SOW APPENDIX 11 - Construction Security Plan_Bldg 2324.pdf
PDF 117 KB Posted
- Attached to
- General Facility Repairs-Patch Barracks Federal contract opportunity
- Solicitation number
- W912DY21R0037
About this file
This document is a construction security plan for general facility repairs to Building 2324 at Patch Barracks in Stuttgart, Germany. The project involves replacing and commissioning the HVAC system for the administrative area, replacing systems furniture, constructing a new office area, replacing carpet and ceiling, and renovating latrines. The U.S. Army Corps of Engineers is soliciting proposals under solicitation number W912DY21R0037 for a firm fixed price design-build contract to complete these repairs to meet security accreditation requirements by May 2022. The Defense Intelligence Agency occupies the building and will provide cleared personnel on site during construction. Approved storage will be on site, and normal work hours are expected to be from 0800 to 1700 Monday through Friday.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP Amendment 0002.pdf | ||
| RFP Amendment P00001.pdf | ||
| SOW APPENDIX 13 - Bldg 2324 Drawings.pdf | ||
| SOW APPENDIX 7 - Bldg 2324 Photos.pdf | ||
| SOW APPENDIX 9 - Bldg 2324 Floor Plan and New Offices.pdf | ||
| SOW APPENDIX 8 - Bldg 2324 New Offices Concept.pdf | ||
| SOW APPENDIX 10 - FFE Design Submittal Requirements Matrix.pdf | ||
| SOW APPENDIX 12 - Bldg 2324 HVAC Survey Report.pdf | ||
| RFP W912DY21R0037.pdf | ||
| Division 01 Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix 11
Construction Security Plan
Location: Building 2324, Patch Barracks, Stuttgart, Germany
Stakeholders: FAC/SEC
Date Prepared: 19 February 2021
Organization Name: DoD DIA
Assigned Site Security Manager (SSM): TBD
Cognizant Security Authority (CSA): TBD
1. SCOPE OF WORK:
The technical and security aspects of the design will conform to Intelligence community Directive (ICD) 705-1 and associated documented, inspected and constructed to achieve certification by the DIA SCIF certification authority.
Beneficial occupancy is planned for May 2022 which entails a design/build format of site investigation, 65% design, 100% design and Issued for Construction, followed by an estimated 6-8 month construction period (phasing dependent).
a. (FOUO) The location is Building 2324, Patch Barracks, Stuttgart, Germany.
b. The Defense Intelligence Agency occupies the entire building 2324. This project involves a complete replacement of the HVAC system that supports the administrative area, along with interior finish refresh, bathroom renovations and systems furniture replacement.
c. (FOUO) The project requires integrated design and construction (design/build) services to replace and commission HVAC System for administrative area, replace systems furniture, construct a new office area, replace carpet, replace ceiling, renovate latrines, along with all necessary interior wall repairs. This includes all necessary architectural, mechanical, plumbing and electrical repairs and modifications. These repairs are necessary to meet SCIF accreditation requirements.
2. (U) The materials being installed*:
Carpeting/Base Cove
Redesign and reconfigure Admin Area HVAC
Floor tiles
Ceiling grid/tiles Rough Carpentry Latrine components (toilet/sink/mirrors)
Finish Carpentry Non-Structural Metal Framing
Systems Furniture *See SOW for further details
3. (U) Construction Start Date: 1 Oct 2021 (projected)
4. (U) Construction Completion Date: 1 May 2022 (projected)
5. (U) Labor/Contracting Company: To Be Determined, under solicitation
a. U.S. citizens, and local contractors
6. (U) Secure Storage Area: All Materials will be stored at DoD approved area at Building 2324.
7. (U) Project Execution:
a. (FOUO) The Government will provide a minimum of one TS/SCI cleared person at the work site at all time.
b. The appointed SSM will handle the full-time day-to-day duties on site throughout the entire renovation.
c. (U) Contractors are expected to begin work at 0800 and end by 1700, Monday through Friday for normal working hours while Saturday and Sunday are optional and must be scheduled two days in advance with the SSM.
Name Organization Phone Number Email Address
LOG Project Officer COM:
Laura Lokey- Flippo
USACE Project Manager
COM: (256) 895-
laura.lokeyflippo@usace.army.mil
TBD DoD Site Security Officer/SSM
COM: TBD
DoD SSM Alternate COM:
10. Other relevant factors to be considered with regards to the CSP:
a. (U) The SSM or designee will control all CST logs, pictures and associated documents on site. Upon completion of the project, all documents and pictures will be turned over to the SSO. The Contractor is responsible for maintaining the CST log for all applicable activities.
b. (FOUO) Technical Surveillance Countermeasures (TSCM) inspection will be scheduled by the DoD SSO upon completion of the installation.
File details come from the government source that posted it. Updated .