South Lift Station Specs.pdf

PDF 464 KB Posted

Attached to
Fisheating Creek WMA Campground Water Treatment Plants Operator Services State and local contract opportunity
Solicitation number
ITB-14030
Issued by
Glades County, Florida

About this file

The document is a MOPS (Modular Pump Station) Pump Station Schedule from Atlantic Environmental Systems, Inc., detailing technical specifications for a submersible pump station. The schedule provides comprehensive details for a pump station with a primary design flow of 62 gallons per minute and a design head of 42 feet, utilizing a grinder-type submersible pump (model GG142XF) with a 4 horsepower motor operating at 3450 RPM. The system includes a control center, valve box assembly, and R.P.Z. (Reduced Pressure Zone) assembly, with specific technical parameters such as wet well dimensions (48" inside diameter, 84" outside diameter), elevation markers, and electrical specifications (230V, 1 phase, 53 full load amps).

The technical documentation includes precise engineering details for the pump station, with specific elevations for grade (35.50'), wet well top and bottom (35.50' and 19.50' respectively), pump activation levels, and alarm elevations. The system is configured with lead and lag pump activation points, an 8" invert pipe diameter, and a 2"/3" force main diameter. The document notes that all design parameters are job-specific and references accompanying drawings for complete implementation details. The equipment list indicates a single unit of most components, with no wet well scourer system, remote station monitor, or first-year service/maintenance contract currently specified.

View the file

Other files for this state and local contract opportunity

Other files attached to Fisheating Creek WMA Campground Water Treatment Plants Operator Services, newest first.
File Type Posted
FWC 1920-85- Price Sheet.pdf PDF
North Lift Station Specs.pdf PDF
WWTP Inspection Report 11-13-24.pdf PDF
FWC 24.25 -102 FINAL.pdf PDF
FWC 24.25-102 Addendum #2 QAs FINAL.pdf PDF
WTP Inspection Report 1-31-23.pdf PDF
FWC 24.25 -102 FINAL.pdf PDF
FWC 24.25-102 Addendum #1 Calendar of Events.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOPS SERIES ITEM DESCRIPTION

PRIMARY DESIGN FLOW (G.P.M.) 100 YEAR FLOOD ELEVATION TBD

PRIMARY DESIGN HEAD (T.D.H.) 25 YEAR FLOOD ELEVATION TBD

SECONDARY DESIGN FLOW (G.P.M.) A GRADE ELEVATION 35.50'

SECONDARY DESIGN HEAD (T.D.H.) B TOP ELEVATION OF WET WELL 35.50'

RATED PERFORMANCE SPEED C BOTTOM ELEVATION OF WET WELL 19.50'

RATED MOTOR HORSEPOWER (NOTE #5) D ALL PUMPS OFF ELEVATION 22.20'

SUBMERSIBLE PUMP TYPE (P-1,P-2) E LEAD PUMP ON ELEVATION 23.40'

PUMP MODEL NUMBER F LAG PUMP ON ELEVATION 23.90'

SERVICE ENTRANCE VOLTAGE G HIGH ALARM ELEVATION 24.40'

SERVICE ENTRANCE PHASE H INSIDE DIAMETER OF WET-WELL 48"

CONTROL CENTER FULL LOAD AMPS I OUTSIDE DIAMETER OF WET-WELL 84"

NEMA FUSIBLE DISCONNECT SWITCH,

RATED:

J MINIMUM CUBIC FEET OF

CONCRETE BALLAST COLLAR (CU YDS)

0/(0)

WET-WELL SCOURER SYSTEM K INVERT PIPE DIAMETER 8"

REMOTE STATION MONITOR L FORCE MAIN DIAMETER 2"/3"

INVERT ELEVATION 24.90'

QTY.

MOPS PUMP STATION SCHEDULE

42'

N/A

MODEL DESIGNATION

GG142XF

N/A

MOPS R.P.Z. ASSEMBLY

N3R, 60A

N/A

N/A

MOPS REMOTE STATION MONITOR

Grinder

1ST YEAR SERVICE / MAINTENANCE CONTRACT

MOPS EQUIPMENT IDENTIFICATION

MOPS CONTROL CENTER

MOPS DISCONNECT SWITCH

MOPS CONTROL CENTER MOUNTING ASSEMBLY

MOPS WET WELL SCOURER SYSTEM

MOPS PUMP STATION

MOPS VALVE BOX ASSEMBLY ( VBA)

MOPS ODOR/GAS SCRUBBER (OGS)

MOPS-B-2-2-48-192-B-4.0

VBA-2-2

OGS-B

N/A

N/A

PSC-2-2-1-4.0-I

FDS-60-1-2-PS

CCMA-32AL

N/A

All Design Parameters are job specific (See Drawing)