SOW Attachment 4 - Cabling Information.pdf

PDF 61 KB Posted

Attached to
Ramstein AB EMCS Controller Upgrades and Integration
Solicitation number
FA561324Q0030
Issued by

About this file

This document is an attachment to a Request for Quotation (RFQ) for Energy Management Control System (EMCS) controller upgrades and integration at Ramstein Air Base in Germany. The attachment, titled "Cabling Information", provides details on the cabling requirements for various buildings at the base, including the number of floors, controllers, and penetrations required, as well as the approximate lengths of cable runs.

The overall RFQ solicitation is seeking to acquire building controllers, incidental installation, programming, and integration to BACnet/IP networks, as described in the Statement of Work. The solicitation has a questions due date of July 31, 2024 and a quotes due date of August 9, 2024. The work is to be performed in accordance with standard commercial practices, technical regulations for workplaces, and electrical TUV/VDE requirements. The solicitation is being issued by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA561324Q0030

Attachment 4, Cabling Information

B2117

This building has three floors. This building has 5 controllers. Approximately six wall and five floor penetrations will be required. Approximate length of one cable run: 45m, 15m, 10m, 15m, and 25m.

B2127

Two cable runs will be required. In one cable run, the cables must go to the ceiling and run with the existing building cables. Approximately one wall and one floor penetration will be required. Approximate length of one cable run: 15m and 20m

B2128

The cable run must go to the ceiling and run with the existing building cables. Approximately one wall and one floor penetration will be required. Approximate length of one cable run: 71m

B2513

This building has one floor. This building has one controller. Approximately two wall penetrations will be required. Approximate length of one cable run: 36m.

B100

This building is already networked. Approximately five network switches, 8 port, will need to be replaced with DISA Approved, managed, and TAA compliant switches. Approximately two wall penetrations will be required. Approximate length of one cable run: 60m.

B570

This building is already networked. Approximately two network switches, 8 port, will need to be replaced with DISA Approved, managed, and TAA compliant switches. Approximately one floor penetration will be required. Approximate length of one cable run: 60m.

B2018

There are three controllers in this building. The controller in the in middle of the building is on top of a 10m mezzanine. The long run from the west to the middle of the building will require an elevated work platform to install the cable and protective tubing. Approximately three wall penetrations will be required.

Approximate length of one cable run: 12m, 8m, and 95m.

B3450

This building has two floors. In certain area of the building the wall is approximately 10-15m. This building has three controllers. Approximately five wall and two floor penetrations will be required.

Approximate length of one cable run: 50m, 20m, and 60m.

B3542

This building has one controller. Approximately one wall penetration will be required. Approximate length of one cable run: 10m.

B3453

This building has one floor. This building has one controller. Approximately two wall penetrations will be required. Approximate length of one cable run: 80m.

File details come from the government source that posted it. Updated .