The Fusion Splice Technique shall be used for all splicing and terminations of fiber optic cables. Apply the fusion splice method to directly splice the optical fiber to SC-D/UPC type connectors.
Fusion splice to pigtails is also acceptable.
Exterior Backbone Copper Cables
14.5.1 All OSP copper cables shall be Polyethylene-89 Superior Essex CASPIC-FSF RDUP PE-89 outside plant telephone cable with a corrugated steel sheath, an expanded polyethylene foam skin, and an external layer of solid, high-density polyethylene.
14.5.2 A minimum of 25-pair shall be installed to connect DoD/Air Force buildings to the RAB/KMC copper cable backbone. No more than 15 m of copper cable shall enter the building before termination. Copper cable shall be tagged with a red plastic tag (see Par. 15.13.1 Fig. 30) with cable number and pair count within 30 cm of the Building Entrance Terminal (BET).
Figure 22 – PE-89 OSP Telephone Cable
Page | 35 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Exterior Copper Cable Termination
14.6.1 All OSP copper cable shall be terminated on a protected Building Entrance Terminal (BET) Circa 1880ECA1-25 with standard 110/110 - type connection technology.
Surge Protector Module
14.7.1 Install 5-pin Circa Gas Tube 350v Surge Protector Modules for each single copper pair incl. all protective accessories.
Figure 23- Circa BET and 5-Pin Surge Protection Module
Page | 36 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Plywood Backboard
14.8.1 Backboard shall be provided on one wall in the Telecommunications Entrance Facility. Provide void-free, interior grade A-C plywood min. L= 1500 mm x H= 2000 mm x D= 25 mm. Plywood backboards must be fire rated by manufacturing process.
14.8.2 Paint applied over fire retardant backboard shall be UL 723 fire retardant paint. Provide label including paint manufacturer, date painted, UL listing and name of installer. When painted, paint label and fire stamp shall be clearly visible.
Figure 24 – Plywood Backboard Configuration
Termination Stenciling
14.9.1 Outside plant copper cable sign size shall be 120 mm x 100 mm and letter size shall be 12 mm.
In-house cross connecting copper cable sign size shall be 60 mm x 25 mm and letter size 8 mm.
Page | 37 Ramstein Air Base MILCON – MACC
Maintenance Holes
Pre-Casted Maintenance Holes
15.1.1 Maintenance Holes (MHs) shall be pre-cast reinforced concrete, multi-directional type with cast-in single or multiple plastic terminators to accept the conduits. Thin concrete knockout sections may be provided for terminating multiple-bore conduits. New MHs shall be placed to support the locations of junction points, offsets, load points, and curvature in the duct line.
Main Distribution Maintenance Hole (MH)
15.2.1 The main distribution manhole system shall be manufactured with pre-cast reinforced concrete and the size shall be the following: L = 3,00 m , B = 1,75 m, H = 2,10 m, and shall have a load rating of HS-20 for heavy vehicular traffic.
Figure 25 – Main Distribution Manhole
Page | 38 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Sub-Distribution Maintenance Hole (HH)
15.3.1 The sub-distribution manhole system shall be manufactured with pre-cast reinforced concrete and the size shall be the following: L = 1,75 m, B = 1,25 m, H = 1,70 m, and shall have a load rating of HS-20 for heavy vehicular traffic.
Figure 26 – Sub-Distribution Manhole
Page | 39 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Pulling-Box
15.4.1 The pulling-box shall be manufactured with pre-cast reinforced concrete and the size shall be the following: L = 1,00 m, B = 1,25 m, H = 1,25 m, and shall have a load rating of HS-20 for heavy vehicular traffic. A pulling-box shall only be installed for directional route changes of 90° (degrees) and shall not be utilized to install fiber optic cable or copper cable splice enclosures.
Figure 27 – Pulling Box
Maintenance Holes Accessories
15.5.1 Accessories shall be designed and provided to support the weight of the cable(s) and splice case(s). Maintenance Holes shall be equipped with:
♦ Torsion assisted round cast iron plate cover ♦ Self-latching stainless-steel slam lock ♦ Water resistant stenciling 50 mm raised letters stating “COMMUNICATIONS” ♦ Cable racks ♦ Pump sump ♦ Grounding/bonding system ♦ Shall be furnished with a ladder ♦ Pulling iron
Page | 40 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Cable Racks and Cable Rack Supports
15.6.1 Cable racks shall be installed in maintenance holes as required. Splices shall not be supported by the cables that enter each end of the splice case. The splices shall be supported by cable hooks under the splice case. Telecommunications industry standard cable hooks of the appropriate length shall be provided to support cables and splice cases. The cable hooks shall be secured using cable rack locking clips. All cables shall be supported using racking clips, cable racks, and cable hooks.
Underground Utilities Markings
15.7.1 The installer shall coordinate with 86CS to ensure markings are placed over existing base infrastructure prior to digging or horizontal directional boring and shall take precautions to protect existing infrastructure. The installer is responsible for repair of any damage caused during installation when the infrastructure is clearly marked. The installer is responsible for maintaining all markings.
Closures for Cable Splicing in Manholes
15.8.1 Intermediate cable splices shall be minimized and consist of fusion splices in a high quality re-enterable splice case. Only splice closures intended for underground applications shall be used in the underground system.
15.8.2 A dry type encapsulant shall be used to seal fiber splice cases. The closures shall have adequate strength to protect the splice and maintain cable shield electrical continuity in the below ground environment. The 86CS quality inspector shall have the opportunity to inspect the inside of the splice case before closure pressure testing and encapsulation is performed.
Fiber Optic Splice Enclosures
15.9.1 Fiber optic underground splices shall be encased in a splice enclosure as shown in Fig. 28.
♦ Preformed Line Products (PLP) Coyote Closure (OPGW & ADSS)
Figure 28 – Fiber Optic Splice Enclosure
Page | 41 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Fiber Optic Splice Connectors
15.10.1 All fiber optic cable splicing shall be performed with the Fusions Splice Technique.
Fiber Optic Cable Maintenance Loop
15.11.1 The installer shall fix a minimum of a 15 m fiber optic cable maintenance loop at the first MH from the building, at each splice point MH location and in every third MH in the run. The maintenance loop slack shall be properly labeled and secure supported.
Copper Cable Splice Enclosure
15.12.1 An underground splice closure shall be a strong, lightweight, stainless steel, fire-retardant covering that protects non-pressurized splices. The closure shields the splice against humidity and moisture and must resist penetration of water. The closure must be properly supported, grounded, and tested for air leaks according to manufacturer’s recommendations. Affix labels to all cables entering the splice, indicating cable number and pair counts.
15.12.2 For new installs, extensions and/or repairs on Ramstein Air Base underground communications copper cable plant, only utilize the following products:
♦ Preformed Line Products ARMADILLO Stainless Splice Case ♦ 3M MS2 or 3M 710 Modular Splice Connectors and Splicing System
Figure 29 – PLP ARMADILLO Splice Enclosure and 3M MS2 25-pair Splice Connectors
Page | 42 Ramstein Air Base MILCON – MACC
Telecommunications Installation Guide
Communications Cable Marker
15.13.1 Cable tags shall be self-laminating, permanently labeled, easily visible and corrosion resistant. Install cable tags in all MHs/HHs, cable vaults, pulling-box, and building entrance terminal locations. When cables pass through a MH, put a tag on the cable, approximately 30 cm from each duct entrance. Information on the cable tag shall identify cable by size, type, cable number and count.
Figure 30 – Communications Cable Marker
Copper Cable Label Line 1: 24 = Fiber Count. L = Loose Tube Buffer. E9/125 = Single Mode.
Line 2: 2301-2103 = From to Building numbers. 1-24 = Cable Strand count
Fiber Optic Cable Label Line 1: CA – 38 = Cable Number – 38 (Example) IAW 86CS cable identification and numbering system.
Line 2: P1 = 100 Pair Cable. 24 = 24 AWG; P = Black Jacket Polyethylene. F = Filled Core Foamed.
Line 3: Cable Count…
This is the start of the file's text. The full file is on GovTribe.